Trench Excavation Protection (Item 402-7001): TxDOT Unit Price History

1,681 bids · 274 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure LF

TxDOT 402-7001 · TRENCH EXCAVATION PROTECTION · Unit: LF

Low bid
$3.26/LF
Quantity-weighted median of winning unit prices
Weighted median
$4.65/LF
Quantity-weighted median of every bid
Engineer’s estimate
$10.00/LF
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
0%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$25.00$50.00$75.00$100.00$125.001101001K10K100KQuantity (LF), log scaleUnit price ($/LF)
Winning (low) bid Other bid Fitted price curve (ln price = 3.72 − 0.260·ln qty, R² 0.14)320 plotted bids, 5 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 402-7001 (Trench Excavation Protection) is measured in LF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,681 bids for it on 274 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 895 bids was $4.65 per LF, and the winning low bidders priced it at a weighted median of $3.26 per LF.

TxDOT's engineer's estimate for the same lines had a weighted median of $10.00 per LF, so winning bids came in 67.4% below the estimate.

By calendar year, the median bid moved from $10.00 in 2025 (788 bids) to $10.00 in 2026 (823 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $3.58 and $20.00.

Comparing the last 12 months with the 12 months before, the median unit price did not change.

Quantity matters for this item. Lines of 6 to 150 LF had a weighted median of $15.00, while lines above 1,092 LF had $3.75, a 75% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 271 lines where both a winning and a second-place bid were published, the median winning unit price was $10.00 against $10.00 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 24 TxDOT districts with at least ten bids, Pharr had the lowest weighted median ($2.00) and Brownwood the highest ($66.13). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 4, 2026 in Collin County, where Mario Sinacola & Sons Excavating, Inc. was the low bidder at $1.00 per LF for 19,740 LF against an estimate of $7.50.

9 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 401-7001 Flowable Backfill (weighted median $231.39 per CY); 403-7001 Temporary SPL Shoring (weighted median $31.39 per SF); 400-7010 CEM Stabil Bkfl (weighted median $133.66 per CY); 416-7006 Drill Shaft (36 IN) (weighted median $270.00 per LF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
20247011$8.62$5.00$10.57$5.69$30.00
2025788134$6.25$3.27$10.00$5.00$22.88
2026823129$7.08$4.65$10.00$3.58$20.00

Quantity bands

BandQuantity (LF)BidsWeighted avgWeighted median25th–75th pct
Small6–150562$40.87$15.00$10.00–$50.00
Medium161–1,050572$15.98$10.00$5.00–$20.00
Large1,092–69,959.41547$6.18$3.75$2.34–$10.00

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$10.00
Median second-low unit price
$10.00
Median engineer’s estimate
$13.00
Median gap, second vs. low
+0%

271 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District

Line quantity 19,740 LF · Engineer’s estimate $7.50/LF

  • Unit price
    $1.00/LF
    Extension
    $19,740.00
    Proposal total
    $35,766,135
    Money left on the table
    $890,797 (2.49%)
    vs. engineer’s estimate
    -86.7%
  • Unit price
    $3.15/LF
    Extension
    $62,181.00
    Proposal total
    $36,656,931
    vs. low bid
    +$890,797
    vs. engineer’s estimate
    -58%
  • 3. Tiseo Paving Company, LLC

    Unit price
    $1.10/LF
    Extension
    $21,714.00
    Proposal total
    $38,169,956
    vs. low bid
    +$2,403,821
    vs. engineer’s estimate
    -85.3%
  • 4. Harper Brothers Construction LLC

    Unit price
    $1.00/LF
    Extension
    $19,740.00
    Proposal total
    $40,441,503
    vs. low bid
    +$4,675,368
    vs. engineer’s estimate
    -86.7%

Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District

Line quantity 41,827 LF · Engineer’s estimate $10.00/LF

  • 1. Indus Road & Bridge, Inc.

    LOW BID · WINNER
    Unit price
    $7.00/LF
    Extension
    $292,789.00
    Proposal total
    $138,145,038
    Money left on the table
    $5,131,824 (3.71%)
    vs. engineer’s estimate
    -30%
  • 2. Rpm Xconstruction, LLC

    Unit price
    $2.45/LF
    Extension
    $102,476.15
    Proposal total
    $143,276,861
    vs. low bid
    +$5,131,824
    vs. engineer’s estimate
    -75.5%
  • Unit price
    $1.00/LF
    Extension
    $41,827.00
    Proposal total
    $152,579,077
    vs. low bid
    +$14,434,039
    vs. engineer’s estimate
    -90%
  • Unit price
    $5.92/LF
    Extension
    $247,615.84
    Proposal total
    $153,499,152
    vs. low bid
    +$15,354,114
    vs. engineer’s estimate
    -40.8%
  • 5. Sema Construction, Inc.

