Riprap (Stone Protection)(18 IN) (Item 432-7043): TxDOT Unit Price History
1,742 bids · 240 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure CY
TxDOT 432-7043 · RIPRAP (STONE PROTECTION)(18 IN) · Unit: CY
- Low bid
- $155.00/CY
- Quantity-weighted median of winning unit prices
- Weighted median
- $189.00/CY
- Quantity-weighted median of every bid
- Engineer’s estimate
- $182.00/CY
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -5.35%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 432-7043 (Riprap (Stone Protection)(18 IN)) is measured in CY. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,742 bids for it on 240 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 956 bids was $189.00 per CY, and the winning low bidders priced it at a weighted median of $155.00 per CY.
TxDOT's engineer's estimate for the same lines had a weighted median of $182.00 per CY, so winning bids came in 14.8% below the estimate.
By calendar year, the median bid moved from $220.00 in 2025 (781 bids) to $210.00 in 2026 (894 bids), down 4.5%. The middle half of 2026 bids fell between $175.00 and $264.45.
Comparing the last 12 months with the 12 months before, the median unit price fell 5.35%.
Quantity matters for this item. Lines of 4 to 213 CY had a weighted median of $236.00, while lines above 887 CY had $189.27, a 20% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 238 lines where both a winning and a second-place bid were published, the median winning unit price was $200.00 against $210.00 from the second-lowest bidder, a median gap of 5.41% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 20 TxDOT districts with at least ten bids, Bryan had the lowest weighted median ($164.00) and San Angelo the highest ($269.36). The busiest district for this item was Yoakum.
The most recent letting with this item was on Nov 4, 2026 in Brazos County, where Fluor Enterprises, Inc. was the low bidder at $134.00 per CY for 6,840 CY against an estimate of $150.00.
10 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 432-7013 Riprap (MOW Strip)(4 IN) (weighted median $645.00 per CY); 432-7001 Riprap (Conc)(4 IN) (weighted median $515.00 per CY); 432-7002 Riprap (Conc)(5 IN) (weighted median $587.00 per CY); 432-7041 Riprap (Stone Protection)(12 IN) (weighted median $185.00 per CY).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 67 | 10 | $256.22 | $231.00 | $224.50 | $185.00 | $279.00 |
| 2025 | 781 | 113 | $210.53 | $200.00 | $220.00 | $185.00 | $270.00 |
| 2026 | 894 | 118 | $196.84 | $187.57 | $210.00 | $175.00 | $264.45 |
Quantity bands
| Band | Quantity (CY) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 4–213 | 582 | $256.30 | $236.00 | $200.00–$319.50 |
| Medium | 214–876 | 585 | $225.62 | $210.00 | $184.75–$260.00 |
| Large | 887–13,166 | 575 | $197.94 | $189.27 | $161.65–$225.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $200.00
- Median second-low unit price
- $210.00
- Median engineer’s estimate
- $205.05
- Median gap, second vs. low
- +5.41%
238 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District
Line quantity 6,840 CY · Engineer’s estimate $150.00/CY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Fluor Enterprises, Inc.LOW BID | $134.00/CY | $916,560.00 | — | -10.7% | $30,209,876 | $2,977,718 (9.86%) left on table |
| 2 | Big Creek Construction, Ltd. | $140.00/CY | $957,600.00 | +$41,040 | -6.7% | $33,187,594 | +$2,977,718 |
| 3 | Knife River Corporation - South | $164.00/CY | $1,121,760.00 | +$205,200 | +9.3% | $33,911,798 | +$3,701,922 |
| 4 | R Construction Civil, LLC | $160.00/CY | $1,094,400.00 | +$177,840 | +6.7% | $34,862,676 | +$4,652,800 |
| 5 | James Construction Group, LLC | $187.57/CY | $1,282,978.80 | +$366,419 | +25% | $39,237,828 | +$9,027,952 |
| 6 | Texas Materials Group, Inc. | $215.00/CY | $1,470,600.00 | +$554,040 | +43.3% | $39,562,405 | +$9,352,529 |
| 7 | A. L. Helmcamp, Inc. | $125.00/CY | $855,000.00 | -$61,560 | -16.7% | $39,630,699 | +$9,420,823 |
| 8 | Posillico Civil, Inc. | $184.00/CY | $1,258,560.00 | +$342,000 | +22.7% | $39,994,995 | +$9,785,119 |
| 9 | Zachry Construction Corporation | $156.45/CY | $1,070,118.00 | +$153,558 | +4.3% | $42,444,061 | +$12,234,185 |
| 10 | Brizo Construction, LLC | $260.00/CY | $1,778,400.00 | +$861,840 | +73.3% | $43,708,350 | +$13,498,474 |
| 11 | Granite Construction Company | $156.40/CY | $1,069,776.00 | +$153,216 | +4.3% | $44,387,970 | +$14,178,094 |
| 12 | Isi Contracting, Inc. | $256.00/CY | $1,751,040.00 | +$834,480 | +70.7% | $48,396,973 | +$18,187,097 |
