Pay Item Unit Prices
154 TxDOT pay items with full bid statistics from 333,275 published bids, and 487 FDOT items with at least 10 contracts in FDOT's latest 12-month report. Any other TxDOT item code opens a page computed live from the TxDOT open-data API, for example /items/txdot/260-7005.
TxDOT items
| Item | Description | Unit | Bids | Weighted median (12 mo) | Low bid (12 mo) | 12-mo trend |
|---|---|---|---|---|---|---|
| 100-7002 | Preparing ROW | STA | 3,913 | $1,500.00 | $995.00 | -25.04% |
| 104-7006 | Remov Conc (Riprap) | SY | 2,174 | $10.00 | $9.00 | -24.24% |
| 104-7011 | Remov Conc (Driveways) | SY | 2,016 | $18.21 | $15.00 | -9.46% |
| 104-7013 | Remov Conc (Sidewalk, Ramp OR SUP) | SY | 1,292 | $15.00 | $10.00 | -16.67% |
| 104-7016 | Remov Conc (Curb) | LF | 1,064 | $4.57 | $4.40 | -39.74% |
| 110-7001 | Excav (Roadway) | CY | 3,744 | $10.00 | $8.74 | -20% |
| 110-7002 | Excav (Channel) | CY | 1,465 | $18.00 | $8.60 | -20.14% |
| 132-7003 | Embank (FNL)(OC)(TY B) | CY | 1,207 | $15.00 | $9.75 | 0% |
| 132-7005 | Embank (FNL)(OC)(TY C) | CY | 1,082 | $15.00 | $16.00 | -25% |
| 132-7006 | Embank (FNL)(DC)(TY C) | CY | 1,177 | $12.00 | $10.00 | -12.87% |
| 160-7002 | Furn & Place Topsoil (4") | SY | 1,524 | $1.35 | $1.00 | -4.8% |
| 162-7002 | Block Sodding | SY | 1,942 | $3.50 | $3.55 | -12.5% |
| 164-7005 | Broadcast Seed (Temp_Warm) | SY | 1,278 | $0.15 | $0.16 | -40% |
| 164-7006 | Broadcast Seed (Temp_Cool) | SY | 1,201 | $0.15 | $0.16 | -40% |
| 168-7001 | Vegetative Watering | TGL | 4,843 | $7.00 | $6.50 | -15.76% |
| 260-7001 | Lime (COM OR QK)(Slurry) OR QK(DRY) | TON | 564 | $345.92 | $342.00 | +0.38% |
| 275-7001 | Cement | TON | 1,294 | $220.00 | $210.00 | -5.77% |
| 341-7001 | D-GR HMA TY-B PG64-22 | TON | 727 | $85.40 | $84.17 | -3.73% |
| 341-7050 | D-GR HMA TY-D SAC-B PG70-22 | TON | 396 | $125.00 | $105.60 | +7.52% |
| 341-7082 | Tack Coat | GAL | 1,125 | $4.00 | $4.30 | +0.5% |
| 344-7001 | SP Mixes SP-B PG64-22 | TON | 537 | $127.00 | $117.00 | -12.5% |
| 344-7077 | Tack Coat | GAL | 1,434 | $4.50 | $4.10 | +11.11% |
| 400-7010 | CEM Stabil Bkfl | CY | 2,973 | $133.66 | $100.00 | -18.92% |
| 401-7001 | Flowable Backfill | CY | 2,242 | $231.39 | $362.08 | -9.64% |
| 402-7001 | Trench Excavation Protection | LF | 1,681 | $4.65 | $3.26 | 0% |
| 403-7001 | Temporary SPL Shoring | SF | 1,957 | $31.39 | $20.00 | -17.73% |
| 416-7006 | Drill Shaft (36 IN) | LF | 1,226 | $270.00 | $265.00 | -5.97% |
| 416-7040 | Drill Shaft (Rdwy ILL Pole) (30 IN) | LF | 1,105 | $255.00 | $250.00 | -16.12% |
| 420-7012 | CL C Conc (Abut) | CY | 1,253 | $1,250.00 | $1,100.00 | -10% |
| 429-7007 | Conc STR Repair (Vertical & Overhead) | SF | 1,826 | $150.00 | $109.69 | -11.11% |
| 432-7001 | Riprap (Conc)(4 IN) | CY | 1,881 | $515.00 | $570.00 | -6.4% |
| 432-7002 | Riprap (Conc)(5 IN) | CY | 1,702 | $587.00 | $590.00 | -3.9% |
| 432-7013 | Riprap (MOW Strip)(4 IN) | CY | 3,466 | $645.00 | $600.00 | -3.08% |
| 432-7041 | Riprap (Stone Protection)(12 IN) | CY | 1,160 | $185.00 | $150.00 | -5.51% |
| 432-7043 | Riprap (Stone Protection)(18 IN) | CY | 1,742 | $189.00 | $155.00 | -5.35% |
| 438-7007 | Cleaning AND Sealing Exist Joints (CL7) | LF | 1,084 | $40.00 | $34.14 | -10.91% |
| 464-7003 | RC Pipe (CL III)(18 IN) | LF | 1,982 | $75.00 | $74.05 | -2.61% |
| 464-7005 | RC Pipe (CL III)(24 IN) | LF | 2,177 | $97.64 | $90.00 | -9.02% |
| 464-7007 | RC Pipe (CL III)(30 IN) | LF | 1,195 | $123.90 | $120.00 | -1.48% |
| 464-7009 | RC Pipe (CL III)(36 IN) | LF | 1,154 | $161.00 | $160.00 | -7% |
| 467-7308 | SET (TY II) (18 IN) (RCP) (6: 1) (P) | EA | 1,566 | $1,115.55 | $1,050.00 | -2.45% |
| 467-7328 | SET (TY II) (24 IN) (RCP) (6: 1) (P) | EA | 1,528 | $1,900.00 | $1,580.00 | -6.85% |
| 480-7001 | Clean Exist Culverts | EA | 1,607 | $2,000.00 | $250.00 | 0% |
| 496-7004 | Remov STR (SET) | EA | 1,564 | $450.00 | $325.00 | -1.67% |
| 496-7007 | Remov STR (Pipe) | LF | 2,189 | $21.40 | $20.00 | -4.37% |
| 500-7001 | Mobilization | LS | 12,240 | $128,675.16 | $99,600.00 | -21.47% |
| 500-7002 | Mobilization (Callout) | EA | 3,081 | $100.00 | $1.00 | +60% |
| 502-7001 | Barricades, Signs AND Traffic Handling | MO | 10,814 | $6,500.00 | $5,000.00 | -19.48% |
| 503-7001 | Portable Changeable Message Sign | DAY | 4,288 | $95.00 | $77.00 | -16.67% |
| 503-7002 | Portable Changeable Message Sign | EA | 4,323 | $9,010.00 | $6,500.00 | -20.87% |
| 505-7001 | TMA (Stationary) | DAY | 10,532 | $236.87 | $220.00 | -4.94% |
| 505-7002 | TMA (Mobile Operation) | HR | 1,401 | $80.00 | $65.00 | +9.2% |
| 505-7003 | TMA (Mobile Operation) | DAY | 5,896 | $200.00 | $50.00 | -1.15% |
| 506-7002 | Rock Filter Dams (Install) (TY 2) | LF | 1,975 | $43.17 | $42.00 | -2.17% |
| 506-7011 | Rock Filter Dams (Remove) | LF | 3,074 | $12.00 | $10.00 | -6.67% |
| 506-7020 | Construction Exits (Install) (TY 1) | SY | 1,908 | $36.00 | $35.00 | +3.13% |
| 506-7024 | Construction Exits (Remove) | SY | 2,377 | $10.00 | $9.55 | -11.06% |
| 506-7039 | Temp Sedmt Cont Fence (Install) | LF | 4,970 | $3.94 | $3.70 | -9.36% |
| 506-7041 | Temp Sedmt Cont Fence (Remove) | LF | 5,320 | $1.00 | $1.00 | -16.67% |
| 506-7043 | Biodeg Erosn Cont Logs (Instl) (8") | LF | 1,079 | $5.00 | $4.35 | -9.57% |
| 506-7044 | Biodeg Erosn Cont Logs (Instl) (12") | LF | 2,678 | $5.65 | $5.25 | -10.27% |
| 506-7046 | Biodeg Erosn Cont Logs (Remove) | LF | 4,746 | $1.00 | $1.00 | -30.05% |
| 508-7001 | Constructing Detours | SY | 1,092 | $95.00 | $90.00 | -9.09% |
| 529-7009 | Conc Curb & Gutter (TY II) | LF | 1,349 | $30.00 | $28.20 | -18.18% |
| 530-7006 | Driveways (Conc) | SY | 1,763 | $106.00 | $100.00 | -4% |
| 530-7010 | Driveways (ACP) | SY | 1,836 | $59.25 | $48.00 | -6.67% |
| 531-7001 | Conc Sidewalks (4") | SY | 1,215 | $65.00 | $60.30 | -9.68% |
| 533-7001 | Mill Rumble Strips (Asphalt) (Shldr) | LF | 1,887 | $0.18 | $0.18 | 0% |
| 533-7002 | Mill Rumble Strips (Asph) (Centerline) | LF | 1,386 | $0.20 | $0.20 | -3.85% |
| 540-7001 | MTL W-Beam GD FEN (TIM Post) | LF | 3,028 | $25.75 | $25.85 | -3.45% |
| 540-7002 | MTL W-Beam GD FEN (Steel Post) | LF | 1,434 | $31.00 | $32.60 | -2.94% |
| 540-7005 | MTL Beam GD FEN Trans (Thrie-Beam) | EA | 2,440 | $2,208.14 | $2,185.00 | -3.81% |
| 540-7015 | Downstream Anchor Terminal Section | EA | 2,011 | $1,485.00 | $1,500.00 | 0% |
| 542-7001 | Remove Metal Beam Guard Fence | LF | 3,118 | $2.55 | $2.50 | -9.09% |
| 542-7002 | Remove Terminal Anchor Section | EA | 1,359 | $250.00 | $250.00 | -9.09% |
| 544-7001 | Guardrail END Treatment (Install) | EA | 4,215 | $3,375.90 | $3,400.00 | +2.94% |
