Scott Tucker Construction Company, LLC: TxDOT Bid Results and Margins
Name as published by TxDOT: SCOTT TUCKER CONSTRUCTION COMPANY, LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 19, 2026, retrieved Nov 24, 2026.
Proposals bid
61
Low bids (rank 1)
7
Win rate
11.48%
Low-bid value
$11.3M
Money left on table
$1.5M
Avg. bid vs. estimate
+3.33%
From Nov 6, 2024 to Nov 19, 2026, Scott Tucker Construction Company, LLC submitted 61 bids on TxDOT proposals and was the apparent low bidder on 7 of them (11.48%), with low bids totalling $11,278,964. In 7 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $1,450,110 (12.86% of those bids); the median gap was 10.22%. On average its bids came in 3.33% above TxDOT's engineer's estimate. Its most frequent district was Fort Worth (15 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.