Temporary SPL Shoring (Item 403-7001): TxDOT Unit Price History
1,957 bids · 315 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure SF
TxDOT 403-7001 · TEMPORARY SPL SHORING · Unit: SF
- Low bid
- $20.00/SF
- Quantity-weighted median of winning unit prices
- Weighted median
- $31.39/SF
- Quantity-weighted median of every bid
- Engineer’s estimate
- $30.00/SF
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -17.73%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 403-7001 (Temporary SPL Shoring) is measured in SF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,957 bids for it on 315 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,068 bids was $31.39 per SF, and the winning low bidders priced it at a weighted median of $20.00 per SF.
TxDOT's engineer's estimate for the same lines had a weighted median of $30.00 per SF, so winning bids came in 33.3% below the estimate.
By calendar year, the median bid moved from $45.00 in 2025 (912 bids) to $36.00 in 2026 (978 bids), down 20.0%. The middle half of 2026 bids fell between $22.69 and $55.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 17.73%.
Quantity matters for this item. Lines of 31 to 792 SF had a weighted median of $45.00, while lines above 3,427 SF had $32.00, a 29% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 283 lines where both a winning and a second-place bid were published, the median winning unit price was $32.40 against $35.00 from the second-lowest bidder, a median gap of 4.6% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 23 TxDOT districts with at least ten bids, Yoakum had the lowest weighted median ($10.00) and Corpus Christi the highest ($71.22). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 4, 2026 in Denton County, where Indus Road & Bridge, Inc. was the low bidder at $20.00 per SF for 173,740 SF against an estimate of $20.00.
85 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 402-7001 Trench Excavation Protection (weighted median $4.65 per LF); 401-7001 Flowable Backfill (weighted median $231.39 per CY); 400-7010 CEM Stabil Bkfl (weighted median $133.66 per CY); 416-7006 Drill Shaft (36 IN) (weighted median $270.00 per LF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 67 | 10 | $52.28 | $50.00 | $52.90 | $30.77 | $85.00 |
| 2025 | 912 | 154 | $35.95 | $35.00 | $45.00 | $26.26 | $65.00 |
| 2026 | 978 | 152 | $32.75 | $30.00 | $36.00 | $22.69 | $55.00 |
Quantity bands
| Band | Quantity (SF) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 31–792 | 654 | $53.54 | $45.00 | $27.50–$75.00 |
| Medium | 800–3,378 | 657 | $49.14 | $41.50 | $25.00–$62.00 |
| Large | 3,427–173,740 | 646 | $33.08 | $32.00 | $21.00–$50.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $32.40
- Median second-low unit price
- $35.00
- Median engineer’s estimate
- $36.00
- Median gap, second vs. low
- +4.6%
283 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District
Line quantity 173,740 SF · Engineer’s estimate $20.00/SF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc.LOW BID | $20.00/SF | $3,474,800.00 | — | 0% | $138,145,038 | $5,131,824 (3.71%) left on table |
| 2 | Rpm Xconstruction, LLC | $21.55/SF | $3,744,097.00 | +$269,297 | +7.8% | $143,276,861 | +$5,131,824 |
| 4 | Webber, LLC | $33.45/SF | $5,811,603.00 | +$2,336,803 | +67.3% | $153,499,152 | +$15,354,114 |
| 5 | Sema Construction, Inc. | $29.47/SF | $5,120,117.80 | +$1,645,318 | +47.3% | $154,136,028 | +$15,990,990 |
- LOW BID · WINNER
- Unit price
- $20.00/SF
- Extension
- $3,474,800.00
- Proposal total
- $138,145,038
- Money left on the table
- $5,131,824 (3.71%)