| 544-7003 | Guardrail END Treatment (Remove) | EA | 2,340 | $255.00 | $275.00 | -8.33% |
| 545-7002 | Crash Cush Atten (Move & Reset) | EA | 1,363 | $1,350.00 | $1,250.00 | -7.25% |
| 545-7004 | Crash Cush Atten (Remove) | EA | 1,707 | $895.48 | $850.00 | -9.09% |
| 545-7014 | Crash Cush Atten (Instl)(S)(N)(TL3) | EA | 1,128 | $8,430.00 | $7,725.00 | -4.62% |
| 618-7030 | Condt (PVC) (SCH 40) (2") | LF | 1,578 | $12.10 | $11.38 | -3.12% |
| 618-7054 | Condt (PVC) (SCH 80) (2") | LF | 1,169 | $10.30 | $10.00 | -19.6% |
| 618-7055 | Condt (PVC) (SCH 80) (2") (Bore) | LF | 1,252 | $21.00 | $21.34 | -12.67% |
| 620-7007 | Elec Condr (NO.8) Bare | LF | 1,456 | $1.95 | $1.95 | -8.17% |
| 620-7008 | Elec Condr (NO.8) Insulated | LF | 1,546 | $2.05 | $1.96 | -8% |
| 620-7009 | Elec Condr (NO.6) Bare | LF | 1,571 | $2.22 | $2.20 | -6.89% |
| 620-7010 | Elec Condr (NO.6) Insulated | LF | 1,563 | $2.52 | $2.26 | -6.67% |
| 624-7002 | Ground BOX TY A (122311)W/Apron | EA | 1,296 | $1,431.00 | $1,400.00 | -4.8% |
| 624-7008 | Ground BOX TY D (162922)W/Apron | EA | 1,464 | $1,613.17 | $1,545.50 | -2.94% |
| 636-7001 | Aluminum Signs (TY A) | SF | 1,494 | $45.00 | $45.00 | +5.26% |
| 644-7001 | IN SM RD SN Sup&am TY10BWG(1)SA(P) | EA | 3,583 | $683.00 | $654.50 | -1.92% |
| 644-7004 | IN SM RD SN Sup&am TY10BWG(1)SA(T) | EA | 2,690 | $790.00 | $745.00 | -4.16% |
| 644-7007 | IN SM RD SN Sup&am TY10BWG(1)SA(U) | EA | 1,100 | $1,000.00 | $955.37 | -4.1% |
| 644-7028 | IN SM RD SN Sup&am TYS80(1)SA(T) | EA | 1,361 | $990.00 | $970.00 | +0.83% |
| 644-7031 | IN SM RD SN Sup&am TYS80(1)SA(U) | EA | 1,366 | $1,203.60 | $1,270.00 | 0% |
| 644-7065 | Relocate SM RD SN Sup&am TY 10BWG | EA | 1,058 | $642.60 | $547.30 | -7.14% |
| 644-7073 | Remove SM RD SN Sup&am | EA | 4,036 | $100.00 | $100.00 | -11.36% |
| 658-7013 | Instl DEL Assm (D-SW)SZ 1(BRF)CTB (BI) | EA | 1,301 | $30.00 | $33.00 | -8.33% |
| 658-7019 | Instl DEL Assm (D-SW)SZ 1(BRF)GF2(BI) | EA | 2,045 | $25.00 | $35.00 | -2.78% |
| 662-7008 | WK ZN PAV MRK NON-Remov (W)6"(SLD) | LF | 1,640 | $0.25 | $0.21 | 0% |
| 662-7038 | WK ZN PAV MRK NON-Remov (Y)6"(SLD) | LF | 1,876 | $0.22 | $0.21 | -7.89% |
| 662-7068 | WK ZN PAV MRK Remov (W)6"(SLD) | LF | 1,377 | $0.76 | $0.75 | -9.09% |
| 662-7100 | WK ZN PAV MRK Remov (Y)6"(SLD) | LF | 1,456 | $0.80 | $0.75 | -9.09% |
| 662-7112 | WK ZN PAV MRK SHT Term (TAB)TY W | EA | 2,364 | $1.08 | $1.07 | -12.43% |
| 662-7114 | WK ZN PAV MRK SHT Term (TAB)TY Y-2 | EA | 2,369 | $1.00 | $1.00 | -7.98% |
| 666-7009 | Refl PAV MRK TY I (W)6"(DOT)(100MIL) | LF | 1,328 | $1.00 | $1.00 | -16.25% |
| 666-7018 | Refl PAV MRK TY I (W)8"(DOT)(100MIL) | LF | 1,285 | $1.05 | $1.00 | -17.5% |
| 666-7024 | Refl PAV MRK TY I (W)8"(SLD)(100MIL) | LF | 3,421 | $0.85 | $0.79 | -10.83% |
| 666-7030 | Refl PAV MRK TY I (W)12"(SLD)(100MIL) | LF | 1,314 | $3.00 | $2.25 | -1.13% |
| 666-7036 | Refl PAV MRK TY I (W)24"(SLD)(100MIL) | LF | 3,161 | $7.00 | $6.90 | -13.84% |
| 666-7042 | Refl PAV MRK TY I (W)(Arrow)(100MIL) | EA | 1,754 | $150.00 | $145.00 | -13.85% |
| 666-7066 | Refl PAV MRK TY I (W)(Word)(100MIL) | EA | 1,741 | $175.00 | $175.00 | -16.95% |
| 666-7175 | RE PM TY II (W) 6" (SLD) | LF | 1,348 | $0.16 | $0.15 | -10% |
| 666-7213 | RE PM TY II (Y) 6" (SLD) | LF | 1,321 | $0.17 | $0.15 | +12.68% |
| 666-7266 | RE Profile PM TY I(W)6"(SLD)(100MIL) | LF | 1,319 | $0.67 | $0.60 | -5.05% |
| 666-7270 | RE Profile PM TY I(Y)6"(SLD)(100MIL) | LF | 1,191 | $0.68 | $0.60 | -5% |
| 666-7347 | Pavement Sler 6" | LF | 2,252 | $0.19 | $0.15 | -25.53% |
| 666-7348 | Pavement Sler 8" | LF | 1,294 | $0.29 | $0.21 | -20% |
| 666-7352 | Pavement Sler 24" | LF | 1,512 | $1.65 | $1.26 | -17.16% |
| 666-7353 | Pavement Sler (Arrow) | EA | 1,144 | $25.00 | $23.00 | -26% |
| 666-7354 | Pavement Sler (Word) | EA | 1,085 | $30.00 | $27.00 | -33.33% |
| 666-7408 | Refl PAV MRK TY I (W)6"(BRK)(100MIL) | LF | 2,334 | $0.52 | $0.49 | -5.06% |
| 666-7411 | Refl PAV MRK TY I (W)6"(SLD)(100MIL) | LF | 3,148 | $0.45 | $0.40 | 0% |
| 666-7420 | Refl PAV MRK TY I (Y)6"(BRK)(100MIL) | LF | 1,862 | $0.45 | $0.42 | +4.29% |
| 666-7423 | Refl PAV MRK TY I (Y)6"(SLD)(100MIL) | LF | 3,378 | $0.45 | $0.42 | 0% |
| 668-7089 | Prefab PM TY C (W)(24")(SLD) | LF | 1,539 | $13.00 | $12.00 | -7.54% |
| 668-7091 | Prefab PM TY C (W)(Arrow) | EA | 2,072 | $200.00 | $190.00 | -4% |
| 668-7103 | Prefab PM TY C (W)(Word) | EA | 1,962 | $250.00 | $233.37 | -3.33% |
| 672-7002 | Refl PAV Mrkr TY I-C | EA | 3,511 | $4.00 | $3.95 | -12.5% |
| 672-7004 | Refl PAV Mrkr TY II-A-A | EA | 5,303 | $4.00 | $4.00 | -8.33% |
| 672-7006 | Refl PAV Mrkr TY II-C-R | EA | 2,885 | $4.00 | $4.00 | -14.17% |
| 677-7001 | Elim EXT PM & Mrks (4") | LF | 2,358 | $0.15 | $0.14 | -15.29% |
| 677-7002 | Elim EXT PM & Mrks (6") | LF | 2,138 | $0.29 | $0.15 | +6.67% |
| 677-7004 | Elim EXT PM & Mrks (8") | LF | 1,857 | $0.55 | $0.42 | -9.09% |
| 677-7006 | Elim EXT PM & Mrks (12") | LF | 1,234 | $1.00 | $1.00 | -14.53% |
| 677-7008 | Elim EXT PM & Mrks (24") | LF | 2,128 | $2.80 | $2.10 | -20% |
| 677-7009 | Elim EXT PM & Mrks (Arrow) | EA | 1,615 | $50.00 | $40.00 | -14.52% |
| 677-7015 | Elim EXT PM & Mrks (Word) | EA | 1,463 | $50.00 | $45.00 | -11.75% |
| 678-7002 | PAV Surf Prep FOR MRK (6") | LF | 2,437 | $0.02 | $0.02 | -20.72% |
| 678-7004 | PAV Surf Prep FOR MRK (8") | LF | 1,375 | $0.06 | $0.05 | -18.37% |
| 678-7008 | PAV Surf Prep FOR MRK (24") | LF | 1,637 | $0.50 | $0.50 | -9.09% |
| 678-7009 | PAV Surf Prep FOR MRK (Arrow) | EA | 1,254 | $10.00 | $5.25 | -36% |
| 678-7016 | PAV Surf Prep FOR MRK (Word) | EA | 1,195 | $13.00 | $13.50 | -36% |
| 682-7001 | VEH SIG SEC (12")LED(GRN) | EA | 1,150 | $345.00 | $325.00 | 0% |
| 682-7002 | VEH SIG SEC (12")LED(GRN ARW) | EA | 1,179 | $345.00 | $325.00 | 0% |
| 682-7003 | VEH SIG SEC (12")LED(YEL) | EA | 1,358 | $345.00 | $325.00 | 0% |
| 682-7004 | VEH SIG SEC (12")LED(YEL ARW) | EA | 1,169 | $343.00 | $325.00 | 0% |
| 682-7005 | VEH SIG SEC (12")LED(RED) | EA | 1,327 | $345.00 | $325.00 | 0% |
| 682-7006 | VEH SIG SEC (12")LED(RED ARW) | EA | 1,132 | $345.00 | $330.00 | 0% |
| 682-7018 | PED SIG SEC (LED)(Countdown) | EA | 1,039 | $765.59 | $721.00 | -7.11% |
| 687-7001 | PED Pole Assembly | EA | 1,124 | $2,860.00 | $2,700.00 | -15.17% |
| 688-7001 | PED Detect Push Button (APS) | EA | 1,063 | $1,020.00 | $950.00 | -9.7% |
| 752-7005 | Tree Removal (4" - 12" DIA) | EA | 1,234 | $75.00 | $45.00 | +56.82% |
| 3007-7001 | Bonding Course | GAL | 1,204 | $4.00 | $3.24 | -1.82% |
FDOT items
FDOT statewide weighted averages, Nov 1, 2025 to Oct 31, 2026.
