E-Z Bel Construction, LLC: TxDOT Bid Results and Margins
Name as published by TxDOT: E-Z BEL CONSTRUCTION, LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 4, 2026, retrieved Nov 24, 2026.
Proposals bid
151
Low bids (rank 1)
27
Win rate
17.88%
Low-bid value
$34.9M
Money left on table
$3.9M
Avg. bid vs. estimate
+3.49%
From Nov 6, 2024 to Nov 4, 2026, E-Z Bel Construction, LLC submitted 151 bids on TxDOT proposals and was the apparent low bidder on 27 of them (17.88%), with low bids totalling $34,915,841. In 27 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $3,853,621 (11.04% of those bids); the median gap was 10.93%. On average its bids came in 3.49% above TxDOT's engineer's estimate. Its most frequent district was Yoakum (43 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.