Drake Companies LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: DRAKE COMPANIES LLC · Data as published by TxDOT, lettings Jan 6, 2026 to Nov 3, 2026, retrieved Nov 24, 2026.

Proposals bid
20
Low bids (rank 1)
4
Win rate
20%
Low-bid value
$103M
Money left on table
$3.6M
Avg. bid vs. estimate
+3.58%

From Jan 6, 2026 to Nov 3, 2026, Drake Companies LLC submitted 20 bids on TxDOT proposals and was the apparent low bidder on 4 of them (20%), with low bids totalling $103,047,772. In 4 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $3,637,273 (3.53% of those bids); the median gap was 2.89%. On average its bids came in 3.58% above TxDOT's engineer's estimate. Its most frequent district was Atlanta (7 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
202620420.0%$103,047,772

Head-to-head rivals

BidderProposals togetherRanked ahead
Longview Bridge and Road, Ltd.177 of 17
East Texas Bridge, Inc.147 of 14
Highway 19 Construction LLC96 of 9
Thk Construction LLC62 of 6
A. L. Helmcamp, Inc.53 of 5
Baker & Company Construction, LLC41 of 4
Rk Hall, LLC41 of 4
Cdm Holdings31 of 3

Districts and work types

DistrictBids
Atlanta7
Tyler7
Paris4
Lufkin2
Work type of low bidsLow bids
Bridge Replacement1
Overlay1
Rehabilitation of Existing Road1
Widen Non-Freeway1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-06-032993-01-011LamarSammy Gist Enterprises, Inc.$4,580,818$4,883,905+6.6%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-030045-09-113LamarOverlay1 of 5$3,510,998—-4.7%
2026-10-066501-57-001BowieRoutine Maintenance Project - Sealed3 of 5$6,277,850+14.1%+2.4%
2026-09-030722-03-016Red RiverBridge Replacement3 of 8$1,642,280+11.4%-3.8%
2026-08-060610-05-060BowieSafety Rest Area3 of 4$11,520,690+8.4%-7.1%
2026-08-062158-01-020GreggWiden Non-Freeway4 of 5$20,084,032+11.8%+3.2%
2026-08-050222-03-065MorrisRehabilitation of Existing Road7 of 7$13,998,024+30.1%+19%
2026-07-020138-06-047NacogdochesIntersection & Operational Imprv4 of 6$65,789,279+7%+0.8%
2026-07-020492-04-034SmithWiden Non-Freeway6 of 9$65,286,576+11.2%+1.4%
2026-07-026502-48-001LamarRoutine Maintenance Project - Sealed3 of 3$6,698,449+7%+4.2%
2026-07-010165-02-061SmithWiden Non-Freeway1 of 7$89,285,640—-10.2%
2026-06-032993-01-011LamarSafety Improvement Projects2 of 5$4,883,905+6.6%+5.7%
2026-06-020919-13-020PanolaBridge Replacement3 of 7$2,640,674+12.4%-4.5%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.