Delgado's Contractors, LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: DELGADO'S CONTRACTORS, LLC · Data as published by TxDOT, lettings Dec 3, 2024 to Nov 4, 2026, retrieved Nov 24, 2026.

Proposals bid
39
Low bids (rank 1)
9
Win rate
23.08%
Low-bid value
$14.5M
Money left on table
$568K
Avg. bid vs. estimate
+0.8%

From Dec 3, 2024 to Nov 4, 2026, Delgado's Contractors, LLC submitted 39 bids on TxDOT proposals and was the apparent low bidder on 9 of them (23.08%), with low bids totalling $14,539,910. In 9 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $567,541 (3.9% of those bids); the median gap was 1.32%. On average its bids came in 0.8% above TxDOT's engineer's estimate. Its most frequent district was San Antonio (8 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20242150.0%$1,470,000
202516318.8%$4,168,851
202621523.8%$8,901,059

Head-to-head rivals

BidderProposals togetherRanked ahead
Stx Civil1810 of 18
E-Z Bel Construction, LLC116 of 11
Hodges and Son Construction Company, Inc.118 of 11
Skyline Bridge LLC106 of 10
3lw Civil LLC95 of 9
Icos Management, LLC95 of 9
Bk Field Operations LLC81 of 8
Coppell Construction Co., Inc.86 of 8

Districts and work types

DistrictBids
San Antonio8
Odessa6
Fort Worth5
Abilene4
Brownwood4
Work type of low bidsLow bids
Bridge Replacement6
Bicycle Infrastructure Improvements1
Bridge Maintenance1
Routine Maintenance Project - Sealed1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-06-040906-00-277EctorPathfield Investments LLC$1,271,684$1,288,450+1.3%
2026-04-080908-23-058FisherTucan Contracting, LLC$1,880,830$1,910,911+1.6%
2025-01-070022-01-032TerrellStx Civil$3,731,413$3,801,865+1.9%
2026-09-286508-87-001TarrantTexway Wastewater Services, LLC$198,280$203,570+2.7%
2026-11-040922-33-234WebbStx Civil$2,866,785$2,950,000+2.9%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-040922-33-234WebbBridge Replacement2 of 7$2,950,000+2.9%+15.1%
2026-10-070022-01-034TerrellBridge Replacement2 of 7$8,170,341+20.7%+12.1%
2026-09-286508-87-001TarrantRoutine Maintenance Project - Sealed2 of 2$203,570+2.7%+130.9%
2026-09-020915-11-037KendallBridge Replacement1 of 8$659,000—+25.8%
2026-08-060906-32-067MidlandBicycle Infrastructure Improvements1 of 6$2,075,905—-3.8%
2026-08-050037-02-060ZavalaBridge Replacement8 of 10$18,212,971+32.1%+1.8%
2026-08-050902-38-134ParkerBridge Replacement7 of 10$1,888,841+23.3%+4.5%
2026-06-030916-37-038Jim WellsBridge Replacement3 of 8$911,000+3.8%-0.4%
2026-06-030923-08-042ColemanPedestrian, Sidewalks & Curb Ramps2 of 4$2,365,925+8%-7%
2026-06-020907-00-236Tom GreenPedestrian, Sidewalks & Curb Ramps2 of 7$1,927,500+15.3%-7.3%
2026-06-020916-36-023KarnesBridge Replacement6 of 10$975,500+19.4%-12.5%
2026-05-136497-73-001CollinRoutine Maintenance Project - Sealed3 of 4$475,005+59.3%+51%