Drill Shaft (Rdwy ILL Pole) (30 IN) (Item 416-7040): TxDOT Unit Price History
1,105 bids · 194 bid lines · Nov 6, 2024 to Nov 12, 2026 · unit of measure LF
TxDOT 416-7040 · DRILL SHAFT (RDWY ILL POLE) (30 IN) · Unit: LF
- Low bid
- $250.00/LF
- Quantity-weighted median of winning unit prices
- Weighted median
- $255.00/LF
- Quantity-weighted median of every bid
- Engineer’s estimate
- $300.00/LF
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -16.12%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 12, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 416-7040 (Drill Shaft (Rdwy ILL Pole) (30 IN)) is measured in LF. Between Nov 6, 2024 and Nov 12, 2026, contractors entered 1,105 bids for it on 194 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 692 bids was $255.00 per LF, and the winning low bidders priced it at a weighted median of $250.00 per LF.
TxDOT's engineer's estimate for the same lines had a weighted median of $300.00 per LF, so winning bids came in 16.7% below the estimate.
By calendar year, the median bid moved from $352.61 in 2025 (440 bids) to $289.26 in 2026 (631 bids), down 18.0%. The middle half of 2026 bids fell between $240.35 and $355.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 16.12%.
Quantity matters for this item. Lines of 1 to 48 LF had a weighted median of $352.00, while lines above 190 LF had $260.00, a 26% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 189 lines where both a winning and a second-place bid were published, the median winning unit price was $300.00 against $300.00 from the second-lowest bidder, a median gap of 5.26% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 23 TxDOT districts with at least ten bids, Houston had the lowest weighted median ($194.98) and Childress the highest ($575.50). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 12, 2026 in Dallas County, where Highway Intelligent Traffic Solutions, LLC was the low bidder at $280.45 per LF for 100 LF against an estimate of $300.00.
2 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 416-7006 Drill Shaft (36 IN) (weighted median $270.00 per LF); 420-7012 CL C Conc (Abut) (weighted median $1,250.00 per CY); 403-7001 Temporary SPL Shoring (weighted median $31.39 per SF); 429-7007 Conc STR Repair (Vertical & Overhead) (weighted median $150.00 per SF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 34 | 7 | $388.32 | $349.67 | $354.84 | $251.75 | $459.75 |
| 2025 | 440 | 87 | $356.45 | $323.34 | $352.61 | $293.00 | $450.00 |
| 2026 | 631 | 100 | $264.19 | $250.00 | $289.26 | $240.35 | $355.00 |
Quantity bands
| Band | Quantity (LF) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 1–48 | 396 | $398.50 | $352.00 | $285.00–$450.50 |
| Medium | 50–184 | 348 | $340.70 | $300.00 | $255.50–$400.00 |
| Large | 190–2,032 | 361 | $279.42 | $260.00 | $227.70–$350.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $300.00
- Median second-low unit price
- $300.00
- Median engineer’s estimate
- $330.00
- Median gap, second vs. low
- +5.26%
189 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 6504-57-001 · let Nov 12, 2026 · Dallas County, Dallas District
Line quantity 100 LF · Engineer’s estimate $300.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Highway Intelligent Traffic Solutions, LLCLOW BID | $280.45/LF | $28,045.00 | — | -6.5% | $792,536 | $105,738 (13.34%) left on table |
| 2 | Elecnor Belco Electric, Inc. | $440.00/LF | $44,000.00 | +$15,955 | +46.7% | $898,274 | +$105,738 |
| 3 | American Lighting and Signalization, LLC | $360.00/LF | $36,000.00 | +$7,955 | +20% | $900,000 | +$107,464 |
| 4 | Road Solutions L.L.C. | $340.00/LF | $34,000.00 | +$5,955 | +13.3% | $940,478 | +$147,942 |
| 5 | Yunex LLC | $511.00/LF | $51,100.00 | +$23,055 | +70.3% | $1,358,810 | +$566,274 |
1. Highway Intelligent Traffic Solutions, LLC
LOW BID · WINNER- Unit price
- $280.45/LF
- Extension
- $28,045.00
- Proposal total
- $792,536
- Money left on the table
- $105,738 (13.34%)
