Drill Shaft (36 IN) (Item 416-7006): TxDOT Unit Price History

1,226 bids · 175 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure LF

TxDOT 416-7006 · DRILL SHAFT (36 IN) · Unit: LF

Low bid
$265.00/LF
Quantity-weighted median of winning unit prices
Weighted median
$270.00/LF
Quantity-weighted median of every bid
Engineer’s estimate
$270.00/LF
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-5.97%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$200.00$300.00$400.00$500.00$600.00$700.001101001K10K100KQuantity (LF), log scaleUnit price ($/LF)
Winning (low) bid Other bid Fitted price curve (ln price = 6.34 − 0.089·ln qty, R² 0.16)320 plotted bids, 2 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 416-7006 (Drill Shaft (36 IN)) is measured in LF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,226 bids for it on 175 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 683 bids was $270.00 per LF, and the winning low bidders priced it at a weighted median of $265.00 per LF.

Winning unit prices sat close to TxDOT's own engineer's estimate ($270.00 per LF), within two percent.

By calendar year, the median bid moved from $335.00 in 2025 (508 bids) to $310.00 in 2026 (666 bids), down 7.5%. The middle half of 2026 bids fell between $255.00 and $400.00.

Comparing the last 12 months with the 12 months before, the median unit price fell 5.97%.

Quantity matters for this item. Lines of 1 to 325 LF had a weighted median of $352.00, while lines above 1,080 LF had $260.40, a 26% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 174 lines where both a winning and a second-place bid were published, the median winning unit price was $300.00 against $303.24 from the second-lowest bidder, a median gap of -0.15% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 24 TxDOT districts with at least ten bids, Paris had the lowest weighted median ($207.00) and San Angelo the highest ($465.00). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 4, 2026 in Denton County, where Indus Road & Bridge, Inc. was the low bidder at $165.00 per LF for 8,911 LF against an estimate of $190.00.

Related items: 416-7040 Drill Shaft (Rdwy ILL Pole) (30 IN) (weighted median $255.00 per LF); 420-7012 CL C Conc (Abut) (weighted median $1,250.00 per CY); 403-7001 Temporary SPL Shoring (weighted median $31.39 per SF); 429-7007 Conc STR Repair (Vertical & Overhead) (weighted median $150.00 per SF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
2024528$271.88$246.40$340.89$257.50$405.39
202550877$320.13$290.00$335.00$275.00$416.25
202666690$285.43$270.00$310.00$255.00$400.00

Quantity bands

BandQuantity (LF)BidsWeighted avgWeighted median25th–75th pct
Small1–325415$381.09$352.00$306.50–$471.25
Medium354–1,061402$340.11$320.00$260.20–$400.00
Large1,080–20,406409$284.96$260.40$233.27–$347.69

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$300.00
Median second-low unit price
$303.24
Median engineer’s estimate
$320.00
Median gap, second vs. low
+-0.15%

174 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District

Line quantity 8,911 LF · Engineer’s estimate $190.00/LF

  • 1. Indus Road & Bridge, Inc.

    LOW BID · WINNER
    Unit price
    $165.00/LF
    Extension
    $1,470,315.00
    Proposal total
    $138,145,038
    Money left on the table
    $5,131,824 (3.71%)
    vs. engineer’s estimate
    -13.2%
  • 2. Rpm Xconstruction, LLC

    Unit price
    $165.00/LF
    Extension
    $1,470,315.00
    Proposal total
    $143,276,861
    vs. low bid
    +$5,131,824
    vs. engineer’s estimate
    -13.2%
  • Unit price
    $185.00/LF
    Extension
    $1,648,535.00
    Proposal total
    $152,579,077
    vs. low bid
    +$14,434,039
    vs. engineer’s estimate
    -2.6%
  • Unit price
    $168.33/LF
    Extension
    $1,499,988.63
    Proposal total
    $153,499,152
    vs. low bid
    +$15,354,114
    vs. engineer’s estimate
    -11.4%
  • 5. Sema Construction, Inc.

    Unit price
    $183.25/LF
    Extension
    $1,632,940.75
    Proposal total
    $154,136,028
    vs. low bid
    +$15,990,990
    vs. engineer’s estimate
    -3.6%
  • 6. Zachry Construction Corporation

    Unit price
    $171.71/LF
    Extension
    $1,530,107.81
    Proposal total
    $154,873,429
    vs. low bid
    +$16,728,392
    vs. engineer’s estimate
    -9.6%

Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District

Line quantity 1,854 LF · Engineer’s estimate $280.00/LF

  • 1. Fluor Enterprises, Inc.

    LOW BID · WINNER
    Unit price
    $204.00/LF
    Extension
    $378,216.00
    Proposal total
    $30,209,876
    Money left on the table
    $2,977,718 (9.86%)
    vs. engineer’s estimate
    -27.1%
  • Unit price
    $240.00/LF
    Extension
    $444,960.00
    Proposal total
    $33,187,594
    vs. low bid
    +$2,977,718
    vs. engineer’s estimate
    -14.3%
  • Unit price
    $260.00/LF
    Extension
    $482,040.00
    Proposal total
    $33,911,798
    vs. low bid
    +$3,701,922
    vs. engineer’s estimate
    -7.1%
  • Unit price
    $290.00/LF
    Extension
    $537,660.00
    Proposal total
    $34,862,676
    vs. low bid
    +$4,652,800
    vs. engineer’s estimate
    +3.6%
  • Unit price
    $202.89/LF
    Extension
    $376,158.06
    Proposal total
    $39,237,828
    vs. low bid
    +$9,027,952
    vs. engineer’s estimate
    -27.5%
  • Unit price
    $275.00/LF
    Extension
    $509,850.00
    Proposal total
    $39,562,405
    vs. low bid
    +$9,352,529
    vs. engineer’s estimate
    -1.8%
  • Unit price
    $380.00/LF
    Extension
    $704,520.00
    Proposal total
    $39,630,699
    vs. low bid
    +$9,420,823
    vs. engineer’s estimate
    +35.7%
  • Unit price
    $265.00/LF
    Extension
    $491,310.00
    Proposal total
    $39,994,995
    vs. low bid
    +$9,785,119
    vs. engineer’s estimate
    -5.4%
  • 9. Zachry Construction Corporation

