Bk Field Operations LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: BK FIELD OPERATIONS LLC · Data as published by TxDOT, lettings Nov 12, 2024 to Jun 29, 2026, retrieved Nov 24, 2026.

Proposals bid
159
Low bids (rank 1)
56
Win rate
35.22%
Low-bid value
$25.3M
Money left on table
$4.9M
Avg. bid vs. estimate
-16.76%

From Nov 12, 2024 to Jun 29, 2026, Bk Field Operations LLC submitted 159 bids on TxDOT proposals and was the apparent low bidder on 56 of them (35.22%), with low bids totalling $25,262,326. In 56 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $4,876,200 (19.3% of those bids); the median gap was 13.3%. On average its bids came in 16.76% below TxDOT's engineer's estimate. Its most frequent district was San Antonio (27 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20247114.3%$174,951
20251094137.6%$15,939,532
2026431432.6%$9,147,844

Head-to-head rivals

BidderProposals togetherRanked ahead
Garret Shields Infrastructure5037 of 50
Rhino Equity, LLC4631 of 46
Structural Integrity Group LLC3835 of 38
Icos Management, LLC3732 of 37
Roy Jorgensen Associates, Inc.3426 of 34
Beck-Reit & Sons, Ltd.3125 of 31
Premier Contractors LLC3124 of 31
Blacksmith Ventures LLC2921 of 29

Districts and work types

DistrictBids
San Antonio27
Dallas26
Austin15
Bryan11
Houston10
Work type of low bidsLow bids
Bridge Preventative Maintenance - Sealed22
Routine Maintenance Project - Sealed21
Bridge Maintenance5
Routine Maintenance Project5
Bridge Preventative Maintenance3

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-04-156471-90-001Fort BendBk Field Operations LLC$732,257$481,002-34.3%
2025-06-186479-79-001BellPathfield Investments LLC$897,734$899,095+0.2%
2026-02-196492-30-001HuntCatocon, Inc.$607,439$608,821+0.2%
2026-02-116491-76-001EllisGarret Shields Infrastructure$312,935$315,342+0.8%
2025-05-012398-01-057TaylorTi-Zack Concrete, LLC$1,338,127$1,350,387+0.9%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-06-296498-61-001PolkRoutine Maintenance Project - Sealed1 of 6$156,885—-65.6%
2026-05-136481-94-001KentRoutine Maintenance Project - Sealed4 of 7$712,725+24.5%-17.9%
2026-05-136496-05-001DentonBridge Preventative Maintenance - Sealed3 of 9$273,158+14.6%-10.8%
2026-05-136497-28-001NavarroRoutine Maintenance Project - Sealed2 of 3$75,780+6.8%-3.5%
2026-03-186481-15-001AtascosaBridge Preventative Maintenance - Sealed3 of 7$96,226+33.3%-6.9%
2026-03-186493-68-001PotterRoutine Maintenance Project - Sealed2 of 2$364,356+33.8%+23.7%
2026-03-186493-96-001GuadalupeBridge Preventative Maintenance - Sealed1 of 7$48,346—-1.1%
2026-03-186496-95-001HarrisonRoutine Maintenance Project1 of 3$597,215—+3.9%
2026-03-116489-36-001CollinBridge Preventative Maintenance - Sealed1 of 6$43,579—-5.9%
2026-03-116495-44-001EllisBridge Preventative Maintenance - Sealed2 of 12$376,090+1.8%-27.8%
2026-03-050914-00-509TravisBridge Maintenance5 of 14$1,872,338+16.5%-0.3%
2026-03-050914-00-574TravisBridge Maintenance2 of 13$343,231+4.8%-33.8%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.