| Item | Description | Unit | Contracts | Weighted average |
|---|---|---|---|---|
| 0102 1 | Maintenance OF Traffic | DA | 266 | $1,069.75 |
| 0102 60 | Work Zone Sign | ED | 265 | $0.23 |
| 0102 74 1 | Channelizing Device- Types I, II, DI, VP, Drum, OR LCD | ED | 263 | $0.11 |
| 0102 99 | Portable Changeable Message Sign, Temporary | ED | 257 | $10.81 |
| 0999 25 | Initial Contingency Amount, DO NOT BID | LS | 252 | $56,276.59 |
| 0110 1 1 | Clearing & Grubbing | AC | 231 | $52,554.01 |
| 0706 1 3 | Raised Pavement Marker, Type B | EA | 231 | $4.89 |
| 0570 1 2 | Performance Turf, SOD | SY | 230 | $4.31 |
| 0710 90 | Painted Pavement Markings, Final Surface | LS | 223 | $37,166.90 |
| 0107 1 | Litter Removal | AC | 217 | $28.01 |
| 0107 2 | Mowing | AC | 214 | $33.71 |
| 0102 76 | Arrow Board / Advance Warning Arrow Panel | ED | 208 | $5.10 |
| 0102115 | Type III Barricade | ED | 208 | $0.54 |
| 0104 18 | Inlet Protection System | EA | 204 | $170.49 |
| 0711 16201 | Thermoplastic, Standard-Other Surfaces, Yellow, Solid, 6" | GM | 204 | $5,264.57 |
| 0711 16101 | Thermoplastic, Standard-Other Surfaces, White, Solid, 6" | GM | 202 | $5,320.58 |
| 0700 1111 | Single Column Ground Sign Assembly, F&I Ground Mount, Less Than 12 SF | EA | 199 | $562.79 |
| 0104 10 3 | Sediment Barrier | LF | 197 | $2.17 |
| 0102 14 | Traffic Control Officer | HR | 194 | $53.78 |
| 0110 4 10 | Removal OF Existing Concrete | SY | 194 | $34.86 |
| 0700 1600 | Single Column Ground Sign Assembly, Remove | EA | 193 | $53.69 |
| 0711 11125 | Thermoplastic, Standard, White, Solid, 24" FOR Stop Line AND Crosswalk | LF | 188 | $7.00 |
| 0711 11170 | Thermoplastic, Standard, White, Arrow | EA | 181 | $86.63 |
| 0710 11101 | Painted Pavement Markings, Standard, White, Solid, 6" | GM | 177 | $1,691.86 |
| 0710 11201 | Painted Pavement Markings, Standard, Yellow, Solid, 6" | GM | 176 | $1,745.98 |
| 0327 70 6 | Milling Existing Asphalt Pavement, 1 1/2" AVG Depth | SY | 173 | $2.79 |
| 0630 2 12 | Conduit, Furnish & Install, Directional Bore | LF | 171 | $34.57 |
| 0522 2 | Concrete Sidewalk AND Driveways, 6" Thick | SY | 168 | $95.64 |
| 0635 2 11 | Pull & Splice BOX, F&I, 13" X 24" Cover Size | EA | 168 | $1,430.96 |
| 0102 74 8 | Channelizing Device- Pedestrian LCD (Longitudinal Channelizing Device) | FD | 165 | $0.06 |
| 0711 11124 | Thermoplastic, Standard, White, Solid, 18" FOR Diagonals AND Chevrons | LF | 165 | $5.52 |
| 0711 11123 | Thermoplastic, Standard, White, Solid, 12" FOR Crosswalk AND Roundabout | LF | 158 | $3.76 |
| 0630 2 11 | Conduit, Furnish & Install, Open Trench | LF | 157 | $17.21 |
| 0527 2 | Detectable Warnings | SF | 154 | $36.26 |
| 0711 11224 | Thermoplastic, Standard, Yellow, Solid, 18" FOR Diagonal OR Chevron | LF | 150 | $5.06 |
| 0711 11160 | Thermoplastic, Standard, White, Message OR Symbol | EA | 149 | $177.80 |
| 0520 1 10 | Concrete Curb & Gutter, Type F | LF | 148 | $40.38 |
| 0711 14125 | Thermoplastic, Preformed, White, Solid, 24" FOR Crosswalk | LF | 148 | $15.72 |
| 0700 1112 | Single Column Ground Sign Assembly, F&I Ground Mount, 12.0-20.0 SF | EA | 147 | $2,123.77 |
| 0711 11141 | Thermoplastic, Standard, White, 2-4 Dotted Guideline/ 6-10 GAP Extension, 6" | GM | 145 | $2,686.55 |
| 0102104 | Temporary Signalization AND Maintenance, Intersection | ED | 143 | $18.47 |
| 0102107 1 | Temporary Traffic Detection AND Maintenance, Intersection | ED | 143 | $15.36 |
| 0120 1 | Regular Excavation | CY | 142 | $7.20 |
| 0710 11125 | Painted Pavement Markings, Standard, White, Solid FOR Stop Line OR Crosswalk, 24" | LF | 141 | $2.24 |
| 0711 16131 | Thermoplastic, Standard-Other Surfaces, White, Skip, 6",10-30 Skip OR 3-9 Lane Drop | GM | 139 | $1,921.92 |
| 0633 6 | Fiber Optic Cable Locator | DA | 137 | $154.95 |
| 0160 4 | Type B Stabilization | SY | 135 | $5.11 |
| 0711 11241 | Thermoplastic, Standard, Yellow, 2-4 Dotted Guide Line /6-10 Dotted Extension Line, 6" | GM | 135 | $2,941.93 |
| 0710 11170 | Painted Pavement Markings, Standard, White, Arrows | EA | 131 | $44.32 |
| 0337 7 83 | Asphalt Concrete Friction Course,Traffic C, FC-12.5, PG 76-22 | TN | 129 | $160.59 |
| 0120 6 | Embankment | CY | 127 | $10.46 |
| 0710 11131 | Painted Pavement Markings, Standard, White, Skip, 10-30 OR 3-9 Skip, 6" Wide | GM | 127 | $786.94 |
| 0522 1 | Concrete Sidewalk AND Driveways, 4" Thick | SY | 126 | $66.35 |
| 0700 1500 | Single Column Ground Sign Assembly, Relocate | EA | 121 | $371.65 |
| 0632 7 1 | Signal Cable- NEW OR Reconstructed Intersection, Furnish & Install | PI | 114 | $11,586.82 |
| 0710 11123 | Painted Pavement Markings, Standard, White, Solid FOR Crosswalk AND Roundabout, 12" | LF | 110 | $1.48 |
| 0639 2 1 | Electrical Service Wire, Furnish & Install | LF | 108 | $13.20 |
| 0700 13 15 | Retroreflective Sign Strip- Furnish AND Install, 5' | EA | 108 | $102.80 |
| 0710 11141 | Painted Pavement Markings, Standard, White, 2-4 Dotted Guideline/ 6-10 Dotted Extension, 6" | GM | 107 | $817.89 |
| 0710 11160 | Painted Pavement Markings, Standard, White, Message OR Symbol | EA | 104 | $59.03 |
| 0641 2 12 | Prestressed Concrete Pole, F&I, Type P-II Service Pole | EA | 102 | $2,585.82 |
| 0711 14160 | Thermoplastic, Preformed, White, Message | EA | 102 | $232.85 |
| 0646 1 11 | Aluminum Signals Pole, Pedestal | EA | 99 | $2,806.48 |
| 0653 1 11 | Pedestrian Signal, Furnish & Install LED Countdown, 1 WAY | AS | 98 | $1,049.25 |
| 0710 11124 | Painted Pavement Markings, Standard, White, Solid FOR Diagonal OR Chevron, 18" | LF | 98 | $2.01 |
| 0710 11241 | Painted Pavement Markings, Standard, Yellow, 2-4 Dotted Guideline/6-10 Dotted Extension, 6" | GM | 98 | $880.73 |
| 0339 1 | Miscellaneous Asphalt Pavement | TN | 96 | $280.68 |
| 0430175118 | Pipe Culvert,Optional Material,Round, 18"S/CD | LF | 95 | $127.04 |
| 0710 11102 | Painted Pavement Markings, Standard, White, Solid FOR Interchange AND Urban Island, 8" | GM | 91 | $2,258.10 |
| 0711 14170 | Thermoplastic, Preformed, White, Arrow | EA | 91 | $130.25 |
| 0710 11224 | Painted Pavement Markings, Standard, Yellow, Solid FOR Diagonal OR Chevron, 18" | LF | 89 | $2.14 |
| 0713103101 | Permanent Tape, White, Solid, 6" FOR Concrete Bridges | GM | 89 | $37,305.13 |
| 0713103201 | Permanent Tape, Yellow, Solid, 6" FOR Concrete Bridges | GM | 89 | $35,284.68 |
| 0711 16102 | Thermoplastic, Standard-Other Surfaces, White, Solid, 8" | GM | 88 | $7,002.85 |
| 0665 1 11 | Pedestrian Detector, Furnish & Install, Standard | EA | 86 | $448.20 |
| 0334 1 13 | Superpave Asphaltic Conc, Traffic C | TN | 84 | $133.82 |
| 0334 1 53 | Superpave Asphaltic Concrete, Traffic C, PG76-22 | TN | 84 | $147.66 |
| 0536 73 | Guardrail Removal | LF | 84 | $1.23 |
| 0639 1122 | Electrical Power Service, F&I, Underground, Meter Purchased BY Contractor | AS | 84 | $5,545.22 |
| 0660 2106 | Loop Assembly, F&I, Type F | AS | 84 | $1,828.60 |
| 0700 3601 | Sign Panel, Remove, UP TO 12 SF | EA | 83 | $55.04 |