    Unit price
    $2.33/LF
    Extension
    $97,456.91
    Proposal total
    $154,136,028
    vs. low bid
    +$15,990,990
    vs. engineer’s estimate
    -76.7%
  • 6. Zachry Construction Corporation

    Unit price
    $2.42/LF
    Extension
    $101,221.34
    Proposal total
    $154,873,429
    vs. low bid
    +$16,728,392
    vs. engineer’s estimate
    -75.8%

Proposal 0262-01-034 · let Nov 4, 2026 · Milam County, Bryan District

Line quantity 175 LF · Engineer’s estimate $10.00/LF

  • 1. Big Creek Construction, Ltd.

    LOW BID · WINNER
    Unit price
    $15.00/LF
    Extension
    $2,625.00
    Proposal total
    $9,787,627
    Money left on the table
    $395,153 (4.04%)
    vs. engineer’s estimate
    +50%
  • Unit price
    $1.00/LF
    Extension
    $175.00
    Proposal total
    $10,182,780
    vs. low bid
    +$395,153
    vs. engineer’s estimate
    -90%
  • Unit price
    $35.00/LF
    Extension
    $6,125.00
    Proposal total
    $10,424,591
    vs. low bid
    +$636,964
    vs. engineer’s estimate
    +250%
  • Unit price
    $10.00/LF
    Extension
    $1,750.00
    Proposal total
    $12,020,138
    vs. low bid
    +$2,232,511
    vs. engineer’s estimate
    0%
  • Unit price
    $9.50/LF
    Extension
    $1,662.50
    Proposal total
    $12,374,454
    vs. low bid
    +$2,586,827
    vs. engineer’s estimate
    -5%
  • 6. Patin Construction LLC

    Unit price
    $5.00/LF
    Extension
    $875.00
    Proposal total
    $15,629,317
    vs. low bid
    +$5,841,690
    vs. engineer’s estimate
    -50%
  • 7. Joe Bland Construction LLC

    Unit price
    $5.00/LF
    Extension
    $875.00
    Proposal total
    $18,492,861
    vs. low bid
    +$8,705,235
    vs. engineer’s estimate
    -50%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040047-04-032CollinDallas19,7404Mario Sinacola & Sons Excavating, Inc.$1.00$7.50
2026-11-040195-02-092DentonDallas41,8276Indus Road & Bridge, Inc.$7.00$10.00
2026-11-040262-01-034MilamBryan1757Big Creek Construction, Ltd.$15.00$10.00
2026-11-040947-03-034JasperBeaumont802Texas Materials Group, Inc.$6.60$25.00
2026-11-041017-03-040HuntParis1749Highway 19 Construction LLC$5.00$15.00
2026-11-030015-13-432TravisAustin69,959.416Austin Bridge & Road Services, LP$10.00$10.00
2026-10-136505-28-001AndersonTyler1627Icos Management, LLC$10.00$25.00
2026-10-070143-03-049WilsonSan Antonio1,5758Hunter Industries, Ltd.$28.03$6.50
2026-10-070200-01-093AngelinaLufkin1,8217Longview Bridge and Road, Ltd.$10.00$12.00
2026-10-070510-06-024FanninParis8246A. K. Gillis & Sons, LLC$15.00$10.00

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene17$15.00$6.00$3.00—
Amarillo38$25.00$5.60$20.00-13.83%
Atlanta27$10.00$10.00$10.00—
Austin178$10.00$11.55$10.00-25.93%
Beaumont17$10.00$12.00$7.00—
Brownwood24$120.00$66.13$98.00—
Bryan82$15.00$10.00$10.00+25.96%
Childress16$49.50$45.00$60.00—
Corpus Christi45$2.00$4.95$1.00+100%
Dallas284$6.00$3.00$10.00+4.21%
El Paso18$3.00$3.75$7.00—
Fort Worth109$4.40$4.99$10.00-40%
Houston95$1.05$3.79$5.00-37.5%
Laredo47$2.42$6.27$8.00-41.58%
Lubbock13$3.00$3.00$11.00—
Lufkin40$10.00$8.50$12.00-34.37%
Odessa14$38.50$2.20$15.00—
Paris71$3.26$11.60$7.40+29.31%
Pharr129$1.00$2.00$10.00-43.92%
San Antonio124$3.68$5.00$9.75-48.17%
Tyler80$9.00$5.00$9.000%
Waco64$10.00$5.00$6.00-5.35%
Wichita Falls44$10.00$10.00$15.00-33.33%
Yoakum105$2.00$10.92$13.00-9.58%

Related items

Is your price for item 402-7001 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.