Larry Young Paving, Inc.: TxDOT Bid Results and Margins
Name as published by TxDOT: LARRY YOUNG PAVING, INC. · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 4, 2026, retrieved Nov 24, 2026.
Proposals bid
46
Low bids (rank 1)
12
Win rate
26.09%
Low-bid value
$43.5M
Money left on table
$1.8M
Avg. bid vs. estimate
+1.8%
From Nov 6, 2024 to Nov 4, 2026, Larry Young Paving, Inc. submitted 46 bids on TxDOT proposals and was the apparent low bidder on 12 of them (26.09%), with low bids totalling $43,489,939. In 12 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $1,822,979 (4.19% of those bids); the median gap was 3.02%. On average its bids came in 1.8% above TxDOT's engineer's estimate. Its most frequent district was Bryan (33 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.