Riprap (MOW Strip)(4 IN) (Item 432-7013): TxDOT Unit Price History
3,466 bids · 584 bid lines · Nov 6, 2024 to Nov 12, 2026 · unit of measure CY
TxDOT 432-7013 · RIPRAP (MOW STRIP)(4 IN) · Unit: CY
- Low bid
- $600.00/CY
- Quantity-weighted median of winning unit prices
- Weighted median
- $645.00/CY
- Quantity-weighted median of every bid
- Engineer’s estimate
- $642.00/CY
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -3.08%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 12, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 432-7013 (Riprap (MOW Strip)(4 IN)) is measured in CY. Between Nov 6, 2024 and Nov 12, 2026, contractors entered 3,466 bids for it on 584 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,821 bids was $645.00 per CY, and the winning low bidders priced it at a weighted median of $600.00 per CY.
TxDOT's engineer's estimate for the same lines had a weighted median of $642.00 per CY, so winning bids came in 6.5% below the estimate.
By calendar year, the median bid moved from $720.00 in 2025 (1,631 bids) to $700.00 in 2026 (1,727 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $600.00 and $800.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 3.08%.
Quantity matters for this item. Lines of 0.6 to 38 CY had a weighted median of $750.00, while lines above 102 CY had $640.00, a 15% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 541 lines where both a winning and a second-place bid were published, the median winning unit price was $675.00 against $700.00 from the second-lowest bidder, a median gap of 2.5% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 24 TxDOT districts with at least ten bids, Lufkin had the lowest weighted median ($461.00) and Childress the highest ($780.00). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 12, 2026 in Denton County, where Road Doctors LLC was the low bidder at $700.00 per CY for 3 CY against an estimate of $650.00.
104 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 432-7001 Riprap (Conc)(4 IN) (weighted median $515.00 per CY); 432-7043 Riprap (Stone Protection)(18 IN) (weighted median $189.00 per CY); 432-7002 Riprap (Conc)(5 IN) (weighted median $587.00 per CY); 432-7041 Riprap (Stone Protection)(12 IN) (weighted median $185.00 per CY).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 108 | 18 | $795.65 | $737.56 | $731.91 | $600.00 | $885.00 |
| 2025 | 1,631 | 285 | $686.07 | $656.25 | $720.00 | $600.00 | $852.75 |
| 2026 | 1,727 | 284 | $646.91 | $645.00 | $700.00 | $600.00 | $800.00 |
Quantity bands
| Band | Quantity (CY) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 0.6–38 | 1,165 | $801.42 | $750.00 | $630.00–$949.23 |
| Medium | 39–101 | 1,159 | $728.80 | $700.00 | $602.33–$816.72 |
| Large | 102–4,546 | 1,142 | $649.59 | $640.00 | $585.00–$770.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $675.00
- Median second-low unit price
- $700.00
- Median engineer’s estimate
- $675.00
- Median gap, second vs. low
- +2.5%
