SP Mixes SP-B PG64-22 (Item 344-7001): TxDOT Unit Price History
537 bids · 85 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure TON
TxDOT 344-7001 · SP MIXES SP-B PG64-22 · Unit: TON
- Low bid
- $117.00/TON
- Quantity-weighted median of winning unit prices
- Weighted median
- $127.00/TON
- Quantity-weighted median of every bid
- Engineer’s estimate
- $115.00/TON
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -12.5%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 344-7001 (SP Mixes SP-B PG64-22) is measured in TON. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 537 bids for it on 85 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 290 bids was $127.00 per TON, and the winning low bidders priced it at a weighted median of $117.00 per TON.
Winning unit prices sat close to TxDOT's own engineer's estimate ($115.00 per TON), within two percent.
By calendar year, the median bid moved from $162.75 in 2025 (242 bids) to $139.70 in 2026 (282 bids), down 14.2%. The middle half of 2026 bids fell between $117.99 and $157.90.
Comparing the last 12 months with the 12 months before, the median unit price fell 12.5%.
Quantity matters for this item. Lines of 21 to 1,532 TON had a weighted median of $175.00, while lines above 14,220 TON had $127.00, a 27% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 85 lines where both a winning and a second-place bid were published, the median winning unit price was $141.73 against $145.00 from the second-lowest bidder, a median gap of 4.35% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 7 TxDOT districts with at least ten bids, Waco had the lowest weighted median ($91.65) and Amarillo the highest ($354.23). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 4, 2026 in Collin County, where Mario Sinacola & Sons Excavating, Inc. was the low bidder at $108.20 per TON for 24,066 TON against an estimate of $105.00.
Related items: 344-7077 Tack Coat (weighted median $4.50 per GAL); 341-7082 Tack Coat (weighted median $4.00 per GAL); 341-7001 D-GR HMA TY-B PG64-22 (weighted median $85.40 per TON); 341-7050 D-GR HMA TY-D SAC-B PG70-22 (weighted median $125.00 per TON).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 13 | 3 | $147.82 | $137.50 | $141.00 | $134.00 | $176.63 |
| 2025 | 242 | 42 | $138.87 | $135.00 | $162.75 | $140.00 | $200.00 |
| 2026 | 282 | 40 | $126.98 | $127.00 | $139.70 | $117.99 | $157.90 |
Quantity bands
| Band | Quantity (TON) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 21–1,532 | 179 | $188.22 | $175.00 | $155.80–$229.00 |
| Medium | 1,607–13,346 | 182 | $141.61 | $140.00 | $130.00–$161.75 |
| Large | 14,220–95,363 | 176 | $128.57 | $127.00 | $110.00–$146.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $141.73
- Median second-low unit price
- $145.00
- Median engineer’s estimate
- $140.00
- Median gap, second vs. low
- +4.35%
85 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District
Line quantity 24,066 TON · Engineer’s estimate $105.00/TON
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Mario Sinacola & Sons Excavating, Inc.LOW BID | $108.20/TON | $2,603,941.20 | — | +3% | $35,766,135 | $890,797 (2.49%) left on table |
| 2 | Ed Bell Construction Company | $115.25/TON | $2,773,606.50 | +$169,665 | +9.8% | $36,656,931 | +$890,797 |
| 3 | Tiseo Paving Company, LLC | $119.00/TON | $2,863,854.00 | +$259,913 | +13.3% | $38,169,956 | +$2,403,821 |
| 4 | Harper Brothers Construction LLC | $110.00/TON | $2,647,260.00 | +$43,319 | +4.8% | $40,441,503 | +$4,675,368 |
