Soil Tracking Prevention Device (Item 0104 15): FDOT Unit Price History
65 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA
- Weighted average (12 mo)
- $3,814.24/EA
- Contracts (12 mo)
- 65
- Total quantity (12 mo)
- 227 EA
- Total amount (12 mo)
- $865,833
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 57 | $4,052.90 | 292 | $1,183,447 |
| 2025 | 2025-01-01 – 2025-12-31 | 60 | $4,297.40 | 253 | $1,087,242 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 65 | $3,814.24 | 227 | $865,833 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 6 | $4,273.66 | +12% | 26 |
| 02 | 4 | $2,985.71 | -21.7% | 9 |
| 03 | 4 | $3,501.60 | -8.2% | 9 |
| 04 | 4 | $1,501.10 | -60.6% | 13 |
| 05 | 2 | $5,206.13 | +36.5% | 6 |
| 06 | 3 | $11,680.00 | +206.2% | 5 |
| 07 | 13 | $5,265.35 | +38% | 53 |
| 08 | 16 | $3,340.44 | -12.4% | 49 |
| 09 | 3 | $2,181.82 | -42.8% | 11 |
| 10 | 3 | $5,805.16 | +52.2% | 7 |
| 11 | 1 | $10,020.00 | +162.7% | 5 |
| 12 | 4 | $1,059.26 | -72.2% | 27 |
| 13 | 1 | $100.00 | -97.4% | 6 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0104 15 (Soil Tracking Prevention Device) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 65 contracts with a quantity-weighted average of $3,814.24 per EA, on 227 EA worth $865,833 in total.
The same report run for earlier periods shows $4,052.90 in 2024 (57 contracts, 292 EA), $4,297.40 in 2025 (60 contracts, 253 EA), $3,814.24 in the latest 12 months (65 contracts, 227 EA). From 2024 to the latest 12 months the weighted average fell 5.9%.
Quantity let statewide shrank 22% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
FDOT's market-area reports for the same 12 months show how location moves the price. Among the 10 market areas with at least three contracts, market area 12 had the lowest weighted average ($1,059.26 per EA, 4 contracts) and market area 06 the highest ($11,680.00, 3 contracts), 11.0 times as much. Market area 08 let the most contracts with this item (16). 13 of FDOT's 14 market areas reported the item in this window.
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0104: 0104 18 Inlet Protection System ($170.49 per EA, 204 contracts); 0104 10 3 Sediment Barrier ($2.17 per LF, 197 contracts); 0104 11 Floating Turbidity Barrier ($14.15 per LF, 74 contracts); 0104 12 Staked Turbidity Barrier- Nylon Reinforced PVC ($8.74 per LF, 49 contracts); 0104 1 Artificial Coverings /Rolled Erosion Control Products ($6.58 per SY, 28 contracts).
Related items in section 0104
- 0104 18 · Inlet Protection System ($170.49/EA)
- 0104 10 3 · Sediment Barrier ($2.17/LF)
- 0104 11 · Floating Turbidity Barrier ($14.15/LF)
- 0104 12 · Staked Turbidity Barrier- Nylon Reinforced PVC ($8.74/LF)
- 0104 1 · Artificial Coverings /Rolled Erosion Control Products ($6.58/SY)
- 0104 19 · Chemical Treatment- Powdered, FOR Erosion Control ($46.03/SY)
- 0104 6 · Temporary Slope Drain / Runoff Control Structure ($68.53/LF)
- 0104 7 · Sediment Basin / Containment System ($4,330.00/EA)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.