Ed Bell Construction Company: TxDOT Bid Results and Margins
Name as published by TxDOT: ED BELL CONSTRUCTION COMPANY · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 4, 2026, retrieved Nov 24, 2026.
Proposals bid
96
Low bids (rank 1)
6
Win rate
6.25%
Low-bid value
$50.9M
Money left on table
$1.4M
Avg. bid vs. estimate
+13.69%
From Nov 6, 2024 to Nov 4, 2026, Ed Bell Construction Company submitted 96 bids on TxDOT proposals and was the apparent low bidder on 6 of them (6.25%), with low bids totalling $50,853,097. In 6 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $1,384,109 (2.72% of those bids); the median gap was 2.32%. On average its bids came in 13.69% above TxDOT's engineer's estimate. Its most frequent district was Dallas (58 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.