East Texas Bridge, Inc.: TxDOT Bid Results and Margins

Name as published by TxDOT: EAST TEXAS BRIDGE, INC. · Data as published by TxDOT, lettings Dec 3, 2024 to Nov 4, 2026, retrieved Nov 24, 2026.

Proposals bid
83
Low bids (rank 1)
9
Win rate
10.84%
Low-bid value
$58M
Money left on table
$3.1M
Avg. bid vs. estimate
+6.93%

From Dec 3, 2024 to Nov 4, 2026, East Texas Bridge, Inc. submitted 83 bids on TxDOT proposals and was the apparent low bidder on 9 of them (10.84%), with low bids totalling $57,957,922. In 9 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $3,107,988 (5.36% of those bids); the median gap was 2.52%. On average its bids came in 6.93% above TxDOT's engineer's estimate. Its most frequent district was Tyler (33 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2024200.0%$0
202539410.3%$22,003,894
202642511.9%$35,954,028

Head-to-head rivals

BidderProposals togetherRanked ahead
Longview Bridge and Road, Ltd.5024 of 50
Highway 19 Construction LLC3414 of 34
Thk Construction LLC264 of 26
Garret Shields Infrastructure164 of 16
Hodges and Son Construction Company, Inc.166 of 16
Skyline Bridge LLC154 of 15
Drake Companies LLC147 of 14
Drewery Construction Company, Incorporated147 of 14

Districts and work types

DistrictBids
Tyler33
Atlanta30
Paris14
Lufkin5
Dallas1
Work type of low bidsLow bids
Routine Maintenance Project - Sealed3
Overlay2
Bridge Replacement1
Freeway Operational Improvements1
Rehabilitation of Existing Road1
Safety Rest Area1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-01-070735-05-023HopkinsA. K. Gillis & Sons, LLC$3,075,740$3,097,971+0.7%
2026-09-020427-01-042Red RiverHighway 19 Construction LLC$1,792,908$1,808,474+0.9%
2025-09-050495-07-081GreggLongview Bridge and Road, Ltd.$36,971,035$37,531,651+1.5%
2025-10-080222-01-063TitusH. V. Caver, Inc.$1,096,365$1,118,158+2%
2026-02-040138-08-033GreggMadden Contracting Company, LLC.$3,172,923$3,282,823+3.5%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-041017-03-040HuntRestoration3 of 9$7,366,754+8.3%+13%
2026-11-030045-09-113LamarOverlay5 of 5$4,321,245+23.1%+17.2%
2026-10-060095-03-100KaufmanBridge Replacement4 of 10$63,244,260+15%-59.4%
2026-10-066501-57-001BowieRoutine Maintenance Project - Sealed1 of 5$5,500,500—-10.3%
2026-10-066501-58-001HarrisonRoutine Maintenance Project - Sealed1 of 4$6,111,500—-0.3%
2026-09-030221-09-039TitusOverlay3 of 4$1,230,555+12.4%+4.2%
2026-09-030722-03-016Red RiverBridge Replacement4 of 8$1,654,439+12.2%-3.1%
2026-09-030901-19-198GraysonBridge Replacement7 of 8$2,633,465+23.6%+5.1%
2026-09-020427-01-042Red RiverBridge Replacement2 of 7$1,808,474+0.9%+1.4%
2026-08-060208-01-026HarrisonOverlay4 of 5$4,052,654+22.1%+22.5%
2026-08-060610-05-060BowieSafety Rest Area1 of 4$10,625,436—-14.3%
2026-08-062158-01-020GreggWiden Non-Freeway2 of 5$18,990,388+5.7%-2.4%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.