Abescape Landscaping, LLC: TxDOT Bid Results and Margins
Name as published by TxDOT: ABESCAPE LANDSCAPING, LLC · Data as published by TxDOT, lettings Jun 5, 2025 to Nov 19, 2026, retrieved Nov 24, 2026.
Proposals bid
52
Low bids (rank 1)
4
Win rate
7.69%
Low-bid value
$2.1M
Money left on table
$155K
Avg. bid vs. estimate
+24.53%
From Jun 5, 2025 to Nov 19, 2026, Abescape Landscaping, LLC submitted 52 bids on TxDOT proposals and was the apparent low bidder on 4 of them (7.69%), with low bids totalling $2,082,276. In 4 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $155,400 (7.46% of those bids); the median gap was 10.89%. On average its bids came in 24.53% above TxDOT's engineer's estimate. Its most frequent district was San Angelo (10 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.