Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Skyline Bridge LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: SKYLINE BRIDGE LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Aug 6, 2026, retrieved Nov 24, 2026.

Proposals bid
66
Low bids (rank 1)
10
Win rate
15.15%
Low-bid value
$24.6M
Money left on table
$1.4M
Avg. bid vs. estimate
+1.01%

From Nov 6, 2024 to Aug 6, 2026, Skyline Bridge LLC submitted 66 bids on TxDOT proposals and was the apparent low bidder on 10 of them (15.15%), with low bids totalling $24,623,918. In 10 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $1,380,126 (5.6% of those bids); the median gap was 2.63%. On average its bids came in 1.01% above TxDOT's engineer's estimate. Its most frequent district was Paris (8 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20241218.3%$2,820,729
202525520.0%$11,664,674
202629413.8%$10,138,515

Head-to-head rivals

BidderProposals togetherRanked ahead
Hodges and Son Construction Company, Inc.5030 of 50
Thk Construction LLC2710 of 27
Garret Shields Infrastructure2414 of 24
Stx Civil2313 of 23
Coppell Construction Co., Inc.1715 of 17
Talbert Companies LLC1712 of 17
East Texas Bridge, Inc.1511 of 15
Tucan Contracting, LLC157 of 15

Districts and work types

DistrictBids
Paris8
Atlanta6
Fort Worth6
Lufkin6
Wichita Falls6
Work type of low bidsLow bids
Bridge Replacement9
Safety Improvement Projects1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-10-080903-06-027ClayHodges and Son Construction Company, Inc.$1,149,814$1,155,641+0.5%
2026-04-081790-02-048SmithDrake Companies LLC$1,516,226$1,528,970+0.8%
2025-10-090908-20-029NolanDelgado's Contractors, LLC$918,429$929,935+1.3%
2024-11-060902-40-032JackYoko Excavating, LLC$788,118$805,165+2.2%
2025-09-050574-02-022NavarroIndus Road & Bridge, Inc.$9,649,382$9,894,124+2.5%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-08-060911-28-082HoustonBridge Replacement3 of 6$3,029,411+7.8%+22.4%
2026-08-050901-29-100LamarBridge Replacement5 of 8$990,876+23.7%+21.4%
2026-06-020105-04-047MotleyBridge Replacement1 of 9$3,403,214—+2.2%
2026-06-020919-13-020PanolaBridge Replacement5 of 7$2,722,137+15.9%-1.6%
2026-05-070920-30-090OrangeBridge Replacement1 of 3$1,783,411—+0.2%
2026-05-071271-01-013WilsonBridge Replacement9 of 17$1,190,954+25.5%-1%
2026-05-060077-07-010IrionBridge Replacement2 of 10$4,543,261+3.1%-12.7%
2026-05-060643-05-067GrimesPedestrian, Sidewalks & Curb Ramps7 of 10$2,547,377+39.3%+2.2%
2026-05-060901-19-212GraysonBridge Replacement6 of 10$979,968+22%+6%
2026-05-063591-01-006BowieBicycle Infrastructure Improvements4 of 11$1,118,110+18.6%-3.4%
2026-04-080902-51-029HoodBridge Replacement3 of 8$663,794+4.9%-16.6%
2026-04-080908-23-058FisherBridge Replacement3 of 7$1,915,919+1.9%-23.6%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.