C & W Southern LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: C & W SOUTHERN LLC · Data as published by TxDOT, lettings May 1, 2025 to Nov 3, 2026, retrieved Nov 24, 2026.

Proposals bid
26
Low bids (rank 1)
8
Win rate
30.77%
Low-bid value
$5M
Money left on table
$263K
Avg. bid vs. estimate
-14.39%

From May 1, 2025 to Nov 3, 2026, C & W Southern LLC submitted 26 bids on TxDOT proposals and was the apparent low bidder on 8 of them (30.77%), with low bids totalling $5,048,453. In 8 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $262,547 (5.2% of those bids); the median gap was 3.53%. On average its bids came in 14.39% below TxDOT's engineer's estimate. Its most frequent district was Tyler (4 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20257342.9%$1,840,209
202619526.3%$3,208,244

Head-to-head rivals

BidderProposals togetherRanked ahead
Garret Shields Infrastructure148 of 14
Hodges and Son Construction Company, Inc.128 of 12
Stx Civil117 of 11
Skyline Bridge LLC96 of 9
Thk Construction LLC97 of 9
Icos Management, LLC87 of 8
E-Z Bel Construction, LLC75 of 7
Blacksmith Ventures LLC63 of 6

Districts and work types

DistrictBids
Tyler4
Wichita Falls4
Paris3
Waco3
Yoakum3
Work type of low bidsLow bids
Bridge Replacement4
Bridge Preventative Maintenance - Sealed1
Culvert & Storm Drainage Work1
Pedestrian, Sidewalks & Curb Ramps1
Safety Improvement Projects1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-02-040901-00-067LamarHighway 19 Construction LLC$727,153$753,594+3.6%
2026-01-060913-29-067LavacaStx Civil$1,153,910$1,217,213+5.5%
2026-05-060901-19-212GraysonHodges and Son Construction Company, Inc.$802,935$858,061+6.9%
2026-06-106499-96-001PolkShalom Services Corporation$464,740$517,705+11.4%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-030917-30-068BurlesonBridge Replacement1 of 15$721,844—+1.3%
2026-10-156508-04-001HopkinsRoutine Maintenance Project - Sealed7 of 11$307,350+21.6%-19.4%
2026-10-136505-28-001AndersonRoutine Maintenance Project - Sealed5 of 7$648,410+28.3%+23.1%
2026-08-206506-40-001HoustonBridge Preventative Maintenance4 of 10$736,320+26.4%-21.5%
2026-07-013089-01-013KaufmanPedestrian, Sidewalks & Curb Ramps1 of 9$598,150—-17.7%
2026-06-106499-96-001PolkBridge Preventative Maintenance - Sealed2 of 7$517,705+11.4%-23.7%
2026-06-030916-26-024GoliadBridge Replacement5 of 10$1,016,647+23.2%-21.3%
2026-06-020916-36-023KarnesBridge Replacement1 of 10$817,325—-26.7%
2026-05-070909-22-206McLennanBridge Replacement1 of 6$578,158—-13.7%
2026-05-060901-19-212GraysonBridge Replacement2 of 10$858,061+6.9%-7.2%
2026-04-080909-40-081LimestoneBridge Replacement3 of 10$1,927,248+6.5%-12.6%
2026-04-070909-38-100FallsBridge Replacement6 of 12$1,273,226+21.6%-8.3%