Structural Integrity Group LLC: TxDOT Bid Results and Margins
Name as published by TxDOT: STRUCTURAL INTEGRITY GROUP LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 12, 2026, retrieved Nov 24, 2026.
Proposals bid
189
Low bids (rank 1)
21
Win rate
11.11%
Low-bid value
$19.4M
Money left on table
$1.8M
Avg. bid vs. estimate
+7.94%
From Nov 6, 2024 to Nov 12, 2026, Structural Integrity Group LLC submitted 189 bids on TxDOT proposals and was the apparent low bidder on 21 of them (11.11%), with low bids totalling $19,416,795. In 21 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $1,769,629 (9.11% of those bids); the median gap was 11.11%. On average its bids came in 7.94% above TxDOT's engineer's estimate. Its most frequent district was Houston (29 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.