| 0285701 | Optional Base, Base Group 01 | SY | 82 | $18.54 |
| 0632 7 6 | Signal Cable, Remove- Intersection | PI | 81 | $1,445.02 |
| 0102 4 1 | Pedestrian OR Bicycle Special Detour | SY | 80 | $55.15 |
| 0425 5 | Manhole, Adjust | EA | 80 | $1,119.50 |
| 0646 1 60 | Aluminum Signals Pole, Remove | EA | 80 | $564.62 |
| 0715 1 12 | Lighting Conductors, F&I, Insulated, NO.8 - 6 | LF | 79 | $2.53 |
| 0715500 1 | Pole Cable Distribution System, Furnish AND Install, Conventional | EA | 79 | $669.38 |
| 0635 2 12 | Pull & Splice BOX, F&I, 24" X 36" Cover Size | EA | 77 | $2,733.97 |
| 0705 10 1 | Object Marker, Type 1 | EA | 77 | $291.73 |
| 0536 1 1 | Guardrail -Roadway, General TL-3 | LF | 76 | $24.61 |
| 0536 85 24 | Guardrail END Treatment- Parallel Approach Terminal | EA | 76 | $3,264.12 |
| 0611 1 1 | Itsfm Subsurface Documentation- Project Length | MI | 75 | $4,403.92 |
| 0104 11 | Floating Turbidity Barrier | LF | 74 | $14.15 |
| 0327 70 4 | Milling Existing Asphalt Pavement, 3" AVG Depth | SY | 73 | $2.91 |
| 0700 1113 | Single Column Ground Sign Assembly, F&I Ground Mount, 20.1-30.0 SF | EA | 73 | $2,552.63 |
| 0520 1 7 | Concrete Curb & Gutter, Type E | LF | 70 | $36.29 |
| 0711 16231 | Thermoplastic, Standard-Other Surfaces, Yellow, Skip, 6" | GM | 69 | $2,091.82 |
| 0102 2200 | Special Detour- Temporary Pavement | SY | 67 | $21.92 |
| 0650 1 14 | Vehicular Traffic Signal, Furnish & Install Aluminum, 3 Section, 1 WAY | AS | 67 | $1,851.29 |
| 0700 3101 | Sign Panel, Furnish & Install Ground Mount, UP TO 12 SF | EA | 67 | $299.75 |
| 0102 71 13 | Temporary Barrier, F&I, LOW Profile, Concrete | LF | 65 | $32.06 |
| 0104 15 | Soil Tracking Prevention Device | EA | 65 | $3,814.24 |
| 0633 2 31 | Fiber Optic Connection, Install, Splice | EA | 65 | $57.18 |
| 0695 1 1 | Traffic Monitoring Site Vehicle Sensor-NON-Weight, Furnish & Install | EA | 65 | $2,882.93 |
| 0700 2600 | Multi-Column Ground Sign Assembly, Remove | EA | 65 | $1,132.48 |
| 0700 3201 | Sign Panel, Furnish & Install Overhead Mount, UP TO 12 SF | EA | 65 | $1,043.04 |
| 0684 1 1 | Managed Field Ethernet Switch, Furnish & Install | EA | 64 | $8,878.01 |
| 0704 1 4 | Tubular Marker, 36" Yellow Post | EA | 64 | $175.00 |
| 0711 17 1 | Thermoplastic, Remove Existing Thermoplastic Pavement Markings- Surface TO Remain | SF | 64 | $3.96 |
| 0102150 2 | Radar Speed Display Unit | ED | 63 | $4.88 |
| 0108 1 | Monitor Existing Structures- Inspection AND Settlement Monitoring | LS | 63 | $21,264.77 |
| 0285709 | Optional Base, Base Group 09 | SY | 62 | $25.01 |
| 0430175124 | Pipe Culvert,Optional Material,Round, 24"S/CD | LF | 62 | $137.75 |
| 0546 72 3 | Ground-IN Rumble Strips, 8" Sinusoidal | GM | 62 | $2,731.41 |
| 0639 3 11 | Electrical Service Disconnect, F&I, Pole Mount | EA | 62 | $2,738.60 |
| 0713103181 | Permanent Tape, White, 10-30 Skip, 6" Wide, FOR Concrete Surfaces | GM | 62 | $11,658.55 |
| 0695 6 12 | Traffic Monitoring Site Inductive Loop Assembly, Furnish & Install, 2 Loops | EA | 61 | $2,517.36 |
| 0102 89 1 | Temporary Crash Cushion, Redirective Option | LO | 60 | $1,066.05 |
| 0102112 | Existing ITS Maintenance | DA | 58 | $143.95 |
| 0633 3 12 | Fiber Optic Connection Hardware, F&I, Splice Tray | EA | 58 | $65.80 |
| 0665 1 60 | Pedestrian Detector, Remove- Pole/Pedestal TO Remain | EA | 58 | $117.29 |
| 0700 5 22 | Internally Illuminated Sign, Furnish & Install, Overhead Mount, 12-18 SF | EA | 58 | $5,613.01 |
| 0102150 1 | Portable Regulatory, Sign | ED | 57 | $4.48 |
| 0630 2 14 | Conduit, Furnish & Install, Aboveground | LF | 57 | $42.51 |
| 0713103381 | Permanent Tape, Black, 10-30 Skip, 6" Wide, FOR Concrete Surfaces | GM | 57 | $11,218.32 |
| 0120 2 2 | Borrow Excavation, Truck Measure | CY | 55 | $40.45 |
| 0536 85 20 | Guardrail END Treatment- Trailing Anchorage | EA | 55 | $1,643.44 |
| 0337 7 25 | Asphalt Concrete Friction Course, INC BIT, FC-5, PG 76-22 | TN | 54 | $202.39 |
| 0660 2102 | Loop Assembly, F&I, Type B | AS | 54 | $1,545.86 |
| 0711 15101 | Thermoplastic, Standard-Open Graded Asphalt Surfaces White, Solid, 6" | GM | 54 | $5,953.91 |
| 0425 6 | Valve Boxes, Adjust | EA | 53 | $983.70 |
| 0715 1 60 | Lighting Conductors, Remove & Dispose, Contractor Owns | LF | 53 | $0.54 |
| 0327 70 5 | Milling Existing Asphalt Pavement, 2" AVG Depth | SY | 52 | $1.90 |
| 0530 74 | Bedding Stone | TN | 52 | $127.87 |
| 0711 11102 | Thermoplastic, Standard, White, Solid, 8" FOR Interchange AND Urban Island | GM | 52 | $7,912.54 |
| 0611 2 1 | Itsfm Location Documentation- Intersection | EA | 51 | $3,088.59 |
| 0102 2300 | Special Detour- Temporary Earthwork/Base | CY | 50 | $46.54 |
| 0520 2 4 | Concrete Curb, Type D | LF | 50 | $36.96 |
| 0520 70 | Concrete Traffic Separator, Special- Variable Width | SY | 50 | $131.63 |
| 0633 1121 | Fiber Optic Cable, F&I, Underground,2-12 Fibers | LF | 50 | $4.38 |
| 0633 3 11 | Fiber Optic Connection Hardware, F&I, Splice Enclosure | EA | 50 | $1,655.03 |
| 0639 2 6 | Electrical Service Wire, Remove | LF | 50 | $1.33 |
| 0711 15131 | Thermoplastic, Standard-Open Graded Asphalt Surfaces, White, Skip, 6",10-30 Skip OR 3-9 Lane Drop | GM | 50 | $2,619.56 |
| 0711 15201 | Thermoplastic, Standard-Open Graded Asphalt Surfaces, Yellow, Solid, 6" | GM | 50 | $5,924.31 |
| 0102 71 15 | Temporary Barrier, F&I, Anchored | LF | 49 | $22.91 |
| 0104 12 | Staked Turbidity Barrier- Nylon Reinforced PVC | LF | 49 | $8.74 |
| 0633 3 16 | Fiber Optic Connection Hardware, F&I, Patch Panel- Field Terminated | EA | 49 | $1,827.55 |
| 0337 7 81 | Asphalt Concrete Friction Course,Traffic B, FC-12.5, PG 76-22 | TN | 48 | $150.74 |
| 0108 2 | Monitor Existing Structures- Vibration Monitoring | LS | 47 | $15,442.35 |
| 0110 21 | Tree Protection Barrier | LF | 47 | $4.87 |
| 0641 2 60 | Prestressed Concrete Pole, Complete Pole Removal- Pedestal/Service Pole | EA | 47 | $870.82 |
| 0102 71 23 | Temporary Barrier, Relocate, LOW Profile Concrete | LF | 46 | $12.20 |
| 0285706 | Optional Base, Base Group 06 | SY | 46 | $19.91 |
| 0327 70 11 | Milling Existing Asphalt Pavement, 2 1/4" AVG Depth | SY | 46 | $2.22 |
| 0530 3 4 | Riprap, Rubble, F&I, Ditch Lining | TN | 46 | $126.76 |
| 0653 1 12 | Pedestrian Signal, Furnish & Install LED Countdown, 2 Ways | AS | 46 | $1,915.66 |
| 0685 2 1 | Remote Power Management Unit- Rpmu, Furnish AND Install | EA | 46 | $1,087.86 |
| 0715 69000 | Light Pole Complete, Remove Pole AND Foundation | EA | 46 | $835.22 |
| 0334 1 12 | Superpave Asphaltic Conc, Traffic B | TN | 45 | $151.60 |
| 0700 2114 | Multi-Column Ground Sign Assembly, F&I Ground Mount, 30.1-50.0 SF | EA | 45 | $8,133.93 |
| 0705 11 1 | Delineator, Flexible Tubular | EA | 45 | $120.50 |
| 0715 7 11 | Load Center, F&I, Secondary Voltage | EA | 45 | $20,487.97 |
| 0999 16 | Partnering, DO NOT BID | LS | 45 | $8,911.11 |
| 0660 4 12 | Vehicle Detection System- Video, Furnish & Install Above Ground Equipment | EA | 43 | $7,890.18 |