    Unit price
    $233.27/LF
    Extension
    $432,482.58
    Proposal total
    $42,444,061
    vs. low bid
    +$12,234,185
    vs. engineer’s estimate
    -16.7%
  • 10. Brizo Construction, LLC

    Unit price
    $400.00/LF
    Extension
    $741,600.00
    Proposal total
    $43,708,350
    vs. low bid
    +$13,498,474
    vs. engineer’s estimate
    +42.9%
  • Unit price
    $210.55/LF
    Extension
    $390,359.70
    Proposal total
    $44,387,970
    vs. low bid
    +$14,178,094
    vs. engineer’s estimate
    -24.8%
  • Unit price
    $405.00/LF
    Extension
    $750,870.00
    Proposal total
    $48,396,973
    vs. low bid
    +$18,187,097
    vs. engineer’s estimate
    +44.6%

Proposal 0922-33-234 · let Nov 4, 2026 · Webb County, Laredo District

Line quantity 537 LF · Engineer’s estimate $275.00/LF

  • 1. Stx Civil

    LOW BID · WINNER
    Unit price
    $667.42/LF
    Extension
    $358,404.54
    Proposal total
    $2,866,785
    Money left on the table
    $83,215 (2.9%)
    vs. engineer’s estimate
    +142.7%
  • Unit price
    $500.00/LF
    Extension
    $268,500.00
    Proposal total
    $2,950,000
    vs. low bid
    +$83,215
    vs. engineer’s estimate
    +81.8%
  • 3. Acee Construction LLC.

    Unit price
    $546.40/LF
    Extension
    $293,416.80
    Proposal total
    $3,033,273
    vs. low bid
    +$166,488
    vs. engineer’s estimate
    +98.7%
  • Unit price
    $401.04/LF
    Extension
    $215,358.48
    Proposal total
    $3,261,472
    vs. low bid
    +$394,687
    vs. engineer’s estimate
    +45.8%
  • Unit price
    $470.00/LF
    Extension
    $252,390.00
    Proposal total
    $3,270,969
    vs. low bid
    +$404,184
    vs. engineer’s estimate
    +70.9%
  • Unit price
    $610.00/LF
    Extension
    $327,570.00
    Proposal total
    $3,466,015
    vs. low bid
    +$599,230
    vs. engineer’s estimate
    +121.8%
  • Unit price
    $600.00/LF
    Extension
    $322,200.00
    Proposal total
    $5,083,300
    vs. low bid
    +$2,216,516
    vs. engineer’s estimate
    +118.2%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040195-02-092DentonDallas8,9116Indus Road & Bridge, Inc.$165.00$190.00
2026-11-040212-03-058BrazosBryan1,85412Fluor Enterprises, Inc.$204.00$280.00
2026-11-040922-33-234WebbLaredo5377Stx Civil$667.42$275.00
2026-11-030015-13-432TravisAustin7,5306Austin Bridge & Road Services, LP$350.63$370.00
2026-11-030917-30-068BurlesonBryan15015C & W Southern LLC$270.00$330.00
2026-10-070022-01-034TerrellOdessa967Relmco, Inc.$450.00$260.00
2026-10-060009-11-248DallasDallas4,6867Ragle Construction, Inc.$290.00$210.00
2026-10-060095-03-100KaufmanDallas14,31510Highway 19 Construction LLC$181.00$250.00
2026-10-060912-34-209Fort BendHouston2569Garret Shields Infrastructure$260.00$351.72
2026-10-066503-57-001DallasDallas184Synergy Signs & Services LLC$300.00$300.00

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene51$325.00$265.00$270.00+18.4%
Amarillo20$176.00$275.00$375.00—
Atlanta13$294.91$294.91$325.00—
Austin49$350.63$383.83$370.00+10.02%
Beaumont10$246.40$237.00$300.00—
Bryan75$204.00$275.00$280.00-8.38%
Childress16$295.00$375.00$300.00—
Corpus Christi55$415.00$374.00$280.00+15.89%
Dallas142$181.00$232.83$250.00-19.82%
El Paso18$287.00$287.00$400.00—
Fort Worth128$260.00$260.00$275.00-0.77%
Houston90$278.44$370.00$320.00-4.83%
Laredo32$215.00$250.00$300.00—
Lubbock13$500.00$274.94$330.00—
Lufkin48$310.00$307.50$275.00—
Odessa36$374.00$314.60$350.00-29.2%
Paris86$204.00$207.00$308.00-1.82%
Pharr30$215.00$260.28$185.00-3.45%
San Angelo13$465.00$465.00$300.00—
San Antonio66$280.00$260.40$235.00+46.83%
Tyler65$222.00$255.00$270.00-19.24%
Waco56$186.00$260.00$350.00-9%
Wichita Falls20$231.08$280.00$330.00—
Yoakum94$300.00$279.12$300.00-9.09%

Related items

Is your price for item 416-7006 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.