Tucan Contracting, LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: TUCAN CONTRACTING, LLC · Data as published by TxDOT, lettings Feb 4, 2026 to Oct 7, 2026, retrieved Nov 24, 2026.

Proposals bid
35
Low bids (rank 1)
5
Win rate
14.29%
Low-bid value
$9.3M
Money left on table
$298K
Avg. bid vs. estimate
-2.05%

From Feb 4, 2026 to Oct 7, 2026, Tucan Contracting, LLC submitted 35 bids on TxDOT proposals and was the apparent low bidder on 5 of them (14.29%), with low bids totalling $9,338,443. In 5 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $297,584 (3.19% of those bids); the median gap was 2.44%. On average its bids came in 2.05% below TxDOT's engineer's estimate. Its most frequent district was Dallas (7 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
202635514.3%$9,338,443

Head-to-head rivals

BidderProposals togetherRanked ahead
Hodges and Son Construction Company, Inc.2314 of 23
Garret Shields Infrastructure206 of 20
Skyline Bridge LLC158 of 15
Ed Bell Construction Company118 of 11
Texas Steel Industrial Placing, LLC116 of 11
Coppell Construction Co., Inc.107 of 10
Knife River Corporation - South95 of 9
Thk Construction LLC94 of 9

Districts and work types

DistrictBids
Dallas7
Fort Worth6
Paris4
Waco4
Wichita Falls3
Work type of low bidsLow bids
Bridge Replacement5

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-02-050902-49-074ErathDelgado's Contractors, LLC$625,625$633,890+1.3%
2026-05-070918-47-527DallasGarret Shields Infrastructure$2,678,695$2,725,664+1.8%
2026-03-051097-01-018HuntHodges and Son Construction Company, Inc.$2,085,509$2,125,564+1.9%
2026-04-080902-51-029HoodGarret Shields Infrastructure$632,977$658,219+4%
2026-06-020105-04-047MotleySkyline Bridge LLC$3,403,214$3,678,460+8.1%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-10-070092-03-064EllisSafety Improvement Projects7 of 8$5,183,617+37.8%+14.3%
2026-10-070196-03-288DallasPedestrian, Sidewalks & Curb Ramps8 of 9$1,411,848+19.9%+10.9%
2026-09-030844-04-011CollingsworthBridge Replacement4 of 7$3,835,569+27.1%+16.7%
2026-09-030901-19-198GraysonBridge Replacement8 of 8$3,471,852+63%+38.6%
2026-09-020043-17-036WichitaPedestrian, Sidewalks & Curb Ramps3 of 7$1,139,850+10.5%-4.1%
2026-09-020903-28-073MontagueBridge Replacement4 of 6$3,510,334+25.2%+14.7%
2026-08-050095-04-079KaufmanBridge Maintenance6 of 10$1,152,052+44.1%-10.7%
2026-08-050902-38-134ParkerBridge Replacement9 of 10$2,073,462+35.4%+14.7%
2026-07-010909-40-079LimestoneBridge Replacement1 of 8$2,080,558—-8.9%
2026-07-013089-01-013KaufmanPedestrian, Sidewalks & Curb Ramps3 of 9$685,106+14.5%-5.7%
2026-06-030918-46-334DentonBridge Replacement1 of 5$2,342,967—-6.5%
2026-06-020105-04-047MotleyBridge Replacement2 of 9$3,678,460+8.1%+10.4%