| 0670 5600 | Traffic Controller Assembly, Remove Controller With Cabinet | AS | 43 | $1,436.45 |
| 0650 2109 | Vehicular Signal Auxiliaries, Repair/Replace/Retrofit- Furnish & Install, Backplate- Flexible Required | EA | 42 | $641.69 |
| 0653 1 60 | Pedestrian Signal, Remove PED Signal- Pole/Pedestal TO Remain | AS | 42 | $198.52 |
| 0710 11231 | Painted Pavement Markings, Standard, Yellow, Skip, 6" | GM | 42 | $752.84 |
| 0425 5 1 | Manhole, Adjust, Utilities | EA | 41 | $1,452.45 |
| 0660 4 11 | Vehicle Detection System- Video, Furnish & Install Cabinet Equipment | EA | 41 | $14,779.31 |
| 0285711 | Optional Base, Base Group 11 | SY | 40 | $29.89 |
| 0635 2 14 | Pull & Splice BOX, F&I, 17" X 30" Cover Size | EA | 40 | $1,763.94 |
| 0711 16133 | Thermoplastic, Standard-Other Surfaces White, Skip, 12"- Approach TO Toll Plaza OR 3-9 Lane Drop | GM | 40 | $6,159.76 |
| 0715 1 13 | Lighting Conductors, F&I, Insulated, NO 4 TO NO 2 | LF | 40 | $3.93 |
| 0635 2 13 | Pull & Splice BOX, F&I, 30" X 60" Rectangular OR 36" Round Cover Size | EA | 39 | $5,683.80 |
| 0120 71 | Regular Excavation (3-R Projects Only) | LS | 38 | $32,244.84 |
| 0425 1351 | Inlets, Curb, Type P-5, <10' | EA | 38 | $9,463.26 |
| 0425 1521 | Inlets, DT BOT, Type C,<10' | EA | 38 | $6,260.63 |
| 0715 11211 | Luminaire, F&I- Replace Existing Luminaire ON Existing Pole/ARM, Roadway, Cobra Head | EA | 38 | $1,013.16 |
| 0102909 | Temporary Raised Rumble Strips- PER DAY, Includes ALL Sets AND Relocations | DA | 37 | $24.09 |
| 0430175136 | Pipe Culvert, OPT Material, Round, 36"S/CD | LF | 37 | $209.42 |
| 0611 2 2 | Itsfm Location Documentation- ITS Site | EA | 37 | $2,103.61 |
| 0633 2 32 | Fiber Optic Connection, Install, Termination | EA | 37 | $94.37 |
| 0102913 21 | Removable Tape, White, Solid 6" | GM | 36 | $11,630.04 |
| 0110 3 | Removal OF Existing Structures/Bridges | SF | 36 | $58.97 |
| 0430982125 | Mitered END Section, Optional Round, 18" CD | EA | 36 | $2,858.34 |
| 0671 2 40 | Traffic Controller, Modify | EA | 36 | $2,858.10 |
| 0120 4 | Subsoil Excavation | CY | 35 | $12.74 |
| 0334 1 52 | Superpave Asphaltic Concrete, Traffic B, PG76-22 | TN | 35 | $143.90 |
| 0425 1541 | Inlets, DT BOT, Type D, <10' | EA | 35 | $7,311.31 |
| 0425 2 61 | Manholes, P-8, <10' | EA | 35 | $7,273.90 |
| 0650 1 16 | Vehicular Traffic Signal, Furnish & Install Aluminum, 4 Section, 1 WAY | AS | 35 | $2,345.98 |
| 0700 3501 | Sign Panel, Relocate, UP TO 12 SF | EA | 35 | $184.88 |
| 0704 1 3 | Tubular Marker, 36" White Post | EA | 35 | $178.12 |
| 0102 71 25 | Temporary Barrier, Relocate, Anchored | LF | 34 | $8.62 |
| 0400 0 11 | Concrete Class NS, Gravity Wall Index 400-011 | CY | 34 | $898.26 |
| 0711 11180 | Thermoplastic, Standard, White, Yield Line | LF | 34 | $12.77 |
| 0425 2 41 | Manholes, P-7, <10' | EA | 33 | $7,512.23 |
| 0430175130 | Pipe Culvert, OPT Material, Round, 30"S/CD | LF | 33 | $228.86 |
| 0650 1 60 | Vehicular Traffic Signal, Remove- Poles TO Remain | AS | 33 | $283.67 |
| 0102 3 | Commercial Material FOR Temporary Driveway Maintenance | CY | 32 | $59.36 |
| 0430175115 | Pipe Culvert,Optional Material,Round, 15"S/CD | LF | 32 | $222.36 |
| 0515 1 2 | Pipe Handrail - Guiderail, Aluminum | LF | 32 | $77.10 |
| 0520 6 | Shoulder Gutter- Concrete | LF | 32 | $35.05 |
| 0639 1620 | Electrical Power Service, Remove Underground | AS | 32 | $990.24 |
| 0646 1 12 | Aluminum Signals Pole, Furnish & Install Pedestrian Detector Post | EA | 32 | $2,078.32 |
| 0102 61 | Business Sign | EA | 31 | $24.01 |
| 0327 70 19 | Milling Existing Asphalt Pavement, 3/4" AVG Depth | SY | 31 | $2.13 |
| 0334 1 55 | Superpave Asphaltic Concrete, Traffic E, PG76-22 | TN | 31 | $149.66 |
| 0685 1 13 | Uninterruptible Power Supply, Furnish AND Install, Line Interactive With Cabinet | EA | 31 | $15,957.08 |
| 0711 15102 | Thermoplastic, Standard-Open Graded Asphalt Surfaces, White, Solid, 8" | GM | 31 | $7,473.15 |
| 0110 22 | Tree Root AND Branch Pruning | EA | 30 | $828.28 |
| 0430984125 | Mitered END Section, Optional Round, 18" SD | EA | 30 | $2,480.73 |
| 0639 8130 | Electrical Power Service- Contribution IN AID OF Construction (Ciac), FPL (DO NOT BID) | LS | 30 | $136,448.13 |
| 0102913 31 | Removable Tape, Yellow, Solid, 6" | GM | 29 | $11,708.40 |
| 0400 4 5 | Concrete Class IV, Bridge Substructure | CY | 29 | $2,444.33 |
| 0415 1 5 | Reinforcing Steel- Bridge Substructure | LB | 29 | $1.56 |
| 0425 2 71 | Manholes, J-7, <10' | EA | 29 | $13,111.90 |
| 0430175218 | Pipe Culvert,Optional Material,Other-Elip/Arch, 18"S/CD | LF | 29 | $186.30 |
| 0104 1 | Artificial Coverings /Rolled Erosion Control Products | SY | 28 | $6.58 |
| 0400 2 10 | Concrete Class II, Approach Slabs | CY | 28 | $963.60 |
| 0415 1 4 | Reinforcing Steel - Bridge Superstructure | LB | 28 | $1.51 |
| 0415 1 9 | Reinforcing Steel- Approach Slabs | LB | 28 | $1.57 |
| 0520 3 | Valley Gutter- Concrete | LF | 28 | $50.59 |
| 0700 3602 | Sign Panel, Remove, 12-20 SF | EA | 28 | $161.90 |
| 0102 71 16 | Temporary Barrier, F&I, Free Standing | LF | 27 | $15.78 |
| 0327 70 2 | Milling Existing Asphalt Pavement, 3 1/2" AVG Depth | SY | 27 | $3.26 |
| 0327 70 7 | Milling Existing Asphalt Pavement, 4" AVG Depth | SY | 27 | $3.29 |
| 0430174118 | Pipe Culvert, Optional Material, Round, 18"SD | LF | 27 | $123.30 |
| 0633 3 14 | Fiber Optic Connection Hardware, F&I, Buffer Tube FAN OUT KIT | EA | 27 | $119.56 |
| 0639 3 60 | Electrical Service Disconnect, Remove- Pole OR Cabinet TO Remain | EA | 27 | $649.58 |
| 0705 10 3 | Object Marker, Type 3 | EA | 27 | $302.51 |
| 0110 7 1 | Mailbox, F&I Single | EA | 26 | $387.04 |
| 0425 2 91 | Manholes, J-8, <10' | EA | 26 | $11,381.18 |
| 0430830 | Pipe Filling AND Plugging- Place OUT OF Service | CY | 26 | $364.11 |
| 0458 1 21 | Bridge Deck Expansion Joint, Rehabilitation, Poured Joint With Backer ROD | LF | 26 | $87.67 |
| 0524 1 2 | Concrete Ditch Pavement, NON Reinforced, 4" | SY | 26 | $84.77 |
| 0536 8122 | Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-002, Approach TL-3 | EA | 26 | $3,461.91 |
| 0633 3 13 | Fiber Optic Connection Hardware, F&I, Preterminated Connector Assembly | EA | 26 | $70.93 |
| 0665 1 12 | Pedestrian Detector, Furnish & Install, Accessible | EA | 26 | $1,867.13 |
| 0695 7600 | Traffic Monitoring Site Cabinet, Remove Existing Cabinet | EA | 26 | $1,044.39 |
| 0700 2115 | Multi-Column Ground Sign Assembly, F&I Ground Mount, 50.1-100.0 SF | EA | 26 | $10,726.64 |
| 0425 1361 | Inlets, Curb, Type P-6, <10' | EA | 25 | $9,992.18 |
| 0458 1 11 | Bridge Deck Expansion Joint, NEW Construction, F&I Poured Joint With Backer ROD | LF | 25 | $78.70 |
| 0520 5 11 | Traffic Separator Concrete-Type I, 4' Wide | LF | 25 | $65.24 |
| 0633 3 51 | Fiber Optic Connection Hardware, Adjust/Modify Splice Enclosure | EA | 25 | $1,006.91 |
| 0649 21 10 | Steel Mast ARM Assembly, Furnish AND Install, Single ARM 60' | EA | 25 | $77,764.09 |
| 0660 1110 | Loop Detector Inductive, F&I, Type 10 | EA | 25 | $590.20 |