- vs. engineer’s estimate
- 0%
2. Rpm Xconstruction, LLC
- Unit price
- $21.55/SF
- Extension
- $3,744,097.00
- Proposal total
- $143,276,861
- vs. low bid
- +$5,131,824
- vs. engineer’s estimate
- +7.8%
4. Webber, LLC
- Unit price
- $33.45/SF
- Extension
- $5,811,603.00
- Proposal total
- $153,499,152
- vs. low bid
- +$15,354,114
- vs. engineer’s estimate
- +67.3%
5. Sema Construction, Inc.
- Unit price
- $29.47/SF
- Extension
- $5,120,117.80
- Proposal total
- $154,136,028
- vs. low bid
- +$15,990,990
- vs. engineer’s estimate
- +47.3%
Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District
Line quantity 2,297 SF · Engineer’s estimate $40.00/SF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Fluor Enterprises, Inc.LOW BID | $48.50/SF | $111,404.50 | — | +21.3% | $30,209,876 | $2,977,718 (9.86%) left on table |
| 2 | Big Creek Construction, Ltd. | $32.00/SF | $73,504.00 | -$37,901 | -20% | $33,187,594 | +$2,977,718 |
| 3 | Knife River Corporation - South | $50.00/SF | $114,850.00 | +$3,446 | +25% | $33,911,798 | +$3,701,922 |
| 4 | R Construction Civil, LLC | $63.00/SF | $144,711.00 | +$33,307 | +57.5% | $34,862,676 | +$4,652,800 |
| 5 | James Construction Group, LLC | $68.62/SF | $157,620.14 | +$46,216 | +71.6% | $39,237,828 | +$9,027,952 |
| 6 | Texas Materials Group, Inc. | $80.03/SF | $183,828.91 | +$72,424 | +100.1% | $39,562,405 | +$9,352,529 |
| 7 | A. L. Helmcamp, Inc. | $120.00/SF | $275,640.00 | +$164,236 | +200% | $39,630,699 | +$9,420,823 |
| 8 | Posillico Civil, Inc. | $155.00/SF | $356,035.00 | +$244,631 | +287.5% | $39,994,995 | +$9,785,119 |
| 9 | Zachry Construction Corporation | $32.23/SF | $74,032.31 | -$37,372 | -19.4% | $42,444,061 | +$12,234,185 |
| 10 | Brizo Construction, LLC | $87.55/SF | $201,102.35 | +$89,698 | +118.9% | $43,708,350 | +$13,498,474 |
| 11 | Granite Construction Company | $18.60/SF | $42,724.20 | -$68,680 | -53.5% | $44,387,970 | +$14,178,094 |
| 12 | Isi Contracting, Inc. | $56.00/SF | $128,632.00 | +$17,228 | +40% | $48,396,973 | +$18,187,097 |
1. Fluor Enterprises, Inc.
LOW BID · WINNER- Unit price
- $48.50/SF
- Extension
- $111,404.50
- Proposal total
- $30,209,876
- Money left on the table
- $2,977,718 (9.86%)
- vs. engineer’s estimate
- +21.3%
- Unit price
- $32.00/SF
- Extension
- $73,504.00
- Proposal total
- $33,187,594
- vs. low bid
- +$2,977,718
- vs. engineer’s estimate
- -20%
- Unit price
- $50.00/SF
- Extension
