Tight Line Construction, LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: TIGHT LINE CONSTRUCTION, LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 4, 2026, retrieved Nov 24, 2026.

Proposals bid
46
Low bids (rank 1)
11
Win rate
23.91%
Low-bid value
$7.1M
Money left on table
$664K
Avg. bid vs. estimate
+1.8%

From Nov 6, 2024 to Nov 4, 2026, Tight Line Construction, LLC submitted 46 bids on TxDOT proposals and was the apparent low bidder on 11 of them (23.91%), with low bids totalling $7,113,009. In 11 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $664,341 (9.34% of those bids); the median gap was 5.15%. On average its bids came in 1.8% above TxDOT's engineer's estimate. Its most frequent district was Tyler (11 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20244250.0%$1,181,059
202517423.5%$2,375,692
202625520.0%$3,556,258

Head-to-head rivals

BidderProposals togetherRanked ahead
Central North Construction, LLC2114 of 21
Apex Landscape & Irrigation, LLC178 of 17
Texas Road Construction, LLC1610 of 16
Abescape Landscaping, LLC119 of 11
Garret Shields Infrastructure103 of 10
Green Sage Services LLC108 of 10
Rare Earth Landscape Solutions LLC109 of 10
Ti-Zack Concrete, LLC82 of 8

Districts and work types

DistrictBids
Tyler11
Austin7
Fort Worth5
Atlanta2
Beaumont2
Work type of low bidsLow bids
Landscape & Scenic Enhancement8
Pedestrian, Sidewalks & Curb Ramps2
Safety Improvement Projects1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-06-030920-00-178JeffersonApex Landscape & Irrigation, LLC$1,233,654$1,239,258+0.5%
2024-11-060165-01-109Smith3lw Civil LLC$1,734,105$1,801,414+3.9%
2026-06-020914-05-264WilliamsonGreen Sage Services LLC$1,517,875$1,618,773+6.7%
2026-07-020008-03-144ParkerCentral North Construction, LLC$291,494$326,471+12%
2025-09-050910-42-044RuskGv Landscape and Construction LLC$119,461$136,485+14.3%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-040285-03-066HaysPedestrian, Sidewalks & Curb Ramps9 of 9$1,700,314+78.9%+81%
2026-09-030143-10-058VictoriaPedestrian, Sidewalks & Curb Ramps7 of 7$6,881,478+28.6%+5%
2026-09-030902-39-050Palo PintoTexas Park and Wildlife4 of 7$561,660+36.3%+9%
2026-09-020043-17-036WichitaPedestrian, Sidewalks & Curb Ramps1 of 7$1,031,370—-13.2%
2026-09-020331-04-074CameronLandscape & Scenic Enhancement1 of 5$93,070—+3.5%
2026-08-060911-00-161AngelinaLandscape & Scenic Enhancement3 of 5$512,059+13.1%-23.1%
2026-08-060914-18-130BastropLandscape & Scenic Enhancement2 of 8$288,954+29%-18.8%
2026-08-050047-03-106GraysonPedestrian, Sidewalks & Curb Ramps10 of 10$1,665,425+67.7%+40.5%
2026-08-050327-08-109CameronLandscape & Scenic Enhancement3 of 6$272,291+13%+21.5%
2026-08-050919-00-098CassLandscape & Scenic Enhancement2 of 4$138,920+16.7%-15.3%
2026-07-020008-03-144ParkerLandscape & Scenic Enhancement2 of 7$326,471+12%-13.2%
2026-07-020718-02-079TarrantLandscape & Scenic Enhancement5 of 7$269,004+69.2%-15.4%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.