| 0676 1500 | Traffic Signal Controller Cabinet, Adjust/Modify | EA | 25 | $2,596.63 |
| 0999 20 1 | Disputes Review Board, Meeting- DO NOT BID | DA | 25 | $4,717.59 |
| 0999 20 2 | Disputes Review Board, Hearing- DO NOT BID | EA | 25 | $6,102.94 |
| 0102913 22 | Removable Tape, White, 10'-30', 3'-9', 6'-10', OR 2'-4' Skip, 6" Wide | GM | 24 | $4,881.64 |
| 0400 7 1 | Bridge Deck Grooving | SY | 24 | $7.59 |
| 0455 20 1 | Pile Inspection, Driven Pile | EA | 24 | $736.94 |
| 0455137 | Load Test (Dynamic), Data Collection AND Analysis | EA | 24 | $1,629.29 |
| 0455137 2 | Load Test (Dynamic), Verification Test | EA | 24 | $1,441.48 |
| 0530 3 3 | Riprap- Rubble, Bank AND Shore | TN | 24 | $181.89 |
| 0546 72 1 | Ground-IN Rumble Strips, 16" | GM | 24 | $2,349.12 |
| 0570 1 3 | Performance Turf, SOD AND Soil- Shoulder Treatment Index 570-010 | SY | 24 | $5.44 |
| 0633 1620 | Fiber Optic Cable, Remove, Underground | LF | 24 | $1.36 |
| 0649 26 3 | Steel Mast ARM Assembly, Remove, Shallow Foundation- Bolt ON Attachment | EA | 24 | $5,932.28 |
| 0660 1109 | Loop Detector Inductive, F&I, Type 9 | EA | 24 | $477.09 |
| 0685 1 11 | Uninterruptible Power Supply, Furnish AND Install, Line Interactive | EA | 24 | $6,578.02 |
| 0700 2116 | Multi-Column Ground Sign Assembly, F&I Ground Mount, 100.1-200.0 SF | EA | 24 | $18,102.34 |
| 0327 70 1 | Milling Existing Asphalt Pavement, 1" AVG Depth | SY | 23 | $2.18 |
| 0327 70 12 | Milling Existing Asphalt Pavement, 1 1/4" AVG Depth | SY | 23 | $3.83 |
| 0327 70 8 | Milling Existing Asphalt Pavement, 2 1/2" AVG Depth | SY | 23 | $2.09 |
| 0521 5 13 | Concrete Traffic Railing- Bridge, 36" Single-Slope | LF | 23 | $138.49 |
| 0521 72 40 | Shoulder Concrete Barrier, 38" OR 44" Height | LF | 23 | $350.56 |
| 0536 8112 | Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-001, Approach TL-3 | EA | 23 | $3,224.76 |
| 0630 2 16 | Conduit, Furnish & Install, Embedded Concrete Barriers AND Traffic Railings | LF | 23 | $14.04 |
| 0635 3 13 | Junction BOX, Furnish & Install, Embedded | EA | 23 | $1,096.34 |
| 0649 21 6 | Steel Mast ARM Assembly, Furnish AND Install, Single ARM 50' | EA | 23 | $70,510.19 |
| 0700 2113 | Multi-Column Ground Sign Assembly, F&I Ground Mount, 20.1-30.0 SF | EA | 23 | $6,599.70 |
| 0700 3206 | Sign Panel, Furnish & Install Overhead Mount, 101-200 SF | EA | 23 | $6,965.18 |
| 0710 11133 | Painted Pavement Marking, Standard,White, 3'-9' Skip Drop Line AND Approach TO Toll Plaza, 12" Wide, | GM | 23 | $1,355.47 |
| 0713107 | Preformed/Permanent Tape, Remove | SF | 23 | $4.33 |
| 0285704 | Optional Base, Base Group 04 | SY | 22 | $20.09 |
| 0334 1 15 | Superpave Asphaltic Conc, Traffic E | TN | 22 | $140.17 |
| 0425 2 63 | Manholes, P-8, Partial | EA | 22 | $7,060.62 |
| 0633 1122 | Fiber Optic Cable, F&I, Underground,13-48 Fibers | LF | 22 | $4.30 |
| 0633 8 11 | Multi-Conductor Communication Cable, Furnish & Install, CAT 6 | LF | 22 | $5.77 |
| 0649 21 15 | Steel Mast ARM Assembly, Furnish AND Install, Single ARM 70' | EA | 22 | $100,157.41 |
| 0700 13 12 | Retroreflective Sign Strip- Furnish AND Install, 2' | EA | 22 | $90.53 |
| 0705 10 2 | Object Marker, Type 2 | EA | 22 | $127.47 |
| 0110 2 2 | Selective Clearing AND Grubbing, Areas With Trees TO Remain | AC | 21 | $14,713.50 |
| 0285702 | Optional Base, Base Group 02 | SY | 21 | $24.60 |
| 0286 1 | Turnout Construction/Driveway Base- Optional Materials | SY | 21 | $33.09 |
| 0633 3 17 | Fiber Optic Connection Hardware, F&I, Connector Panel | EA | 21 | $216.89 |
| 0641 2 80 | Prestressed Concrete Pole, Complete Pole Removal- Pole 30' AND Greater | EA | 21 | $11,463.97 |
| 0695 7162 | Traffic Monitoring Site Cabinet, F&I, Type 3, 2 Pane Back, Pedestal Mount | EA | 21 | $7,798.86 |
| 0700141360 | Enhanced Highway Sign Assembly, AC Powered, F&I Overhead Mount, Blank OUT Sign <12 SF | EA | 21 | $7,033.13 |
| 0711 11103 | Thermoplastic, Standard, White, Solid, 12" FOR Interchange Markings | GM | 21 | $12,769.04 |
| 0711 14570 | Thermoplastic, Preformed, White With Black Contrast, Arrow ON Concrete Surface | EA | 21 | $733.15 |
| 0337 7 88 | Asphalt Concrete Friction Course,Traffic E, FC-12.5, PG 76-22 | TN | 20 | $171.07 |
| 0430175142 | Pipe Culvert, OPT Material, Round, 42"S/CD | LF | 20 | $266.19 |
| 0430982129 | Mitered END Section, Optional Round, 24" CD | EA | 20 | $3,614.46 |
| 0530 1100 | Riprap, Sand-Cement Bags | CY | 20 | $1,203.13 |
| 0660 3 11 | Vehicle Detection System- Microwave, Furnish & Install Cabinet Equipment | EA | 20 | $11,338.74 |
| 0660 3 12 | Vehicle Detection System- Microwave, Furnish & Install, Above Ground Equipment | EA | 20 | $12,720.04 |
| 0999 26 | Local Agency Initial Contingency Amount (DO NOT BID) | LS | 20 | $69,749.05 |
| 0102 75 1 | Temporary Separator, F&I Remove | LF | 19 | $16.29 |
| 0102 78 1 | Temporary Raised/Retroreflective Pavement Marker, Type D | EA | 19 | $5.18 |
| 0327 70 15 | Milling Existing Asphalt Pavement, 2 3/4" AVG Depth | SY | 19 | $2.00 |
| 0425 1311 | Inlets, Curb, Type P-1, <10' | EA | 19 | $9,452.84 |
| 0425 1451 | Inlets, Curb, Type J-5, <10' | EA | 19 | $14,889.30 |
| 0425 1701 | Inlets, Gutter, Type S, <10' | EA | 19 | $7,823.04 |
| 0430175148 | Pipe Culvert, OPT Material, Round, 48"S/CD | LF | 19 | $290.67 |
| 0455115 | Pile Redrive | EA | 19 | $1,804.26 |
| 0633 1420 | Fiber Optic Cable, Relocate, Underground | LF | 19 | $5.17 |
| 0635 2 30 | Pull & Splice BOX, Install | EA | 19 | $1,087.37 |
| 0650 1 19 | Vehicular Traffic Signal, Furnish & Install Aluminum, 5 Section Cluster, 1 WAY | AS | 19 | $2,946.05 |
| 0660 2101 | Loop Assembly- F&I, Type A | AS | 19 | $1,635.50 |
| 0700 3606 | Sign Panel, Remove, 101-200 SF | EA | 19 | $941.51 |
| 0711 14560 | Thermoplastic, Preformed, White With Black Contrast ON Concrete Pavement, Message OR Symbol | EA | 19 | $919.10 |
| 0714 10 | Green-Colored Pavement Markings, Bike Lane | SF | 19 | $9.01 |
| 0337 7 82 | Asphalt Concrete Friction Course,Traffic C, FC-9.5, PG 76-22 | TN | 18 | $165.96 |
| 0400 9 1 | Bridge Deck Planing | SY | 18 | $7.78 |
| 0700 2500 | Multi-Column Ground Sign Assembly, Relocate | EA | 18 | $4,362.14 |
| 0700 3207 | Sign Panel, Furnish & Install Overhead Mount, 201-300 SF | EA | 18 | $10,954.98 |
| 0705 11 2 | Delineator, NON-Flexible | EA | 18 | $88.98 |
| 0711 14660 | Thermoplastic, Preformed, Multi Color Route Shield | EA | 18 | $2,545.19 |
| 0715 7 41 | Load Center, Remove, Secondary Voltage | EA | 18 | $1,036.38 |
| 0400 2 4 | Conc Class II, Bridge Superstructure | CY | 17 | $1,387.01 |
| 0425 2 43 | Manholes, P-7, Partial | EA | 17 | $5,917.65 |
| 0430174218 | Pipe Culvert, Optional Material, Other Shape - Ellip/Arch, 18"SD | LF | 17 | $154.57 |
| 0430984129 | Mitered END Section, Optional Round, 24" SD | EA | 17 | $2,985.89 |
| 0430984625 | Mitered END Sect, Optional - Elliptical / Arch, 18" SD | EA | 17 | $3,323.62 |
| 0524 1 1 | Concrete Ditch Pavt, NON Reinforced, 3" | SY | 17 | $76.61 |
