Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Ti-Zack Concrete, LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: TI-ZACK CONCRETE, LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 12, 2026, retrieved Nov 24, 2026.

Proposals bid
115
Low bids (rank 1)
14
Win rate
12.17%
Low-bid value
$42.8M
Money left on table
$1.8M
Avg. bid vs. estimate
+2.07%

From Nov 6, 2024 to Nov 12, 2026, Ti-Zack Concrete, LLC submitted 115 bids on TxDOT proposals and was the apparent low bidder on 14 of them (12.17%), with low bids totalling $42,799,479. In 13 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $1,771,722 (5.4% of those bids); the median gap was 8.09%. On average its bids came in 2.07% above TxDOT's engineer's estimate. Its most frequent district was Amarillo (21 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2024300.0%$0
2025581017.2%$39,344,965
20265447.4%$3,454,514

Head-to-head rivals

BidderProposals togetherRanked ahead
Stx Civil4422 of 44
Garret Shields Infrastructure4214 of 42
Built Right Construction of Oklahoma, LLC2615 of 26
3lw Civil LLC2510 of 25
Icos Management, LLC2515 of 25
Grey Sky Construction LLC2422 of 24
Ragle Construction, Inc.2415 of 24
Blacksmith Ventures LLC195 of 19

Districts and work types

DistrictBids
Amarillo21
Lubbock13
Odessa8
Abilene7
Childress7
Work type of low bidsLow bids
Pedestrian, Sidewalks & Curb Ramps8
Bridge Maintenance3
Bridge Preventative Maintenance - Sealed2
Routine Maintenance Project - Sealed1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2024-12-030919-19-085BowieGarret Shields Infrastructure$1,943,602$1,946,960+0.2%
2026-08-060906-32-067MidlandDelgado's Contractors, LLC$2,075,905$2,097,279+1%
2025-06-040858-02-026MilamGarret Shields Infrastructure$714,789$730,136+2.2%
2026-09-020043-17-036WichitaTight Line Construction, LLC$1,031,370$1,059,895+2.8%
2025-07-020905-00-142LubbockStx Civil$2,978,481$3,063,718+2.9%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-126504-61-001PotterBridge Preventative Maintenance - Sealed1 of 7$734,629—-9.5%
2026-11-126508-80-001PotterBridge Preventative Maintenance - Sealed6 of 14$563,794+83.8%-8.1%
2026-11-106508-49-001WheelerRoutine Maintenance Project - Sealed3 of 5$169,929+44.9%+43%
2026-11-056510-77-001HaleRoutine Maintenance Project - Sealed4 of 4$358,340+126.8%+1.3%
2026-11-056510-78-001HaleRoutine Maintenance Project - Sealed4 of 4$398,429+33.7%+4.5%
2026-11-040285-03-066HaysPedestrian, Sidewalks & Curb Ramps5 of 9$1,135,337+19.5%+20.8%
2026-11-046508-43-001DonleyBridge Preventative Maintenance - Sealed6 of 16$912,899+30.1%-19.2%
2026-11-030168-09-191RandallBridge Maintenance5 of 8$6,578,367+13.4%+13.1%
2026-10-070067-17-039RandallBridge Maintenance3 of 5$4,113,614+5.3%+8.4%
2026-10-070906-00-295EctorTraffic Control Devices3 of 6$1,038,873+15.4%+0.2%
2026-09-226492-74-001TaylorBridge Preventative Maintenance6 of 12$890,710+30%-5%
2026-09-030051-09-127GalvestonPedestrian, Sidewalks & Curb Ramps4 of 7$2,396,674+14.8%+10%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.