- vs. engineer’s estimate
- -6.5%
- Unit price
- $440.00/LF
- Extension
- $44,000.00
- Proposal total
- $898,274
- vs. low bid
- +$105,738
- vs. engineer’s estimate
- +46.7%
- Unit price
- $360.00/LF
- Extension
- $36,000.00
- Proposal total
- $900,000
- vs. low bid
- +$107,464
- vs. engineer’s estimate
- +20%
4. Road Solutions L.L.C.
- Unit price
- $340.00/LF
- Extension
- $34,000.00
- Proposal total
- $940,478
- vs. low bid
- +$147,942
- vs. engineer’s estimate
- +13.3%
5. Yunex LLC
- Unit price
- $511.00/LF
- Extension
- $51,100.00
- Proposal total
- $1,358,810
- vs. low bid
- +$566,274
- vs. engineer’s estimate
- +70.3%
Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District
Line quantity 328 LF · Engineer’s estimate $350.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc.LOW BID | $225.00/LF | $73,800.00 | — | -35.7% | $138,145,038 | $5,131,824 (3.71%) left on table |
| 2 | Rpm Xconstruction, LLC | $255.00/LF | $83,640.00 | +$9,840 | -27.1% | $143,276,861 | +$5,131,824 |
| 3 | Mario Sinacola & Sons Excavating, Inc. | $216.00/LF | $70,848.00 | -$2,952 | -38.3% | $152,579,077 | +$14,434,039 |
| 4 | Webber, LLC | $216.00/LF | $70,848.00 | -$2,952 | -38.3% | $153,499,152 | +$15,354,114 |
| 5 | Sema Construction, Inc. | $216.00/LF | $70,848.00 | -$2,952 | -38.3% | $154,136,028 | +$15,990,990 |
| 6 | Zachry Construction Corporation | $224.16/LF | $73,524.48 | -$275.52 | -36% | $154,873,429 | +$16,728,392 |
- LOW BID · WINNER
- Unit price
- $225.00/LF
- Extension
- $73,800.00
- Proposal total
- $138,145,038
- Money left on the table
- $5,131,824 (3.71%)
- vs. engineer’s estimate
- -35.7%
2. Rpm Xconstruction, LLC
- Unit price
- $255.00/LF
- Extension
- $83,640.00
- Proposal total
- $143,276,861
- vs. low bid
- +$5,131,824
- vs. engineer’s estimate
- -27.1%
- Unit price
- $216.00/LF
- Extension
- $70,848.00
- Proposal total
- $152,579,077
- vs. low bid
- +$14,434,039
- vs. engineer’s estimate
- -38.3%
4. Webber, LLC
- Unit price
- $216.00/LF
- Extension
- $70,848.00
- Proposal total
- $153,499,152
- vs. low bid
- +$15,354,114
- vs. engineer’s estimate
- -38.3%
5. Sema Construction, Inc.
- Unit price
- $216.00/LF
- Extension
- $70,848.00
- Proposal total
- $154,136,028
- vs. low bid
- +$15,990,990
- vs. engineer’s estimate
- -38.3%
6. Zachry Construction Corporation
- Unit price
- $224.16/LF
- Extension
- $73,524.48
- Proposal total
- $154,873,429
- vs. low bid
- +$16,728,392
- vs. engineer’s estimate
- -36%
Proposal 1017-03-040 · let Nov 4, 2026 · Hunt County, Paris District
Line quantity 8 LF · Engineer’s estimate $306.48/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Highway 19 Construction LLCLOW BID | $290.00/LF | $2,320.00 | — | -5.4% | $6,803,596 | $438,151 (6.44%) left on table |
| 2 | Thk Construction LLC | $973.22/LF | $7,785.76 | +$5,466 | +217.5% | $7,241,746 | +$438,151 |
| 3 | East Texas Bridge, Inc. | $330.00/LF | $2,640.00 | +$320.00 | +7.7% | $7,366,754 | +$563,159 |
| 4 | D. L. Lennon Incorporated - Contractor | $290.00/LF | $2,320.00 | $0.000 | -5.4% | $7,400,348 | +$596,752 |
| 5 | Rk Hall, LLC | $320.25/LF | $2,562.00 | +$242.00 | +4.5% | $7,514,717 | +$711,122 |
| 6 | Austin Bridge & Road Services, LP | $305.00/LF | $2,440.00 | +$120.00 | -0.5% | $7,794,981 | +$991,385 |
| 7 | Texas Materials Group, Inc. | $290.00/LF | $2,320.00 | $0.000 | -5.4% | $7,795,159 | +$991,563 |
| 8 | Cdm Holdings | $300.00/LF | $2,400.00 | +$80.00 | -2.1% | $8,325,506 | +$1,521,910 |
| 9 | Ed Bell Construction Company | $358.00/LF | $2,864.00 | +$544.00 | +16.8% | $9,159,173 | +$2,355,578 |
1. Highway 19 Construction LLC
LOW BID · WINNER- Unit price
- $290.00/LF
- Extension
- $2,320.00
- Proposal total
- $6,803,596
- Money left on the table
- $438,151 (6.44%)
- vs. engineer’s estimate
- -5.4%
- Unit price
- $973.22/LF
- Extension
- $7,785.76
- Proposal total
- $7,241,746
- vs. low bid
- +$438,151
- vs. engineer’s estimate
- +217.5%
- Unit price
- $330.00/LF
- Extension
- $2,640.00