- $114,850.00
- Proposal total
- $33,911,798
- vs. low bid
- +$3,701,922
- vs. engineer’s estimate
- +25%
- Unit price
- $63.00/SF
- Extension
- $144,711.00
- Proposal total
- $34,862,676
- vs. low bid
- +$4,652,800
- vs. engineer’s estimate
- +57.5%
- Unit price
- $68.62/SF
- Extension
- $157,620.14
- Proposal total
- $39,237,828
- vs. low bid
- +$9,027,952
- vs. engineer’s estimate
- +71.6%
- Unit price
- $80.03/SF
- Extension
- $183,828.91
- Proposal total
- $39,562,405
- vs. low bid
- +$9,352,529
- vs. engineer’s estimate
- +100.1%
- Unit price
- $120.00/SF
- Extension
- $275,640.00
- Proposal total
- $39,630,699
- vs. low bid
- +$9,420,823
- vs. engineer’s estimate
- +200%
- Unit price
- $155.00/SF
- Extension
- $356,035.00
- Proposal total
- $39,994,995
- vs. low bid
- +$9,785,119
- vs. engineer’s estimate
- +287.5%
9. Zachry Construction Corporation
- Unit price
- $32.23/SF
- Extension
- $74,032.31
- Proposal total
- $42,444,061
- vs. low bid
- +$12,234,185
- vs. engineer’s estimate
- -19.4%
10. Brizo Construction, LLC
- Unit price
- $87.55/SF
- Extension
- $201,102.35
- Proposal total
- $43,708,350
- vs. low bid
- +$13,498,474
- vs. engineer’s estimate
- +118.9%
- Unit price
- $18.60/SF
- Extension
- $42,724.20
- Proposal total
- $44,387,970
- vs. low bid
- +$14,178,094
- vs. engineer’s estimate
- -53.5%
- Unit price
- $56.00/SF
- Extension
- $128,632.00
- Proposal total
- $48,396,973
- vs. low bid
- +$18,187,097
- vs. engineer’s estimate
- +40%
Proposal 0922-33-234 · let Nov 4, 2026 · Webb County, Laredo District
Line quantity 2,775 SF · Engineer’s estimate $15.00/SF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Stx CivilLOW BID | $8.68/SF | $24,087.00 | — | -42.1% | $2,866,785 | $83,215 (2.9%) left on table |
| 2 | Delgado's Contractors, LLC | $35.00/SF | $97,125.00 | +$73,038 | +133.3% | $2,950,000 | +$83,215 |
| 3 | Acee Construction LLC. | $21.00/SF | $58,275.00 | +$34,188 | +40% | $3,033,273 | +$166,488 |
| 4 | James Construction Group, LLC | $42.66/SF | $118,381.50 | +$94,295 | +184.4% | $3,261,472 | +$394,687 |
| 5 | E-Z Bel Construction, LLC | $24.00/SF | $66,600.00 | +$42,513 | +60% | $3,270,969 | +$404,184 |
| 6 | Lucania Contractors LLC | $30.00/SF | $83,250.00 | +$59,163 | +100% | $3,466,015 | +$599,230 |
1. Stx Civil
LOW BID · WINNER- Unit price
- $8.68/SF
- Extension
- $24,087.00
- Proposal total
- $2,866,785
- Money left on the table
- $83,215 (2.9%)
