Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

E-Z Bel Construction, LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: E-Z BEL CONSTRUCTION, LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 4, 2026, retrieved Nov 24, 2026.

Proposals bid
151
Low bids (rank 1)
27
Win rate
17.88%
Low-bid value
$34.9M
Money left on table
$3.9M
Avg. bid vs. estimate
+3.49%

From Nov 6, 2024 to Nov 4, 2026, E-Z Bel Construction, LLC submitted 151 bids on TxDOT proposals and was the apparent low bidder on 27 of them (17.88%), with low bids totalling $34,915,841. In 27 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $3,853,621 (11.04% of those bids); the median gap was 10.93%. On average its bids came in 3.49% above TxDOT's engineer's estimate. Its most frequent district was Yoakum (43 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2024500.0%$0
2025681420.6%$22,571,213
2026781316.7%$12,344,628

Head-to-head rivals

BidderProposals togetherRanked ahead
Stx Civil5924 of 59
The Levy Company, LLC3517 of 35
Elecnor Belco Electric, Inc.3423 of 34
Hunter Industries, Ltd.3412 of 34
Florida Traffic Control Devices, Inc.3225 of 32
Vaca Underground Utilities Inc2510 of 25
Acme Bridge Company, Inc.2412 of 24
Texas Steel Industrial Placing, LLC2411 of 24

Districts and work types

DistrictBids
Yoakum43
San Antonio34
Austin29
Waco16
Corpus Christi11
Work type of low bidsLow bids
Safety Improvement Projects13
Traffic Control Devices5
Routine Maintenance Project - Sealed4
Bridge Replacement3
Intersection & Operational Imprv1
Pedestrian, Sidewalks & Curb Ramps1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-12-030716-03-012ColoradoHunter Industries, Ltd.$1,598,214$1,607,974+0.6%
2025-11-060913-27-092VictoriaPresidio Contracting, LLC$2,877,575$2,898,669+0.7%
2025-08-070445-02-072LavacaHunter Industries, Ltd.$6,702,218$6,798,528+1.4%
2025-07-022270-01-027TaylorWillis Electric Co., LP$797,375$810,023+1.6%
2025-01-070914-00-480TravisElecnor Belco Electric, Inc.$1,886,974$1,920,000+1.8%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-040285-03-066HaysPedestrian, Sidewalks & Curb Ramps8 of 9$1,272,000+33.8%+35.4%
2026-11-040922-33-234WebbBridge Replacement5 of 7$3,270,969+14.1%+27.6%
2026-11-030917-30-068BurlesonBridge Replacement4 of 15$749,950+3.9%+5.3%
2026-11-033330-01-011McLennanIntersection & Operational Imprv5 of 9$359,709+23.4%+18.1%
2026-10-070143-03-049WilsonWiden Non-Freeway5 of 8$48,723,770+22.2%-3.4%
2026-10-070922-20-030La SalleBridge Replacement6 of 6$653,352+34.7%-2.3%
2026-09-096498-20-001TravisRoutine Maintenance Project - Sealed4 of 4$1,515,230+126.7%+66.7%
2026-09-096499-28-001WilliamsonRoutine Maintenance Project - Sealed5 of 5$1,589,920+140.8%+64.7%
2026-09-031479-01-028BexarSafety Improvement Projects5 of 6$3,977,546+15.5%-2%
2026-09-020913-09-134WhartonBridge Replacement4 of 12$2,914,243+8.9%+24.4%
2026-09-020915-11-037KendallBridge Replacement4 of 8$765,423+16.1%+46.1%
2026-08-060025-02-234BexarCorridor Traffic Management3 of 7$8,661,967+9.6%-16.8%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.