- Proposal total
- $7,366,754
- vs. low bid
- +$563,159
- vs. engineer’s estimate
- +7.7%
- Unit price
- $290.00/LF
- Extension
- $2,320.00
- Proposal total
- $7,400,348
- vs. low bid
- +$596,752
- vs. engineer’s estimate
- -5.4%
5. Rk Hall, LLC
- Unit price
- $320.25/LF
- Extension
- $2,562.00
- Proposal total
- $7,514,717
- vs. low bid
- +$711,122
- vs. engineer’s estimate
- +4.5%
- Unit price
- $305.00/LF
- Extension
- $2,440.00
- Proposal total
- $7,794,981
- vs. low bid
- +$991,385
- vs. engineer’s estimate
- -0.5%
- Unit price
- $290.00/LF
- Extension
- $2,320.00
- Proposal total
- $7,795,159
- vs. low bid
- +$991,563
- vs. engineer’s estimate
- -5.4%
8. Cdm Holdings
- Unit price
- $300.00/LF
- Extension
- $2,400.00
- Proposal total
- $8,325,506
- vs. low bid
- +$1,521,910
- vs. engineer’s estimate
- -2.1%
- Unit price
- $358.00/LF
- Extension
- $2,864.00
- Proposal total
- $9,159,173
- vs. low bid
- +$2,355,578
- vs. engineer’s estimate
- +16.8%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-12 | 6504-57-001 | Dallas | Dallas | 100 | 5 | Highway Intelligent Traffic Solutions, LLC | $280.45 | $300.00 |
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 328 | 6 | Indus Road & Bridge, Inc. | $225.00 | $350.00 |
| 2026-11-04 | 1017-03-040 | Hunt | Paris | 8 | 9 | Highway 19 Construction LLC | $290.00 | $306.48 |
| 2026-11-04 | 1052-02-098 | Nueces | Corpus Christi | 80 | 5 | J E Construction Services, LLC | $234.00 | $300.00 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 1,324 | 6 | Austin Bridge & Road Services, LP | $389.32 | $125.00 |
| 2026-11-03 | 0619-03-068 | Collin | Dallas | 704 | 13 | Rcr Telecon LLC | $200.00 | $225.00 |
| 2026-10-07 | 0921-02-527 | Hidalgo | Pharr | 64 | 1 | Digg Commercial, LLC | $300.00 | $300.00 |
| 2026-10-06 | 0009-11-248 | Dallas | Dallas | 74 | 7 | Ragle Construction, Inc. | $295.48 | $576.00 |
| 2026-10-06 | 0095-03-100 | Kaufman | Dallas | 166 | 10 | Highway 19 Construction LLC | $290.00 | $290.00 |
| 2026-09-03 | 0275-03-072 | Carson | Amarillo | 40 | 7 | Gilvin-Terrill, Ltd. | $300.00 | $275.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 14 | $300.00 | $331.00 | $300.00 | — |
| Amarillo | 29 | $300.00 | $350.00 | $370.00 | — |
| Atlanta | 22 | $255.00 | $300.00 | $240.00 | — |
| Austin | 66 | $389.32 | $320.00 | $125.00 | -1.41% |
| Beaumont | 27 | $188.81 | $245.00 | $225.00 | — |
| Brownwood | 7 | $400.00 | $368.00 | $360.00 | — |
| Bryan | 56 | $225.00 | $225.00 | $300.00 | -33.14% |
| Childress | 13 | $553.00 | $575.50 | $350.00 | — |
| Corpus Christi | 38 | $397.75 | $290.00 | $300.00 | +3.07% |
| Dallas | 185 | $200.00 | $255.00 | $350.00 | -25.65% |
| El Paso | 15 | $385.00 | $399.00 | $320.19 | — |
| Fort Worth | 51 | $250.00 | $316.00 | $355.00 | — |
| Houston | 71 | $130.00 | $194.98 | $195.00 | — |
| Laredo | 47 | $260.00 | $289.96 | $340.00 | +2.87% |
| Lubbock | 39 | $267.00 | $270.00 | $330.00 | -9.97% |
| Lufkin | 34 | $300.00 | $295.00 | $300.00 | 0% |
| Odessa | 81 | $476.54 | $400.00 | $458.00 | -21.12% |
| Paris | 19 | $330.00 | $265.00 | $300.00 | — |
| Pharr | 31 | $235.19 | $235.19 | $245.00 | -4.42% |
| San Angelo | 8 | $305.00 | $327.88 | $400.00 | — |
| San Antonio | 80 | $225.00 | $280.00 | $300.00 | -11.92% |
| Tyler | 57 | $248.00 | $248.00 | $315.00 | — |
| Waco | 50 | $305.00 | $350.00 | $350.00 | -18.09% |
| Wichita Falls | 13 | $300.00 | $273.00 | $300.00 | — |
| Yoakum | 52 | $250.00 | $231.00 | $250.00 | +10.89% |
Related items
- 416-7006 · Drill Shaft (36 IN) ($270.00/LF)
- 420-7012 · CL C Conc (Abut) ($1,250.00/CY)
- 403-7001 · Temporary SPL Shoring ($31.39/SF)
- 429-7007 · Conc STR Repair (Vertical & Overhead) ($150.00/SF)
- 402-7001 · Trench Excavation Protection ($4.65/LF)
- 401-7001 · Flowable Backfill ($231.39/CY)
- 432-7013 · Riprap (MOW Strip)(4 IN) ($645.00/CY)
- 400-7010 · CEM Stabil Bkfl ($133.66/CY)
Is your price for item 416-7040 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.