How We Compute Unit Prices, Win Margins and Money Left on the Table
Published Nov 24, 2026 · Data refreshed Nov 24, 2026
Sources and retrieval
We use only data that agencies publish for the public, through their open-data portals and report pages. We do not scrape BidX, any commercial bid aggregator, plan rooms or login-gated portals.
- TxDOT: the bid tabulation dataset on data.texas.gov (dataset de7b-7dna, 1,048,656 rows covering lettings from Nov 2, 2024 to Nov 19, 2026). Each row is one bidder's price for one pay item on one project, with the engineer's estimate. We read the full history of the 154 most-bid pay items and every proposal's bidder totals through the dataset's public API; the index is rebuilt on each data refresh (date at the top of this page). The site's live search and any item outside the index query the same API directly.
- FDOT: the statewide Historical Item Average Cost reports (Excel) for calendar 2024, calendar 2025 and the 12 months to Oct 31, 2026, as published on fdot.gov. FDOT publishes a quantity-weighted average per item, the number of contracts, and total quantity and amount; it does not publish quartiles in these reports, so FDOT pages show only what FDOT published.
- Caltrans: not yet ingested. Caltrans' weekly Bid Results pages and its contract cost data are linked from the Caltrans hub. We will add Caltrans figures only from its official files, with the same provenance fields.
Every dataset carries its agency, source URL, retrieval time, publication date where the agency states one, and a SHA-256 hash of what we read.
Weighted vs. simple statistics
For each TxDOT pay item we compute, over the last 12 months unless stated otherwise:
- Low bid: the quantity-weighted median of unit prices entered by the apparent low bidder (rank 1) on each proposal.
- Weighted median: the quantity-weighted median of every bid, so a 10,000 LF line counts 100 times as much as a 100 LF line.
- Engineer's estimate: the quantity-weighted median of TxDOT's estimate, taken once per published line.
- Weighted average (by year and band): sum of unit price × quantity divided by total quantity. Median, 25th and 75th percentiles are unweighted, one value per bid.
- 12-month trend: the change in the median bid unit price, last 12 months against the 12 months before. It is unweighted on purpose, because a few large-quantity token bids can move a weighted median by orders of magnitude. We show it only when each window has at least 10 bids.
- Fitted price curve: a least-squares fit of ln(unit price) = a + b·ln(quantity) over the plotted bids. A negative b means unit prices fall as quantity rises. We print R² so you can see how much of the spread quantity explains.
Outliers and unbalanced bids
Bids of $0 or less are dropped. For each item we then apply a fence on the logarithm of unit price: bids below the 25th percentile minus three interquartile ranges, or above the 75th plus three, are left out of the statistics. This removes token bids (a few cents on a line, typical of unbalanced bidding) and obvious keying errors while keeping genuine high and low prices. Each item page states how many bids were excluded; the CSV export always contains every published row.
Quantity bands
High-quantity lines are usually priced lower, and TxDOT warns that this skews averages. Item pages split bids into thirds by quantity (small, medium, large) and report each band separately. Compare your line with the band your quantity falls in.
Winning margin and money left on the table
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal: second-lowest total minus low total. Expressed as a percent, it is divided by the low bid. It is a standard bid-analysis measure of how close a letting was. It describes a published outcome and says nothing about the quality or intent of any bidder.
On contractor profiles, money left on the table is summed over the proposals the contractor won that had at least two bidders, and divided by the total of those winning bids. The winning margin is the same gap for one proposal; we report the median. On item pages, the line-level comparison (“line vs. low bid”) compares each bidder's extension for that single line with the low bidder's; the low bidder is chosen on the proposal total, so it is not always the cheapest on every line.
“Low bid” and “win” mean rank 1 as TxDOT published it. A rank-1 bid can still be rejected or not awarded; the dataset does not record awards, so we do not call these awards.
Checksum verification
Every line is re-extended as Qty × Unit Price, rounded to the cent. In the latest 9,045 rows of the local snapshot, we added up each bidder's extensions on every proposal where the snapshot holds the complete line set, and compared the sum with the bid total TxDOT published: 286 of 286 bidder totals on 64 proposals match within $1. For example, Austin Barricade Company, L.L.C. on proposal 6510-23-001 (27 lines): Σ Qty × Unit Price = $328,899.00 against a published total of $328,899.00. The upload tool applies the same check to your own bid tab.
Contractor names
Contractors appear under the exact name the agency published. We do not merge different legal names, even when they look related; two spellings of one company stay separate until the company or the agency confirms the match. Profiles are built for bidders with at least five TxDOT proposals; they are indexed by search engines only with at least 10 bids, 3 low bids and a bid in the last 12 months. Names that look like an individual trading under their own name are not indexed.
Revisions and rejected bids
We rebuild from the agency's current data on each refresh, so agency corrections flow through. Rows the agency removes disappear here. Engineer's-estimate rows (rank “EE”) are excluded from bids. Where an agency marks a bid as rejected or irregular, it is excluded once that field is available in the feed.
Known limits
- The TxDOT dataset covers about the last 24 months of lettings; older bids are not included.
- Lump-sum (LS) items such as mobilization depend on the size of each job and compare poorly across projects.
- FDOT figures are FDOT's report values; we cannot compute medians or quantity bands for FDOT until bid-level files are ingested.
- Description matching in the upload tool is a word-overlap score; review every match it labels as a description match.
Corrections
Found a wrong number, a merged company or a name change? Email bidtabulation@apps.adeptaoperations.com with the page address. We respond within five business days. We correct errors in matching and computation; we do not remove accurate public bid results.
Changelog
- Nov 24, 2026: first publication. TxDOT bid tabulations (1,048,656 rows), FDOT Historical Item Average Cost reports (2024, 2025, 12 months to Oct 31, 2026).