1. Fluor Enterprises, Inc.
LOW BID · WINNER- Unit price
- $134.00/CY
- Extension
- $916,560.00
- Proposal total
- $30,209,876
- Money left on the table
- $2,977,718 (9.86%)
- vs. engineer’s estimate
- -10.7%
- Unit price
- $140.00/CY
- Extension
- $957,600.00
- Proposal total
- $33,187,594
- vs. low bid
- +$2,977,718
- vs. engineer’s estimate
- -6.7%
- Unit price
- $164.00/CY
- Extension
- $1,121,760.00
- Proposal total
- $33,911,798
- vs. low bid
- +$3,701,922
- vs. engineer’s estimate
- +9.3%
- Unit price
- $160.00/CY
- Extension
- $1,094,400.00
- Proposal total
- $34,862,676
- vs. low bid
- +$4,652,800
- vs. engineer’s estimate
- +6.7%
- Unit price
- $187.57/CY
- Extension
- $1,282,978.80
- Proposal total
- $39,237,828
- vs. low bid
- +$9,027,952
- vs. engineer’s estimate
- +25%
- Unit price
- $215.00/CY
- Extension
- $1,470,600.00
- Proposal total
- $39,562,405
- vs. low bid
- +$9,352,529
- vs. engineer’s estimate
- +43.3%
- Unit price
- $125.00/CY
- Extension
- $855,000.00
- Proposal total
- $39,630,699
- vs. low bid
- +$9,420,823
- vs. engineer’s estimate
- -16.7%
- Unit price
- $184.00/CY
- Extension
- $1,258,560.00
- Proposal total
- $39,994,995
- vs. low bid
- +$9,785,119
- vs. engineer’s estimate
- +22.7%
9. Zachry Construction Corporation
- Unit price
- $156.45/CY
- Extension
- $1,070,118.00
- Proposal total
- $42,444,061
- vs. low bid
- +$12,234,185
- vs. engineer’s estimate
- +4.3%
10. Brizo Construction, LLC
- Unit price
- $260.00/CY
- Extension
- $1,778,400.00
- Proposal total
- $43,708,350
- vs. low bid
- +$13,498,474
- vs. engineer’s estimate
- +73.3%
- Unit price
- $156.40/CY
- Extension
- $1,069,776.00
- Proposal total
- $44,387,970
- vs. low bid
- +$14,178,094
- vs. engineer’s estimate
- +4.3%
- Unit price
- $256.00/CY
- Extension
- $1,751,040.00
- Proposal total
- $48,396,973
- vs. low bid
- +$18,187,097
- vs. engineer’s estimate
- +70.7%
Proposal 1017-03-040 · let Nov 4, 2026 · Hunt County, Paris District
Line quantity 95 CY · Engineer’s estimate $160.00/CY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Highway 19 Construction LLCLOW BID | $180.00/CY | $17,100.00 | — | +12.5% | $6,803,596 | $438,151 (6.44%) left on table |
| 2 | Thk Construction LLC | $160.00/CY | $15,200.00 | -$1,900 | 0% | $7,241,746 | +$438,151 |
| 3 | East Texas Bridge, Inc. | $250.00/CY | $23,750.00 | +$6,650 | +56.3% | $7,366,754 | +$563,159 |
| 4 | D. L. Lennon Incorporated - Contractor | $250.00/CY | $23,750.00 | +$6,650 | +56.3% | $7,400,348 | +$596,752 |
| 5 | Rk Hall, LLC | $305.55/CY | $29,027.25 | +$11,927 | +91% | $7,514,717 | +$711,122 |
| 6 | Austin Bridge & Road Services, LP | $161.68/CY | $15,359.60 | -$1,740 | +1.1% | $7,794,981 | +$991,385 |
| 7 | Texas Materials Group, Inc. | $250.00/CY | $23,750.00 | +$6,650 | +56.3% | $7,795,159 | +$991,563 |
