Big Creek Construction, Ltd.: TxDOT Bid Results and Margins
Name as published by TxDOT: BIG CREEK CONSTRUCTION, LTD. · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 18, 2026, retrieved Nov 24, 2026.
Proposals bid
182
Low bids (rank 1)
85
Win rate
46.7%
Low-bid value
$362.2M
Money left on table
$27.6M
Avg. bid vs. estimate
-7.66%
From Nov 6, 2024 to Nov 18, 2026, Big Creek Construction, Ltd. submitted 182 bids on TxDOT proposals and was the apparent low bidder on 85 of them (46.7%), with low bids totalling $362,194,706. In 84 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $27,569,393 (7.65% of those bids); the median gap was 5.32%. On average its bids came in 7.66% below TxDOT's engineer's estimate. Its most frequent district was Bryan (55 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.