1. Mario Sinacola & Sons Excavating, Inc.
LOW BID · WINNER- Unit price
- $108.20/TON
- Extension
- $2,603,941.20
- Proposal total
- $35,766,135
- Money left on the table
- $890,797 (2.49%)
- vs. engineer’s estimate
- +3%
- Unit price
- $115.25/TON
- Extension
- $2,773,606.50
- Proposal total
- $36,656,931
- vs. low bid
- +$890,797
- vs. engineer’s estimate
- +9.8%
3. Tiseo Paving Company, LLC
- Unit price
- $119.00/TON
- Extension
- $2,863,854.00
- Proposal total
- $38,169,956
- vs. low bid
- +$2,403,821
- vs. engineer’s estimate
- +13.3%
4. Harper Brothers Construction LLC
- Unit price
- $110.00/TON
- Extension
- $2,647,260.00
- Proposal total
- $40,441,503
- vs. low bid
- +$4,675,368
- vs. engineer’s estimate
- +4.8%
Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District
Line quantity 30,739 TON · Engineer’s estimate $105.00/TON
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc.LOW BID | $110.00/TON | $3,381,290.00 | — | +4.8% | $138,145,038 | $5,131,824 (3.71%) left on table |
| 2 | Rpm Xconstruction, LLC | $110.00/TON | $3,381,290.00 | $0.000 | +4.8% | $143,276,861 | +$5,131,824 |
| 3 | Mario Sinacola & Sons Excavating, Inc. | $105.12/TON | $3,231,283.68 | -$150,006 | +0.1% | $152,579,077 | +$14,434,039 |
| 4 | Webber, LLC | $95.00/TON | $2,920,205.00 | -$461,085 | -9.5% | $153,499,152 | +$15,354,114 |
| 5 | Sema Construction, Inc. | $118.25/TON | $3,634,886.75 | +$253,597 | +12.6% | $154,136,028 | +$15,990,990 |
| 6 | Zachry Construction Corporation | $98.58/TON | $3,030,250.62 | -$351,039 | -6.1% | $154,873,429 | +$16,728,392 |
- LOW BID · WINNER
- Unit price
- $110.00/TON
- Extension
- $3,381,290.00
- Proposal total
- $138,145,038
- Money left on the table
- $5,131,824 (3.71%)
- vs. engineer’s estimate
- +4.8%
2. Rpm Xconstruction, LLC
- Unit price
- $110.00/TON
- Extension
- $3,381,290.00
- Proposal total
- $143,276,861
- vs. low bid
- +$5,131,824
- vs. engineer’s estimate
- +4.8%
- Unit price
- $105.12/TON
- Extension
- $3,231,283.68
- Proposal total
- $152,579,077
- vs. low bid
- +$14,434,039
- vs. engineer’s estimate
- +0.1%
4. Webber, LLC
- Unit price
- $95.00/TON
- Extension
- $2,920,205.00
- Proposal total
- $153,499,152
- vs. low bid
- +$15,354,114
- vs. engineer’s estimate
- -9.5%
5. Sema Construction, Inc.
- Unit price
- $118.25/TON
- Extension
- $3,634,886.75
- Proposal total
- $154,136,028
- vs. low bid
- +$15,990,990
- vs. engineer’s estimate
- +12.6%
6. Zachry Construction Corporation
- Unit price
- $98.58/TON
- Extension
- $3,030,250.62
- Proposal total
- $154,873,429
- vs. low bid
- +$16,728,392
- vs. engineer’s estimate
- -6.1%
Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District
Line quantity 33,968 TON · Engineer’s estimate $89.00/TON
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Fluor Enterprises, Inc.LOW BID | $94.50/TON | $3,209,976.00 | — | +6.2% | $30,209,876 | $2,977,718 (9.86%) left on table |
| 2 | Big Creek Construction, Ltd. | $100.00/TON | $3,396,800.00 | +$186,824 | +12.4% | $33,187,594 | +$2,977,718 |
| 3 | Knife River Corporation - South | $106.70/TON | $3,624,385.60 | +$414,410 | +19.9% | $33,911,798 | +$3,701,922 |
| 4 | R Construction Civil, LLC | $100.00/TON | $3,396,800.00 | +$186,824 | +12.4% | $34,862,676 | +$4,652,800 |
| 5 | James Construction Group, LLC | $95.40/TON | $3,240,547.20 | +$30,571 | +7.2% | $39,237,828 | +$9,027,952 |
| 6 | Texas Materials Group, Inc. | $116.00/TON | $3,940,288.00 | +$730,312 | +30.3% | $39,562,405 | +$9,352,529 |
| 7 | A. L. Helmcamp, Inc. | $135.00/TON | $4,585,680.00 | +$1,375,704 | +51.7% | $39,630,699 | +$9,420,823 |
| 8 | Posillico Civil, Inc. | $116.00/TON | $3,940,288.00 | +$730,312 | +30.3% | $39,994,995 | +$9,785,119 |
| 9 | Zachry Construction Corporation | $126.56/TON | $4,298,990.08 | +$1,089,014 | +42.2% | $42,444,061 | +$12,234,185 |
| 10 | Brizo Construction, LLC | $104.45/TON | $3,547,957.60 | +$337,982 | +17.4% | $43,708,350 | +$13,498,474 |
| 11 | Granite Construction Company | $113.00/TON | $3,838,384.00 | +$628,408 | +27% | $44,387,970 | +$14,178,094 |
| 12 | Isi Contracting, Inc. | $149.00/TON | $5,061,232.00 | +$1,851,256 | +67.4% | $48,396,973 | +$18,187,097 |
