Mario Sinacola & Sons Excavating, Inc.: TxDOT Bid Results and Margins

Name as published by TxDOT: MARIO SINACOLA & SONS EXCAVATING, INC. · Data as published by TxDOT, lettings Nov 7, 2024 to Nov 4, 2026, retrieved Nov 24, 2026.

Proposals bid
18
Low bids (rank 1)
3
Win rate
16.67%
Low-bid value
$65.9M
Money left on table
$4.6M
Avg. bid vs. estimate
-21.95%

From Nov 7, 2024 to Nov 4, 2026, Mario Sinacola & Sons Excavating, Inc. submitted 18 bids on TxDOT proposals and was the apparent low bidder on 3 of them (16.67%), with low bids totalling $65,878,470. In 3 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $4,606,844 (6.99% of those bids); the median gap was 7.75%. On average its bids came in 21.95% below TxDOT's engineer's estimate. Its most frequent district was Dallas (12 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2024200.0%$0
2025500.0%$0
202611327.3%$65,878,470

Head-to-head rivals

BidderProposals togetherRanked ahead
Webber, LLC165 of 16
Indus Road & Bridge, Inc.104 of 10
Rpm Xconstruction, LLC106 of 10
Zachry Construction Corporation74 of 7
Harper Brothers Construction LLC63 of 6
Ragle Construction, Inc.64 of 6
Sema Construction, Inc.64 of 6
Granite Construction Company51 of 5

Districts and work types

DistrictBids
Dallas12
Paris2
Wichita Falls2
Abilene1
Fort Worth1
Work type of low bidsLow bids
New Location Non-Freeway1
Safety Rest Area1
Widen Non-Freeway1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-03-052588-01-022KaufmanGranite Construction Company$80,359,417$84,051,634+4.6%
2024-12-030047-05-057CollinWebber, LLC$157,359,015$176,408,934+12.1%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-040047-04-032CollinWiden Non-Freeway1 of 4$35,766,135—-10.4%
2026-11-040195-02-092DentonWiden Freeway3 of 6$152,579,077+10.4%+5.7%
2026-10-060009-11-248DallasInterchange (New or Reconstructed)7 of 7$80,575,143+48.2%-88.1%
2026-10-060095-03-100KaufmanBridge Replacement6 of 10$67,191,700+22.1%-56.8%
2026-08-050013-05-046MontagueSafety Rest Area1 of 4$11,180,258—-28%
2026-08-050014-15-034TarrantIntersection & Operational Imprv6 of 11$71,702,834+8.4%-3.6%
2026-05-060081-03-047DentonWiden Non-Freeway4 of 9$123,505,894+10.9%+10.7%
2026-04-070047-03-091GraysonWiden Freeway4 of 6$139,516,918+11.3%-86.7%
2026-03-040261-01-041EllisInterchange (New or Reconstructed)6 of 9$73,360,305+15.2%+15%
2026-02-041015-01-024RockwallWiden Non-Freeway8 of 12$35,321,967+18.5%+2%
2026-02-042921-01-010EllisNew Location Non-Freeway1 of 11$18,932,077—-25.4%
2025-10-090013-05-067MontagueRehabilitation of Existing Road3 of 7$20,723,141+3.1%-4.5%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.