Coppell Construction Co., Inc.: TxDOT Bid Results and Margins
Name as published by TxDOT: COPPELL CONSTRUCTION CO., INC. · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 19, 2026, retrieved Nov 24, 2026.
Proposals bid
45
Low bids (rank 1)
5
Win rate
11.11%
Low-bid value
$21.6M
Money left on table
$1.5M
Avg. bid vs. estimate
+6.86%
From Nov 6, 2024 to Nov 19, 2026, Coppell Construction Co., Inc. submitted 45 bids on TxDOT proposals and was the apparent low bidder on 5 of them (11.11%), with low bids totalling $21,556,134. In 5 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $1,539,298 (7.14% of those bids); the median gap was 8.34%. On average its bids came in 6.86% above TxDOT's engineer's estimate. Its most frequent district was Fort Worth (12 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.