| 0524 2 2 | Concrete Slope Pavement,NON Reinforced, 4" | SY | 17 | $130.31 |
| 0536 8113 | Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-001, Trailing | EA | 17 | $1,546.11 |
| 0633 3 15 | Fiber Optic Connection Hardware, F&I, Preterminated Patch Panel | EA | 17 | $2,829.83 |
| 0639 1610 | Electrical Power Service, Remove Overhead | AS | 17 | $629.48 |
| 0649 21 21 | Steel Mast ARM Assembly, Furnish AND Install, Single ARM 78' | EA | 17 | $114,548.85 |
| 0649 21 3 | Steel Mast ARM Assembly, Furnish AND Install, Single ARM 40' | EA | 17 | $63,014.58 |
| 0700 3202 | Sign Panel, Furnish & Install Overhead Mount, 12-20 SF | EA | 17 | $2,355.55 |
| 0700 3603 | Sign Panel, Remove, 21-30 SF | EA | 17 | $165.73 |
| 0700 5 21 | Internally Illuminated Sign, Furnish & Install Overhead Mount, UP TO 12 SF | EA | 17 | $4,657.15 |
| 0285710 | Optional Base, Base Group 10 | SY | 16 | $23.38 |
| 0327 70 20 | Milling Existing Asphalt Pavement, 3 3/4" AVG Depth | SY | 16 | $3.64 |
| 0350 5 | Cleaning & Sealing Joints- Concrete Pavement | LF | 16 | $4.57 |
| 0632 7 2 | Signal Cable- Repair/Replace/Other, Furnish & Install | LF | 16 | $7.22 |
| 0633 1124 | Fiber Optic Cable, F&I, Underground, 97 - 144 Fibers | LF | 16 | $5.93 |
| 0641 2 70 | Prestressed Concrete Pole, Shallow Pole Removal- Pole 30' AND Greater | EA | 16 | $4,726.84 |
| 0650 1 34 | Vehicular Traffic Signal, Furnish & Install Polycarbonate, 3 Section, 1 WAY | AS | 16 | $1,668.92 |
| 0700 2112 | Multi-Column Ground Sign Assembly, F&I Ground Mount, 12.0-20.0 SF | EA | 16 | $5,899.02 |
| 0700 3102 | Sign Panel, Furnish & Install Ground Mount, 12-20 SF | EA | 16 | $523.72 |
| 0700 5 60 | Internally Illuminated Sign, Remove | EA | 16 | $556.35 |
| 0711 14193 | Thermoplastic, Preformed, 12" White ON Asphalt Pavement, Railroad Dynamic Envelope | LF | 16 | $11.96 |
| 0715500 3 | Pole Cable Distribution System, Wall Mount | EA | 16 | $576.19 |
| 0102 62 13 | Barrier Mounted Work Zone Sign- Index 700-013 | ED | 15 | $0.54 |
| 0285703 | Optional Base, Base Group 03 | SY | 15 | $19.78 |
| 0285715 | Optional Base, Base Group 15 | SY | 15 | $68.22 |
| 0352 70 | Grinding Concrete Pavement | SY | 15 | $5.61 |
| 0400147 | Composite Neoprene Pads | CF | 15 | $1,601.57 |
| 0415 1 1 | Reinforcing Steel- Roadway | LB | 15 | $1.04 |
| 0458 2 | Polymer Nosing FOR Bridge Deck Expansion Joint | CF | 15 | $821.99 |
| 0536 1 0 | Guardrail -Roadway, General/LOW Speed TL-2 | LF | 15 | $20.79 |
| 0536 7 2 | Special Guardrail Post- Special Steel Post FOR Concrete Structure Mount | EA | 15 | $250.49 |
| 0570 1 1 | Performance Turf | SY | 15 | $1.94 |
| 0635 3 12 | Junction BOX, Furnish & Install, Mounted | EA | 15 | $851.16 |
| 0650 1 70 | Vehicular Traffic Signal, Relocate- Includes Removal AND Reinstallation | AS | 15 | $1,110.37 |
| 0676 2122 | ITS Cabinet, Furnish & Install, Pole Mount With Sunshield, 336S, 24" W X 46" H X 22" D | EA | 15 | $9,004.69 |
| 0710 11180 | Painted Pavement Markings, Standard, White, Yield Line | LF | 15 | $8.52 |
| 0102 71 26 | Temporary Barrier, Relocate, Free Standing | LF | 14 | $7.67 |
| 0425 1341 | Inlets, Curb, Type P-4, <10' | EA | 14 | $11,472.23 |
| 0430982138 | Mitered END Section, Optional Round, 36" CD | EA | 14 | $7,034.76 |
| 0455133 2 | Sheet Piling Steel, Temporary-Critical | SF | 14 | $15.82 |
| 0520 5 41 | Traffic Separator Concrete- Type IV, 4' Wide | LF | 14 | $80.33 |
| 0536 7 3 | Special Guardrail Post- Encased Post FOR Shallow Mount | EA | 14 | $137.65 |
| 0550 10220 | Fencing, Type B, 5.1-6.0', Standard | LF | 14 | $22.55 |
| 0634 4153 | Span Wire Assembly, F&I, TWO Point, BOX OR Drop BOX | PI | 14 | $13,431.39 |
| 0639 6121 | Electrical Power Service- Transformer, F&I, 5-10 KVA, Single Phase, Copper Windings | EA | 14 | $3,384.13 |
| 0649 26 5 | Steel Mast ARM Assembly, Remove, Deep Foundation- Bolt ON Attachment | EA | 14 | $17,189.95 |
| 0660 6121 | Vehicle Detection System- AVI, Bluetooth, Furnish & Install, Cabinet Equipment | EA | 14 | $2,745.44 |
| 0660 6122 | Vehicle Detection System- AVI, Bluetooth, Furnish & Install, Above Ground Equipment | EA | 14 | $10,790.25 |
| 0670 5710 | Traffic Controller Assembly, Modify Only - NO Components Added | AS | 14 | $2,877.82 |
| 0676 2143 | ITS Cabinet, Furnish & Install, Base Mount, 334, 24" W X 66" H X 30" D | EA | 14 | $13,378.72 |
| 0711 11421 | Thermoplastic, Standard, Blue, Solid,6" | LF | 14 | $7.59 |
| 0715 61300 | Light Pole Complete, F&I, Standard Pole Standard Foundation, 40' Mounting Height, 0' ARM Length | EA | 14 | $8,528.16 |
| 0102913 23 | Removable Tape, White, 24" Stop BAR | LF | 13 | $9.54 |
| 0102913 24 | Removable Tape, White, 12" Crosswalk | LF | 13 | $5.85 |
| 0400148 | Plain Neoprene Bearing Pads | CF | 13 | $1,441.36 |
| 0425 1910 | Inlets, Closed Flume | EA | 13 | $6,320.74 |
| 0515 1 1 | Pipe Handrail - Guiderail, Steel | LF | 13 | $102.12 |
| 0519 78 | Bollards | EA | 13 | $2,384.54 |
| 0521 8 7 | Concrete Barrier, With Junction Slab, 36" Single Slope | LF | 13 | $471.42 |
| 0633 1123 | Fiber Optic Cable, F&I, Underground,49-96 Fibers | LF | 13 | $5.06 |
| 0639 1123 | Electrical Power Service, F&I, Underground, Meter NOT Required | AS | 13 | $19,437.43 |
| 0663 1122 | Signal Priority AND Preemption System, Furnish AND Install, GPS, Detector | EA | 13 | $9,188.67 |
| 0682 1400 | ITS Cctv Camera, Relocate | EA | 13 | $2,271.59 |
| 0695 7132 | Traffic Monitoring Site Cabinet, Furnish & Install, Type 3, Pedestal Mount | EA | 13 | $7,828.04 |
| 0700 1913 | Single Column Ground Sign Assembly, F&I Cantilever Ground Mount, 20.1-30.0 SF | EA | 13 | $3,809.34 |
| 0700 3604 | Sign Panel, Remove, 31-50 SF | EA | 13 | $173.76 |
| 0711 14191 | Thermoplastic, Preformed, 6" White, Railroad Dynamic Envelope | LF | 13 | $5.91 |
| 0102 30 | Temporary Highway Lighting | EA | 12 | $695.80 |
| 0102913 12 | Removable Tape, Black, 10'-30', 3'-9', 6'-10', OR 2'-4' Skip | GM | 12 | $5,415.23 |
| 0110 23 | Tree Removal | EA | 12 | $303.42 |
| 0400 4 1 | Concrete Class IV, Culverts | CY | 12 | $2,139.81 |
| 0400 4 25 | Concrete Class IV, Mass, Substructure | CY | 12 | $1,712.38 |
| 0411 1 | Epoxy Material FOR Crack Injection- Structures Rehab | GA | 12 | $318.55 |
| 0411 2 | Cracks Inject & Seal- Structures Rehab | LF | 12 | $129.55 |
| 0425 1321 | Inlets, Curb, Type P-2, <10' | EA | 12 | $10,460.61 |
| 0425 1331 | Inlets, Curb, Type P-3, <10' | EA | 12 | $11,474.29 |
| 0425 1355 | Inlets, Curb, Type P-5, Partial | EA | 12 | $8,209.31 |
| 0425 1411 | Inlets, Curb Type J-1, <10' | EA | 12 | $14,684.57 |
| 0425 1543 | Inlets, Ditch Bottom, Type D, J BOT, <10' | EA | 12 | $9,631.88 |
| 0425 1551 | Inlets, DT BOT, Type E, <10' | EA | 12 | $6,472.70 |
| 0425 1561 | Inlets, DT BOT, Type F, <10' | EA | 12 | $8,167.31 |
| 0425 1711 | Inlets, Gutter, Type V, <10' | EA | 12 | $10,017.55 |
| 0425 1921 | Inlets, Adjacent Barrier, <=10' | EA | 12 | $8,613.35 |
| 0425 2 92 | Manholes, J-8, >10' | EA | 12 | $18,945.30 |