1. Fluor Enterprises, Inc.
LOW BID · WINNER- Unit price
- $94.50/TON
- Extension
- $3,209,976.00
- Proposal total
- $30,209,876
- Money left on the table
- $2,977,718 (9.86%)
- vs. engineer’s estimate
- +6.2%
- Unit price
- $100.00/TON
- Extension
- $3,396,800.00
- Proposal total
- $33,187,594
- vs. low bid
- +$2,977,718
- vs. engineer’s estimate
- +12.4%
- Unit price
- $106.70/TON
- Extension
- $3,624,385.60
- Proposal total
- $33,911,798
- vs. low bid
- +$3,701,922
- vs. engineer’s estimate
- +19.9%
- Unit price
- $100.00/TON
- Extension
- $3,396,800.00
- Proposal total
- $34,862,676
- vs. low bid
- +$4,652,800
- vs. engineer’s estimate
- +12.4%
- Unit price
- $95.40/TON
- Extension
- $3,240,547.20
- Proposal total
- $39,237,828
- vs. low bid
- +$9,027,952
- vs. engineer’s estimate
- +7.2%
- Unit price
- $116.00/TON
- Extension
- $3,940,288.00
- Proposal total
- $39,562,405
- vs. low bid
- +$9,352,529
- vs. engineer’s estimate
- +30.3%
- Unit price
- $135.00/TON
- Extension
- $4,585,680.00
- Proposal total
- $39,630,699
- vs. low bid
- +$9,420,823
- vs. engineer’s estimate
- +51.7%
- Unit price
- $116.00/TON
- Extension
- $3,940,288.00
- Proposal total
- $39,994,995
- vs. low bid
- +$9,785,119
- vs. engineer’s estimate
- +30.3%
9. Zachry Construction Corporation
- Unit price
- $126.56/TON
- Extension
- $4,298,990.08
- Proposal total
- $42,444,061
- vs. low bid
- +$12,234,185
- vs. engineer’s estimate
- +42.2%
10. Brizo Construction, LLC
- Unit price
- $104.45/TON
- Extension
- $3,547,957.60
- Proposal total
- $43,708,350
- vs. low bid
- +$13,498,474
- vs. engineer’s estimate
- +17.4%
- Unit price
- $113.00/TON
- Extension
- $3,838,384.00
- Proposal total
- $44,387,970
- vs. low bid
- +$14,178,094
- vs. engineer’s estimate
- +27%
- Unit price
- $149.00/TON
- Extension
- $5,061,232.00
- Proposal total
- $48,396,973
- vs. low bid
- +$18,187,097
- vs. engineer’s estimate
- +67.4%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0047-04-032 | Collin | Dallas | 24,066 | 4 | Mario Sinacola & Sons Excavating, Inc. | $108.20 | $105.00 |
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 30,739 | 6 | Indus Road & Bridge, Inc. | $110.00 | $105.00 |
| 2026-11-04 | 0212-03-058 | Brazos | Bryan | 33,968 | 12 | Fluor Enterprises, Inc. | $94.50 | $89.00 |
| 2026-11-04 | 0947-03-034 | Jasper | Beaumont | 3,142 | 2 | Texas Materials Group, Inc. | $157.59 | $130.00 |
| 2026-10-06 | 0009-11-248 | Dallas | Dallas | 7,355 | 7 | Ragle Construction, Inc. | $140.00 | $105.00 |
| 2026-10-06 | 0095-03-100 | Kaufman | Dallas | 5,107 | 10 | Highway 19 Construction LLC | $124.00 | $100.00 |
| 2026-09-02 | 0173-04-063 | Kaufman | Dallas | 646 | 7 | Austin Bridge & Road Services, LP | $150.00 | $115.00 |
| 2026-08-06 | 0114-10-102 | Washington | Bryan | 3,775 | 6 | Big Creek Construction, Ltd. | $110.00 | $115.00 |
| 2026-08-06 | 1012-03-027 | Collin | Dallas | 249 | 7 | D. L. Lennon Incorporated - Contractor | $156.00 | $150.00 |
| 2026-08-06 | 2158-01-020 | Gregg | Tyler | 799 | 5 | Longview Bridge and Road, Ltd. | $166.00 | $145.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Amarillo | 11 | $280.00 | $354.23 | $195.00 | — |
| Beaumont | 2 | $157.59 | $156.30 | $130.00 | — |
| Bryan | 80 | $94.50 | $113.00 | $89.00 | -20.53% |
| Dallas | 267 | $110.00 | $109.60 | $105.00 | -10.51% |
| Fort Worth | 29 | $117.00 | $128.00 | $145.00 | — |
| Houston | 6 | $130.00 | $152.50 | $125.00 | — |
| Lufkin | 20 | $148.00 | $150.50 | $150.00 | — |
| Paris | 6 | $130.00 | $127.28 | $110.00 | — |
| Tyler | 104 | $139.40 | $143.00 | $135.00 | -16.38% |
| Waco | 12 | $83.00 | $91.65 | $88.50 | — |
Related items
- 344-7077 · Tack Coat ($4.50/GAL)
- 341-7082 · Tack Coat ($4.00/GAL)
- 341-7001 · D-GR HMA TY-B PG64-22 ($85.40/TON)
- 341-7050 · D-GR HMA TY-D SAC-B PG70-22 ($125.00/TON)
- 400-7010 · CEM Stabil Bkfl ($133.66/CY)
- 401-7001 · Flowable Backfill ($231.39/CY)
- 402-7001 · Trench Excavation Protection ($4.65/LF)
- 403-7001 · Temporary SPL Shoring ($31.39/SF)
Is your price for item 344-7001 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.