Larry Young Paving, Inc.: TxDOT Bid Results and Margins

Name as published by TxDOT: LARRY YOUNG PAVING, INC. · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 4, 2026, retrieved Nov 24, 2026.

Proposals bid
46
Low bids (rank 1)
12
Win rate
26.09%
Low-bid value
$43.5M
Money left on table
$1.8M
Avg. bid vs. estimate
+1.8%

From Nov 6, 2024 to Nov 4, 2026, Larry Young Paving, Inc. submitted 46 bids on TxDOT proposals and was the apparent low bidder on 12 of them (26.09%), with low bids totalling $43,489,939. In 12 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $1,822,979 (4.19% of those bids); the median gap was 3.02%. On average its bids came in 1.8% above TxDOT's engineer's estimate. Its most frequent district was Bryan (33 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20242150.0%$18,997,916
202527829.6%$22,462,556
202617317.6%$2,029,467

Head-to-head rivals

BidderProposals togetherRanked ahead
Knife River Corporation - South2719 of 27
Big Creek Construction, Ltd.2010 of 20
Texas Materials Group, Inc.2016 of 20
Brazos Paving, Inc.1715 of 17
Cornerstone Paving and Construction, L.L.C.115 of 11
A. L. Helmcamp, Inc.98 of 9
Garret Shields Infrastructure93 of 9
Stx Civil88 of 8

Districts and work types

DistrictBids
Bryan33
Houston8
Yoakum3
Austin2
Work type of low bidsLow bids
Safety Improvement Projects4
Bridge Replacement3
Pedestrian, Sidewalks & Curb Ramps2
Traffic Control Devices2
Intersection & Operational Imprv1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-09-040639-02-026MadisonKnife River Corporation - South$18,290,693$18,459,645+0.9%
2026-11-040262-01-034MilamBig Creek Construction, Ltd.$9,787,627$10,182,780+4%
2025-02-070111-08-127BrazoriaTraf-Tex, Inc.$354,848$370,729+4.5%
2026-05-070110-01-052WalkerBig Creek Construction, Ltd.$2,980,129$3,123,380+4.8%
2025-05-020114-09-099WashingtonCornerstone Paving and Construction, L.L.C.$965,907$1,020,481+5.7%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-040262-01-034MilamSafety Improvement Projects2 of 7$10,182,780+4%-3.4%
2026-10-060590-05-057MilamPedestrian, Sidewalks & Curb Ramps6 of 10$377,702+46.7%+60.2%
2026-08-060051-09-128GalvestonSafety Improvement Projects7 of 14$3,030,198+44.4%+4.6%
2026-08-060114-10-102WashingtonRehabilitation of Existing Road5 of 6$5,034,763+17.4%+19.5%
2026-08-050186-03-071BurlesonIntersection & Operational Imprv4 of 6$5,538,882+11%+4.1%
2026-08-050204-06-069MilamTraffic Control Devices1 of 4$366,495—-7.2%
2026-08-050917-16-040LeonBridge Replacement6 of 8$2,797,371+8.7%+34.6%
2026-07-010540-03-039BrazosSafety Improvement Projects3 of 8$4,285,538+13.6%-0.7%
2026-06-020315-03-070GrimesSafety Improvement Projects1 of 7$1,241,183—-2.6%
2026-05-070110-01-052WalkerSafety Improvement Projects2 of 5$3,123,380+4.8%+18.8%
2026-05-060643-05-067GrimesPedestrian, Sidewalks & Curb Ramps2 of 10$2,041,635+11.6%-18.1%
2026-04-080114-10-108WashingtonOverlay6 of 7$7,656,043+17.1%+25%