| 0430174124 | Pipe Culvert, Optional Material, Round, 24"SD | LF | 12 | $129.99 |
| 0544 3 1 | Crash Cushion, TL-3, Narrow | EA | 12 | $28,067.24 |
| 0639 1121 | Electrical Power Service, F&I, Underground, Meter Furnished BY Power Company | AS | 12 | $9,854.24 |
| 0650 1 36 | Vehicular Traffic Signal, Furnish & Install Polycarbonate, 4 Section, 1 WAY | AS | 12 | $2,263.65 |
| 0663 1123 | Signal Priority AND Preemption System, Furnish AND Install, GPS, Cabinet Electronics | EA | 12 | $9,218.28 |
| 0700 1114 | Single Column Ground Sign Assembly, F&I Ground Mount, 30.1+ SF Sheeting Area FOR Back TO Back Signs | EA | 12 | $2,821.00 |
| 0700 1211 | Single Column Ground Sign Assembly, F&I Barrier TOP-Mount, Less Than 12 SF | EA | 12 | $2,252.90 |
| 0700 1912 | Single Column Ground Sign Assembly, F&I Cantilever Ground Mount, 12.0-20.0 SF | EA | 12 | $3,033.48 |
| 0700 3203 | Sign Panel, Furnish & Install Overhead Mount, 21-30 SF | EA | 12 | $1,656.08 |
| 0710 11103 | Painted Pavement Markings, Standard, White, Solid FOR Interchange Markings, 12" | GM | 12 | $3,531.63 |
| 0711 15133 | Thermoplastic, Standard-Open Graded Asphalt Surfaces, White, Skip, 12"- Approach TO Toll Plaza OR 3-9 Lane Drop | GM | 12 | $5,513.57 |
| 0713103171 | Permanent Tape, White, 3-9 Dotted, 6" Wide, FOR Concrete Surfaces | GM | 12 | $15,707.94 |
| 0715 11125 | Luminaire, F&I, Under Deck, Wall Mount | EA | 12 | $1,556.82 |
| 0715 61342 | Light Pole Complete, F&I, Standard Pole Standard Foundation, 40' Mounting Height, 12' ARM Length | EA | 12 | $8,561.80 |
| 0715 61352 | Light Pole Complete, F&I, Standard Pole Standard Foundation, 40' Mounting Height, 15' ARM Length | EA | 12 | $10,052.67 |
| 0400 4 8 | Conc Class IV, Bulkhead | CY | 11 | $1,706.13 |
| 0425 1365 | Inlets, Curb, Type P-6, Partial | EA | 11 | $9,083.14 |
| 0425 1421 | Inlets, Curb, Type J-2, <10' | EA | 11 | $16,432.14 |
| 0425 1471 | Inlets, Curb, Type 7, <10' | EA | 11 | $10,728.31 |
| 0425 1549 | Inlets, DT BOT, Type D, Modify | EA | 11 | $10,761.84 |
| 0430175154 | Pipe Culvert, OPT Material, Round, 54"S/CD | LF | 11 | $524.21 |
| 0430175224 | Pipe Culvert,Optional Material,Other Shape-Elip/Arch, 24"S/CD | LF | 11 | $202.21 |
| 0430982133 | Mitered END Section, Optional Round, 30" CD | EA | 11 | $5,222.25 |
| 0520 2 2 | Concrete Curb, Type B | LF | 11 | $47.93 |
| 0526 1101 | Pavers, Architectural, Remove Existing AND Reinstall | SY | 11 | $155.36 |
| 0536 1 3 | Guardrail- Roadway, Double Face | LF | 11 | $36.87 |
| 0548 12 | Retaining Wall System, Permanent, Excluding Barrier | SF | 11 | $49.66 |
| 0630 2 15 | Conduit, Furnish & Install, Bridge Mount | LF | 11 | $49.71 |
| 0639 6111 | Electrical Power Service- Transformer, F&I, <5 KVA, Single Phase, Copper Windings | EA | 11 | $2,338.41 |
| 0660 1600 | Loop Detector Inductive, Remove- Cabinet TO Remain | EA | 11 | $80.14 |
| 0685 1 14 | Uninterruptible Power Supply, Furnish AND Install, Online/Double Conversion With Cabinet | EA | 11 | $15,028.34 |
| 0700 1212 | Single Column Ground Sign Assembly, F&I Barrier TOP-Mount, 12.0-20.0 SF | EA | 11 | $2,574.72 |
| 0700 3103 | Sign Panel, Furnish & Install Ground Mount, 21-30 SF | EA | 11 | $917.23 |
| 0700141140 | Enhanced Highway Sign Assembly, AC Powered, F&I Ground Mount, Highlighted Sign <12 SF | EA | 11 | $7,960.01 |
| 0713103102 | Permanent Tape, White, Solid, 8" Exit Lane AT Interchange ON Concrete Pavement | GM | 11 | $48,620.76 |
| 0713103371 | Permanent Tape, Black, 3-9 Dotted, 6" Wide, FOR Concrete Surfaces | GM | 11 | $27,816.00 |
| 0715 1 11 | Lighting Conductors, F&I, Insulated, NO. 10 OR < | LF | 11 | $5.65 |
| 0715 7 21 | Load Center, Rework, Secondary Voltage | EA | 11 | $2,783.81 |
| 1050 16004 | Utility Pipe,Remove & Dispose, 8-19.9" | LF | 11 | $34.63 |
| 0102913 29 | Removable Tape, White, Message, Symbol OR Arrow | EA | 10 | $462.45 |
| 0415 10 5 | Fiber Reinforced Polymer Bars, #5 BAR | LF | 10 | $2.57 |
| 0425 1923 | Inlets, Adjacent Barrier, J Bottom, < 10' | EA | 10 | $13,616.82 |
| 0430518100 | Straight Concrete Endwalls, 18", Single, 0 Degrees, Round | EA | 10 | $3,904.08 |
| 0430524100 | Straight Concrete Endwalls, 24", Single, 0 Degrees, Round | EA | 10 | $5,107.64 |
| 0446 1 1 | Edgedrain Draincrete, Standard | LF | 10 | $31.98 |
| 0459 71 | Piles, Polyethylene Sheeting | SY | 10 | $19.12 |
| 0515 2311 | Pedestrian/ Bicycle Railing, Aluminum Only,42" Type 1 | LF | 10 | $111.04 |
| 0524 1 29 | Concrete Ditch Pavement, 4", Reinforced | SY | 10 | $150.33 |
| 0524 1 4 | Concrete Ditch Pavement, NON Reinforced, 6" | SY | 10 | $145.08 |
| 0526 1 2 | Pavers, Architectural, Sidewalk | SY | 10 | $148.03 |
| 0536 8111 | Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-001, Approach TL-2 | EA | 10 | $3,030.80 |
| 0536 8123 | Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-002, Trailing | EA | 10 | $2,354.50 |
| 0546 71 1 | Raised Rumble Strip SET- Permanent | EA | 10 | $1,442.16 |
| 0571 1 11 | Plastic Erosion MAT, Turf Reinforced MAT, Type 1 | SY | 10 | $10.05 |
| 0639 1112 | Electrical Power Service, F&I, Overhead Meter Purchased BY Contractor From Power Company | AS | 10 | $4,581.21 |
| 0649 21 1 | Steel Mast ARM Assembly, Furnish AND Install, Single ARM 30' | EA | 10 | $57,899.54 |
| 0650 1 18 | Vehicular Traffic Signal, Furnish & Install Aluminum, 5 Section Straight, 1 WAY | AS | 10 | $2,352.96 |
| 0654 3 10 | Midblock Crosswalk: Pedestrian Hybrid Beacon Assembly, Furnish & Install Complete Assembly | AS | 10 | $2,432.45 |
| 0660 7 21 | Vehicle Detection System- Wrong WAY FOR Exit Ramp, 1 OR 2 Lanes, AC Powered | EA | 10 | $46,007.42 |
| 0663 1112 | Signal Priority AND Preemption System, F&I, Optical, Detector | EA | 10 | $3,880.00 |
| 0676 2500 | ITS Cabinet- Adjust/Modify | EA | 10 | $2,953.98 |
| 0684 2 1 | Device Server, Furnish & Install | EA | 10 | $1,423.64 |
| 0685 1 12 | Uninterruptible Power Supply, Furnish AND Install, Online/Double Conversion | EA | 10 | $7,123.70 |
| 0700 1311 | Single Column Ground Sign Assembly, F&I Barrier Side-Mount, Less Than 12 SF | EA | 10 | $2,213.91 |
| 0700 3104 | Sign Panel, Furnish & Install Ground Mount, 31-50 SF | EA | 10 | $1,158.00 |
| 0700 3205 | Sign Panel, Furnish & Install Overhead Mount, 51-100 SF | EA | 10 | $3,854.69 |
| 0700 3605 | Sign Panel, Remove, 51-100 SF | EA | 10 | $366.27 |
| 0700 3607 | Sign Panel, Remove, 201-300 SF | EA | 10 | $1,380.56 |
| 0700 3626 | Sign Panel, Remove, 101-200 SF With Lighting | EA | 10 | $1,180.29 |
| 0713103121 | Permanent Tape, White, Solid W/Contrast, 6" Primary Line Width, FOR Concrete Surfaces | GM | 10 | $44,950.09 |
| 0715 1 15 | Lighting Conductors, F&I, NO.1/0 - 3/0 (0 TO 000) | LF | 10 | $11.52 |
| 0715 61111 | Light Pole Complete, F&I, Standard Pole Standard Foundation, 30' Mounting Height, 8' ARM Length | EA | 10 | $11,070.17 |
| 0715 68000 | Light Pole Complete, Relocate | EA | 10 | $5,571.38 |
| 1050 16003 | Utility Pipe,Remove & Dispose, 5-7.9" | LF | 10 | $44.14 |