541 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 6497-55-001 · let Nov 12, 2026 · Denton County, Dallas District
Line quantity 3 CY · Engineer’s estimate $650.00/CY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Road Doctors LLCLOW BID | $700.00/CY | $2,100.00 | — | +7.7% | $493,320 | $25,748 (5.22%) left on table |
| 2 | Icos Management, LLC | $682.50/CY | $2,047.50 | -$52.50 | +5% | $519,068 | +$25,748 |
| 3 | Texas Road Construction, LLC | $1,000.00/CY | $3,000.00 | +$900.00 | +53.8% | $567,220 | +$73,900 |
| 4 | Rear Contractors LLC | $1,000.00/CY | $3,000.00 | +$900.00 | +53.8% | $598,798 | +$105,478 |
| 5 | Premier Contractors LLC | $800.00/CY | $2,400.00 | +$300.00 | +23.1% | $654,688 | +$161,368 |
| 6 | Jr West Texas Concrete LLC | $1,400.00/CY | $4,200.00 | +$2,100 | +115.4% | $746,209 | +$252,889 |
- LOW BID · WINNER
- Unit price
- $700.00/CY
- Extension
- $2,100.00
- Proposal total
- $493,320
- Money left on the table
- $25,748 (5.22%)
- vs. engineer’s estimate
- +7.7%
- Unit price
- $682.50/CY
- Extension
- $2,047.50
- Proposal total
- $519,068
- vs. low bid
- +$25,748
- vs. engineer’s estimate
- +5%
- Unit price
- $1,000.00/CY
- Extension
- $3,000.00
- Proposal total
- $567,220
- vs. low bid
- +$73,900
- vs. engineer’s estimate
- +53.8%
- Unit price
- $1,000.00/CY
- Extension
- $3,000.00
- Proposal total
- $598,798
- vs. low bid
- +$105,478
- vs. engineer’s estimate
- +53.8%
- Unit price
- $800.00/CY
- Extension
- $2,400.00
- Proposal total
- $654,688
- vs. low bid
- +$161,368
- vs. engineer’s estimate
- +23.1%
6. Jr West Texas Concrete LLC
- Unit price
- $1,400.00/CY
- Extension
- $4,200.00
- Proposal total
- $746,209
- vs. low bid
- +$252,889
- vs. engineer’s estimate
- +115.4%
Proposal 0157-04-058 · let Nov 4, 2026 · Haskell County, Abilene District
Line quantity 107 CY · Engineer’s estimate $800.00/CY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Lone Star Paving CompanyLOW BID | $765.00/CY | $81,855.00 | — | -4.4% | $6,732,215 | $1,063,968 (15.8%) left on table |
| 2 | Rk Hall, LLC | $970.35/CY | $103,827.45 | +$21,972 | +21.3% | $7,796,183 | +$1,063,968 |
| 3 | Zack Burkett Co. | $835.30/CY | $89,377.10 | +$7,522 | +4.4% | $7,966,171 | +$1,233,956 |
| 4 | Foutsco Paving Company, LLC | $920.00/CY | $98,440.00 | +$16,585 | +15% | $8,000,580 | +$1,268,365 |
| 5 | Nobles Road Construction, Inc. | $803.00/CY | $85,921.00 | +$4,066 | +0.4% | $8,307,427 | +$1,575,212 |
| 6 | Ck Newberry, LLC | $775.00/CY | $82,925.00 | +$1,070 | -3.1% | $8,389,000 | +$1,656,785 |
| 7 | Reece Albert, Inc. | $933.76/CY | $99,912.32 | +$18,057 | +16.7% | $8,534,153 | +$1,801,938 |
| 8 | Texas Materials Group, Inc. | $765.00/CY | $81,855.00 | $0.000 | -4.4% | $8,617,318 | +$1,885,103 |
| 9 | A. L. Helmcamp, Inc. | $870.00/CY | $93,090.00 | +$11,235 | +8.8% | $9,257,856 | +$2,525,641 |
- LOW BID · WINNER
- Unit price
- $765.00/CY
- Extension
- $81,855.00
- Proposal total
- $6,732,215
- Money left on the table
- $1,063,968 (15.8%)
