Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

3lw Civil LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: 3LW CIVIL LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Sep 3, 2026, retrieved Nov 24, 2026.

Proposals bid
85
Low bids (rank 1)
18
Win rate
21.18%
Low-bid value
$44.3M
Money left on table
$2.8M
Avg. bid vs. estimate
+2.37%

From Nov 6, 2024 to Sep 3, 2026, 3lw Civil LLC submitted 85 bids on TxDOT proposals and was the apparent low bidder on 18 of them (21.18%), with low bids totalling $44,348,190. In 18 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $2,795,920 (6.3% of those bids); the median gap was 4.97%. On average its bids came in 2.37% above TxDOT's engineer's estimate. Its most frequent district was Tyler (10 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20247342.9%$17,540,067
202550816.0%$10,995,704
202628725.0%$15,812,419

Head-to-head rivals

BidderProposals togetherRanked ahead
Stx Civil2815 of 28
Garret Shields Infrastructure2715 of 27
Ti-Zack Concrete, LLC2515 of 25
E-Z Bel Construction, LLC208 of 20
Icos Management, LLC1911 of 19
Grey Sky Construction LLC1613 of 16
Cross Plus Construction, LLC128 of 12
O. Trevino Construction, LLC109 of 10

Districts and work types

DistrictBids
Tyler10
Pharr9
Yoakum9
Corpus Christi7
San Angelo7
Work type of low bidsLow bids
Safety Improvement Projects6
Pedestrian, Sidewalks & Curb Ramps4
Bicycle Infrastructure Improvements2
Routine Maintenance Project - Sealed2
Bridge Replacement1
Intersection & Operational Imprv1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-07-020921-00-091HidalgoCastillo Aranda LLC$1,942,735$1,944,879+0.1%
2025-05-010258-10-050McLennanTi-Zack Concrete, LLC$2,695,684$2,716,165+0.8%
2026-01-062529-02-014CameronMor-Wil, L.L.C.$6,565,146$6,623,433+0.9%
2026-09-020902-00-368ParkerOdum Services, LLC$3,643,031$3,806,232+4.5%
2025-07-020913-09-133WhartonTi-Zack Concrete, LLC$2,973,237$3,111,287+4.6%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-09-030143-10-058VictoriaPedestrian, Sidewalks & Curb Ramps1 of 7$5,349,519—-18.4%
2026-09-020902-00-368ParkerSafety Improvement Projects2 of 11$3,806,232+4.5%-23.5%
2026-08-060910-00-165SmithSafety Improvement Projects7 of 10$799,586+22%-13.7%
2026-08-056505-22-001EastlandRoutine Maintenance Project8 of 9$3,432,054+15.1%+6.7%
2026-07-086493-99-001BellRoutine Maintenance Project - Sealed3 of 4$980,146+53%+59.4%
2026-07-020266-04-053ColoradoSafety Improvement Projects1 of 9$4,778,226—-8.2%
2026-07-020921-00-091HidalgoPedestrian, Sidewalks & Curb Ramps2 of 8$1,944,879+0.1%-19.1%
2026-07-022270-01-029TaylorBicycle Infrastructure Improvements1 of 7$254,408—-20.2%
2026-07-010211-10-053ColoradoPedestrian, Sidewalks & Curb Ramps5 of 10$1,764,754+8.2%+1.4%
2026-06-030923-08-042ColemanPedestrian, Sidewalks & Curb Ramps1 of 4$2,189,861—-13.9%
2026-06-020861-01-071HidalgoSafety Improvement Projects7 of 7$9,743,826+26.9%+13.3%
2026-06-020907-00-236Tom GreenPedestrian, Sidewalks & Curb Ramps5 of 7$1,977,584+18.2%-4.9%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.