Thk Construction LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: THK CONSTRUCTION LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 4, 2026, retrieved Nov 24, 2026.

Proposals bid
87
Low bids (rank 1)
22
Win rate
25.29%
Low-bid value
$42.5M
Money left on table
$3.6M
Avg. bid vs. estimate
+3.68%

From Nov 6, 2024 to Nov 4, 2026, Thk Construction LLC submitted 87 bids on TxDOT proposals and was the apparent low bidder on 22 of them (25.29%), with low bids totalling $42,472,746. In 22 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $3,617,804 (8.52% of those bids); the median gap was 6.85%. On average its bids came in 3.68% above TxDOT's engineer's estimate. Its most frequent district was Paris (24 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20246233.3%$4,000,387
202530826.7%$20,409,905
2026511223.5%$18,062,454

Head-to-head rivals

BidderProposals togetherRanked ahead
Garret Shields Infrastructure4326 of 43
Hodges and Son Construction Company, Inc.3826 of 38
Skyline Bridge LLC2717 of 27
East Texas Bridge, Inc.2622 of 26
Highway 19 Construction LLC2518 of 25
Built Right Construction of Oklahoma, LLC2118 of 21
Icos Management, LLC218 of 21
Blacksmith Ventures LLC174 of 17

Districts and work types

DistrictBids
Paris24
Lufkin16
Atlanta12
Tyler10
Wichita Falls7
Work type of low bidsLow bids
Bridge Replacement10
Bridge Maintenance5
Safety Improvement Projects3
Pedestrian, Sidewalks & Curb Ramps2
Bicycle Infrastructure Improvements1
Bridge Preventative Maintenance - Sealed1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-07-010731-01-058PanolaMadden Contracting Company, LLC.$2,441,151$2,452,219+0.5%
2026-11-030917-30-068BurlesonC & W Southern LLC$721,844$728,177+0.9%
2026-08-060901-21-022FranklinHodges and Son Construction Company, Inc.$1,492,466$1,522,873+2%
2026-09-030722-03-016Red RiverLongview Bridge and Road, Ltd.$1,474,741$1,528,980+3.7%
2025-08-070911-39-074ShelbyHodges and Son Construction Company, Inc.$1,630,098$1,695,871+4%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-041017-03-040HuntRestoration2 of 9$7,241,746+6.4%+11.1%
2026-11-046508-43-001DonleyBridge Preventative Maintenance - Sealed12 of 16$1,159,846+65.2%+2.6%
2026-11-030168-09-191RandallBridge Maintenance8 of 8$7,169,258+23.6%+23.3%
2026-11-030917-30-068BurlesonBridge Replacement2 of 15$728,177+0.9%+2.2%
2026-11-036508-47-001ChildressBridge Preventative Maintenance - Sealed9 of 15$1,306,133+64.8%+14.2%
2026-10-136505-28-001AndersonRoutine Maintenance Project - Sealed3 of 7$508,646+0.7%-3.5%
2026-10-070510-06-024FanninOverlay6 of 6$18,167,614+86%+66.3%
2026-10-076493-26-001WiseBridge Preventative Maintenance - Sealed6 of 7$2,929,938+181.6%+107.4%
2026-10-076503-72-001LampasasBridge Preventative Maintenance9 of 9$1,426,606+98.3%+58.1%
2026-10-060911-00-188AngelinaBridge Maintenance3 of 5$3,855,320+17.9%+58.8%
2026-10-066499-74-001ComancheBridge Preventative Maintenance - Sealed10 of 11$1,424,774+95.8%+45.2%
2026-09-030722-03-016Red RiverBridge Replacement2 of 8$1,528,980+3.7%-10.4%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.