- vs. engineer’s estimate
- -4.4%
2. Rk Hall, LLC
- Unit price
- $970.35/CY
- Extension
- $103,827.45
- Proposal total
- $7,796,183
- vs. low bid
- +$1,063,968
- vs. engineer’s estimate
- +21.3%
- Unit price
- $835.30/CY
- Extension
- $89,377.10
- Proposal total
- $7,966,171
- vs. low bid
- +$1,233,956
- vs. engineer’s estimate
- +4.4%
- Unit price
- $920.00/CY
- Extension
- $98,440.00
- Proposal total
- $8,000,580
- vs. low bid
- +$1,268,365
- vs. engineer’s estimate
- +15%
5. Nobles Road Construction, Inc.
- Unit price
- $803.00/CY
- Extension
- $85,921.00
- Proposal total
- $8,307,427
- vs. low bid
- +$1,575,212
- vs. engineer’s estimate
- +0.4%
- Unit price
- $775.00/CY
- Extension
- $82,925.00
- Proposal total
- $8,389,000
- vs. low bid
- +$1,656,785
- vs. engineer’s estimate
- -3.1%
- Unit price
- $933.76/CY
- Extension
- $99,912.32
- Proposal total
- $8,534,153
- vs. low bid
- +$1,801,938
- vs. engineer’s estimate
- +16.7%
- Unit price
- $765.00/CY
- Extension
- $81,855.00
- Proposal total
- $8,617,318
- vs. low bid
- +$1,885,103
- vs. engineer’s estimate
- -4.4%
- Unit price
- $870.00/CY
- Extension
- $93,090.00
- Proposal total
- $9,257,856
- vs. low bid
- +$2,525,641
- vs. engineer’s estimate
- +8.8%
Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District
Line quantity 478 CY · Engineer’s estimate $625.00/CY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc.LOW BID | $465.00/CY | $222,270.00 | — | -25.6% | $138,145,038 | $5,131,824 (3.71%) left on table |
| 2 | Rpm Xconstruction, LLC | $695.00/CY | $332,210.00 | +$109,940 | +11.2% | $143,276,861 | +$5,131,824 |
| 3 | Mario Sinacola & Sons Excavating, Inc. | $660.00/CY | $315,480.00 | +$93,210 | +5.6% | $152,579,077 | +$14,434,039 |
| 4 | Webber, LLC | $633.13/CY | $302,636.14 | +$80,366 | +1.3% | $153,499,152 | +$15,354,114 |
| 5 | Sema Construction, Inc. | $660.70/CY | $315,814.60 | +$93,545 | +5.7% | $154,136,028 | +$15,990,990 |
| 6 | Zachry Construction Corporation | $386.86/CY | $184,919.08 | -$37,351 | -38.1% | $154,873,429 | +$16,728,392 |
- LOW BID · WINNER
- Unit price
- $465.00/CY
- Extension
- $222,270.00
- Proposal total
- $138,145,038
- Money left on the table
- $5,131,824 (3.71%)