- vs. engineer’s estimate
- -42.1%
- Unit price
- $35.00/SF
- Extension
- $97,125.00
- Proposal total
- $2,950,000
- vs. low bid
- +$83,215
- vs. engineer’s estimate
- +133.3%
3. Acee Construction LLC.
- Unit price
- $21.00/SF
- Extension
- $58,275.00
- Proposal total
- $3,033,273
- vs. low bid
- +$166,488
- vs. engineer’s estimate
- +40%
- Unit price
- $42.66/SF
- Extension
- $118,381.50
- Proposal total
- $3,261,472
- vs. low bid
- +$394,687
- vs. engineer’s estimate
- +184.4%
- Unit price
- $24.00/SF
- Extension
- $66,600.00
- Proposal total
- $3,270,969
- vs. low bid
- +$404,184
- vs. engineer’s estimate
- +60%
- Unit price
- $30.00/SF
- Extension
- $83,250.00
- Proposal total
- $3,466,015
- vs. low bid
- +$599,230
- vs. engineer’s estimate
- +100%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 173,740 | 4 | Indus Road & Bridge, Inc. | $20.00 | $20.00 |
| 2026-11-04 | 0212-03-058 | Brazos | Bryan | 2,297 | 12 | Fluor Enterprises, Inc. | $48.50 | $40.00 |
| 2026-11-04 | 0922-33-234 | Webb | Laredo | 2,775 | 6 | Stx Civil | $8.68 | $15.00 |
| 2026-11-04 | 0947-03-034 | Jasper | Beaumont | 538 | 2 | Texas Materials Group, Inc. | $34.10 | $43.00 |
| 2026-11-04 | 1017-03-040 | Hunt | Paris | 1,478 | 9 | Highway 19 Construction LLC | $10.00 | $20.00 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 70,152 | 6 | Austin Bridge & Road Services, LP | $33.00 | $77.00 |
| 2026-10-13 | 6505-28-001 | Anderson | Tyler | 2,536 | 7 | Icos Management, LLC | $5.00 | $35.00 |
| 2026-10-07 | 0014-23-041 | Hill | Waco | 800 | 5 | Northeastern Pavers, LLC | $35.00 | $30.00 |
| 2026-10-07 | 0022-01-034 | Terrell | Odessa | 1,421 | 7 | Relmco, Inc. | $25.00 | $28.00 |
| 2026-10-07 | 0143-03-049 | Wilson | San Antonio | 6,380 | 8 | Hunter Industries, Ltd. | $28.03 | $14.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 55 | $2.00 | $22.20 | $15.00 | -30.21% |
| Amarillo | 31 | $5.50 | $43.50 | $100.00 | -17% |
| Atlanta | 36 | $35.00 | $35.00 | $30.00 | -39.7% |
| Austin | 139 | $33.00 | $39.33 | $77.00 | -19.54% |
| Beaumont | 30 | $71.00 | $61.00 | $46.00 | — |
| Brownwood | 50 | $125.00 | $51.50 | $37.00 | +71.67% |
| Bryan | 121 | $40.00 | $45.00 | $30.00 | -4.26% |
| Childress | 25 | $24.00 | $25.00 | $30.00 | — |
| Corpus Christi | 42 | $62.00 | $71.22 | $35.00 | +8.77% |
| Dallas | 305 | $20.00 | $29.47 | $28.00 | -20% |
| Fort Worth | 96 | $16.00 | $33.00 | $47.00 | -30.36% |
| Houston | 113 | $32.00 | $32.70 | $23.00 | — |
| Laredo | 54 | $14.00 | $16.20 | $60.00 | -4.86% |
| Lubbock | 5 | $30.00 | $30.00 | $40.00 | — |
| Lufkin | 67 | $32.00 | $33.00 | $50.00 | -22% |
| Odessa | 45 | $35.83 | $35.83 | $30.00 | +36.67% |
| Paris | 83 | $35.00 | $35.00 | $30.70 | -48.28% |
| Pharr | 26 | $6.80 | $30.00 | $20.00 | -18.75% |
| San Angelo | 21 | $49.00 | $35.00 | $50.00 | — |
| San Antonio | 138 | $13.30 | $28.56 | $20.00 | +15.77% |
| Tyler | 131 | $59.00 | $50.00 | $46.00 | 0% |
| Waco | 86 | $30.00 | $30.00 | $25.00 | -10% |
| Wichita Falls | 82 | $32.40 | $40.00 | $35.00 | -11.11% |
| Yoakum | 176 | $10.00 | $10.00 | $30.00 | +3.99% |
Related items
- 402-7001 · Trench Excavation Protection ($4.65/LF)
- 401-7001 · Flowable Backfill ($231.39/CY)
- 400-7010 · CEM Stabil Bkfl ($133.66/CY)
- 416-7006 · Drill Shaft (36 IN) ($270.00/LF)
- 416-7040 · Drill Shaft (Rdwy ILL Pole) (30 IN) ($255.00/LF)
- 420-7012 · CL C Conc (Abut) ($1,250.00/CY)
- 429-7007 · Conc STR Repair (Vertical & Overhead) ($150.00/SF)
- 432-7013 · Riprap (MOW Strip)(4 IN) ($645.00/CY)
Is your price for item 403-7001 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.