Highway 19 Construction LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: HIGHWAY 19 CONSTRUCTION LLC · Data as published by TxDOT, lettings Apr 3, 2025 to Nov 4, 2026, retrieved Nov 24, 2026.

Proposals bid
87
Low bids (rank 1)
18
Win rate
20.69%
Low-bid value
$261.8M
Money left on table
$6.1M
Avg. bid vs. estimate
+0.23%

From Apr 3, 2025 to Nov 4, 2026, Highway 19 Construction LLC submitted 87 bids on TxDOT proposals and was the apparent low bidder on 18 of them (20.69%), with low bids totalling $261,799,706. In 18 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $6,130,993 (2.34% of those bids); the median gap was 2.66%. On average its bids came in 0.23% above TxDOT's engineer's estimate. Its most frequent district was Paris (32 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
202541614.6%$47,637,154
2026461226.1%$214,162,552

Head-to-head rivals

BidderProposals togetherRanked ahead
Garret Shields Infrastructure3916 of 39
East Texas Bridge, Inc.3420 of 34
Grey Sky Construction LLC2825 of 28
Thk Construction LLC257 of 25
Longview Bridge and Road, Ltd.218 of 21
Ed Bell Construction Company1814 of 18
Hodges and Son Construction Company, Inc.1812 of 18
Stx Civil1712 of 17

Districts and work types

DistrictBids
Paris32
Dallas21
Tyler18
Atlanta11
Lufkin2
Work type of low bidsLow bids
Bridge Replacement5
Routine Maintenance Project - Sealed3
Pedestrian, Sidewalks & Curb Ramps2
Widen Non-Freeway2
Bicycle Infrastructure Improvements1
Interchange (New or Reconstructed)1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-10-066501-58-001HarrisonEast Texas Bridge, Inc.$6,111,500$6,179,500+1.1%
2025-05-020173-07-062HuntBaker & Company Construction, LLC$4,125,934$4,172,221+1.1%
2025-10-080136-13-013DeltaGarret Shields Infrastructure$1,673,552$1,706,561+2%
2026-11-030045-09-113LamarDrake Companies LLC$3,510,998$3,640,409+3.7%
2026-09-030221-09-039TitusLongview Bridge and Road, Ltd.$1,095,183$1,137,481+3.9%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-041017-03-040HuntRestoration1 of 9$6,803,596—+4.4%
2026-11-046509-96-001HendersonRoutine Maintenance Project - Sealed1 of 4$1,217,140—+2%
2026-11-030045-09-113LamarOverlay2 of 5$3,640,409+3.7%-1.2%
2026-11-036508-86-001GreggRoutine Maintenance Project - Sealed1 of 4$1,372,080—-2.4%
2026-10-060095-03-100KaufmanBridge Replacement1 of 10$55,012,735—-64.7%
2026-10-060410-02-047GraysonRehabilitation of Existing Road1 of 7$9,878,022—+7.6%
2026-10-066501-57-001BowieRoutine Maintenance Project - Sealed5 of 5$7,362,000+33.8%+20%
2026-10-066501-58-001HarrisonRoutine Maintenance Project - Sealed2 of 4$6,179,500+1.1%+0.8%
2026-09-166504-69-001WoodBridge Preventative Maintenance - Sealed8 of 8$1,303,250+95.2%+34.7%
2026-09-030221-09-039TitusOverlay2 of 4$1,137,481+3.9%-3.7%
2026-09-030722-03-016Red RiverBridge Replacement5 of 8$1,696,242+15%-0.6%
2026-09-030901-19-198GraysonBridge Replacement2 of 8$2,402,200+12.8%-4.1%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.