- vs. engineer’s estimate
- -25.6%
2. Rpm Xconstruction, LLC
- Unit price
- $695.00/CY
- Extension
- $332,210.00
- Proposal total
- $143,276,861
- vs. low bid
- +$5,131,824
- vs. engineer’s estimate
- +11.2%
- Unit price
- $660.00/CY
- Extension
- $315,480.00
- Proposal total
- $152,579,077
- vs. low bid
- +$14,434,039
- vs. engineer’s estimate
- +5.6%
4. Webber, LLC
- Unit price
- $633.13/CY
- Extension
- $302,636.14
- Proposal total
- $153,499,152
- vs. low bid
- +$15,354,114
- vs. engineer’s estimate
- +1.3%
5. Sema Construction, Inc.
- Unit price
- $660.70/CY
- Extension
- $315,814.60
- Proposal total
- $154,136,028
- vs. low bid
- +$15,990,990
- vs. engineer’s estimate
- +5.7%
6. Zachry Construction Corporation
- Unit price
- $386.86/CY
- Extension
- $184,919.08
- Proposal total
- $154,873,429
- vs. low bid
- +$16,728,392
- vs. engineer’s estimate
- -38.1%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-12 | 6497-55-001 | Denton | Dallas | 3 | 6 | Road Doctors LLC | $700.00 | $650.00 |
| 2026-11-04 | 0157-04-058 | Haskell | Abilene | 107 | 9 | Lone Star Paving Company | $765.00 | $800.00 |
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 478 | 6 | Indus Road & Bridge, Inc. | $465.00 | $625.00 |
| 2026-11-04 | 0212-03-058 | Brazos | Bryan | 100 | 12 | Fluor Enterprises, Inc. | $675.00 | $700.00 |
| 2026-11-04 | 0922-33-234 | Webb | Laredo | 44 | 7 | Stx Civil | $623.05 | $695.00 |
| 2026-11-04 | 0947-03-034 | Jasper | Beaumont | 108 | 2 | Texas Materials Group, Inc. | $660.00 | $635.00 |
| 2026-11-04 | 1017-03-040 | Hunt | Paris | 70 | 9 | Highway 19 Construction LLC | $600.00 | $500.00 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 43 | 6 | Austin Bridge & Road Services, LP | $643.09 | $600.00 |
| 2026-11-03 | 0038-01-107 | Webb | Laredo | 1,365 | 4 | Hjc Farms, Inc. | $425.00 | $500.00 |
| 2026-11-03 | 0220-01-038 | Hidalgo | Pharr | 153 | 2 | Foremost Paving, Inc. | $429.43 | $565.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 79 | $655.00 | $675.00 | $588.40 | -5.02% |
| Amarillo | 72 | $457.00 | $530.00 | $740.00 | -6.7% |
| Atlanta | 124 | $615.00 | $610.00 | $565.00 | -13.43% |
| Austin | 240 | $588.36 | $675.00 | $625.00 | -0.16% |
| Beaumont | 125 | $700.00 | $655.00 | $532.00 | +1.75% |
| Brownwood | 71 | $670.00 | $670.00 | $650.00 | +18.56% |
| Bryan | 189 | $600.00 | $675.00 | $625.85 | -5.69% |
| Childress | 101 | $715.00 | $780.00 | $797.50 | -2.5% |
| Corpus Christi | 112 | $618.11 | $625.00 | $140.00 | -3.38% |
| Dallas | 458 | $625.00 | $668.00 | $625.00 | 0% |
| El Paso | 35 | $600.00 | $600.00 | $645.00 | — |
| Fort Worth | 289 | $585.00 | $660.00 | $850.00 | -9.5% |
| Houston | 338 | $677.31 | $700.00 | $600.00 | -0.12% |
| Laredo | 98 | $583.26 | $588.00 | $625.00 | -15.67% |
| Lufkin | 24 | $330.00 | $461.00 | $400.00 | -36.67% |
| Odessa | 77 | $687.33 | $681.00 | $700.00 | -11.81% |
| Paris | 159 | $650.00 | $650.00 | $600.00 | +1.89% |
| Pharr | 135 | $480.00 | $482.85 | $591.57 | -6.3% |
| San Angelo | 72 | $650.00 | $715.00 | $750.00 | +3.45% |
| San Antonio | 261 | $515.00 | $618.54 | $605.00 | -0.74% |
| Tyler | 170 | $580.00 | $638.00 | $700.00 | -3.19% |
| Waco | 118 | $625.00 | $675.00 | $700.00 | -7.3% |
| Wichita Falls | 93 | $630.00 | $767.55 | $550.00 | +7.38% |
| Yoakum | 26 | $302.13 | $470.00 | $450.00 | — |
Related items
- 432-7001 · Riprap (Conc)(4 IN) ($515.00/CY)
- 432-7043 · Riprap (Stone Protection)(18 IN) ($189.00/CY)
- 432-7002 · Riprap (Conc)(5 IN) ($587.00/CY)
- 432-7041 · Riprap (Stone Protection)(12 IN) ($185.00/CY)
- 429-7007 · Conc STR Repair (Vertical & Overhead) ($150.00/SF)
- 438-7007 · Cleaning AND Sealing Exist Joints (CL7) ($40.00/LF)
- 420-7012 · CL C Conc (Abut) ($1,250.00/CY)
- 416-7006 · Drill Shaft (36 IN) ($270.00/LF)
Is your price for item 432-7013 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.