Knife River Corporation - South: TxDOT Bid Results and Margins

Name as published by TxDOT: KNIFE RIVER CORPORATION - SOUTH · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 18, 2026, retrieved Nov 24, 2026.

Proposals bid
168
Low bids (rank 1)
21
Win rate
12.5%
Low-bid value
$97.3M
Money left on table
$3M
Avg. bid vs. estimate
+4.1%

From Nov 6, 2024 to Nov 18, 2026, Knife River Corporation - South submitted 168 bids on TxDOT proposals and was the apparent low bidder on 21 of them (12.5%), with low bids totalling $97,323,607. In 21 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $3,019,998 (3.1% of those bids); the median gap was 3.45%. On average its bids came in 4.1% above TxDOT's engineer's estimate. Its most frequent district was Bryan (70 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20247114.3%$5,747,469
2025881415.9%$73,658,873
20267368.2%$17,917,265

Head-to-head rivals

BidderProposals togetherRanked ahead
Texas Materials Group, Inc.10758 of 107
Big Creek Construction, Ltd.10528 of 105
A. L. Helmcamp, Inc.3426 of 34
Brazos Paving, Inc.3324 of 33
Larry Young Paving, Inc.278 of 27
Cornerstone Paving and Construction, L.L.C.269 of 26
Stx Civil2410 of 24
Hodges and Son Construction Company, Inc.2313 of 23

Districts and work types

DistrictBids
Bryan70
Waco48
Dallas23
Fort Worth9
Yoakum7
Work type of low bidsLow bids
Material Maintenance Project8
Rehabilitation of Existing Road4
Routine Maintenance Project - Sealed3
Bridge Replacement2
Restoration2
Overlay1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-05-070909-22-206McLennanC & W Southern LLC$578,158$579,658+0.3%
2025-06-116483-77-001FreestoneBig Creek Construction, Ltd.$442,000$443,250+0.3%
2024-11-060752-06-024LimestoneBig Creek Construction, Ltd.$9,559,737$9,595,542+0.4%
2025-07-016479-75-001HillBig Creek Construction, Ltd.$1,959,150$1,967,475+0.4%
2025-07-021598-01-024HoodJay Mills Contracting, Incorporated$14,553,382$14,632,771+0.6%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-186511-07-001LeonMaterial Maintenance Project2 of 3$288,000+1.6%-14%
2026-11-186511-08-001MadisonMaterial Maintenance Project1 of 3$270,750—-12.7%
2026-11-176506-95-001BellMaterial Maintenance Project3 of 3$646,563+38.2%+33.3%
2026-11-176511-05-001BrazosMaterial Maintenance Project1 of 3$378,400—-20.5%
2026-11-176511-06-001FreestoneMaterial Maintenance Project2 of 3$481,500+8.4%-5.6%
2026-11-040212-03-058BrazosBridge Replacement3 of 12$33,911,798+12.3%+6.9%
2026-11-040262-01-034MilamSafety Improvement Projects3 of 7$10,424,591+6.5%-1.2%
2026-11-046510-36-001HillRoutine Maintenance Project3 of 3$1,799,220+12.2%-5.3%
2026-11-030917-30-068BurlesonBridge Replacement3 of 15$735,430+1.9%+3.3%
2026-11-036510-37-001McLennanRoutine Maintenance Project3 of 4$2,340,970+7.7%-5.9%
2026-11-036510-38-001CoryellRoutine Maintenance Project3 of 4$1,358,179+18.5%+12.9%
2026-10-146505-19-001EllisMaterial Maintenance Project5 of 5$134,000+27.6%+41.1%