| 8 | Cdm Holdings | $260.00/CY | $24,700.00 | +$7,600 | +62.5% | $8,325,506 | +$1,521,910 |
| 9 | Ed Bell Construction Company | $370.00/CY | $35,150.00 | +$18,050 | +131.3% | $9,159,173 | +$2,355,578 |
1. Highway 19 Construction LLC
LOW BID · WINNER- Unit price
- $180.00/CY
- Extension
- $17,100.00
- Proposal total
- $6,803,596
- Money left on the table
- $438,151 (6.44%)
- vs. engineer’s estimate
- +12.5%
- Unit price
- $160.00/CY
- Extension
- $15,200.00
- Proposal total
- $7,241,746
- vs. low bid
- +$438,151
- vs. engineer’s estimate
- 0%
- Unit price
- $250.00/CY
- Extension
- $23,750.00
- Proposal total
- $7,366,754
- vs. low bid
- +$563,159
- vs. engineer’s estimate
- +56.3%
- Unit price
- $250.00/CY
- Extension
- $23,750.00
- Proposal total
- $7,400,348
- vs. low bid
- +$596,752
- vs. engineer’s estimate
- +56.3%
5. Rk Hall, LLC
- Unit price
- $305.55/CY
- Extension
- $29,027.25
- Proposal total
- $7,514,717
- vs. low bid
- +$711,122
- vs. engineer’s estimate
- +91%
- Unit price
- $161.68/CY
- Extension
- $15,359.60
- Proposal total
- $7,794,981
- vs. low bid
- +$991,385
- vs. engineer’s estimate
- +1.1%
- Unit price
- $250.00/CY
- Extension
- $23,750.00
- Proposal total
- $7,795,159
- vs. low bid
- +$991,563
- vs. engineer’s estimate
- +56.3%
8. Cdm Holdings
- Unit price
- $260.00/CY
- Extension
- $24,700.00
- Proposal total
- $8,325,506
- vs. low bid
- +$1,521,910
- vs. engineer’s estimate
- +62.5%
- Unit price
- $370.00/CY
- Extension
- $35,150.00
- Proposal total
- $9,159,173
- vs. low bid
- +$2,355,578
- vs. engineer’s estimate
- +131.3%
Proposal 0917-30-068 · let Nov 3, 2026 · Burleson County, Bryan District
Line quantity 218 CY · Engineer’s estimate $160.00/CY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | C & W Southern LLCLOW BID | $190.00/CY | $41,420.00 | — | +18.8% | $721,844 | $6,333 (0.88%) left on table |
| 2 | Thk Construction LLC | $160.00/CY | $34,880.00 | -$6,540 | 0% | $728,177 | +$6,333 |
| 3 | Knife River Corporation - South | $191.00/CY | $41,638.00 | +$218.00 | +19.4% | $735,430 | +$13,586 |
| 4 | E-Z Bel Construction, LLC | $188.00/CY | $40,984.00 | -$436.00 | +17.5% | $749,950 | +$28,106 |
| 5 | Trevway, Inc. | $215.00/CY | $46,870.00 | +$5,450 | +34.4% | $758,500 | +$36,656 |
| 6 | Garret Shields Infrastructure | $180.00/CY | $39,240.00 | -$2,180 | +12.5% | $793,429 | +$71,585 |
| 7 | Hodges and Son Construction Company, Inc. | $220.00/CY | $47,960.00 | +$6,540 | +37.5% | $832,669 | +$110,825 |
| 8 | Presidio Contracting, LLC | $230.00/CY | $50,140.00 | +$8,720 | +43.8% | $843,422 | +$121,578 |
| 9 | Yoko Excavating, LLC | $175.00/CY | $38,150.00 | -$3,270 | +9.4% | $847,156 | +$125,312 |
| 10 | Stx Civil | $169.21/CY | $36,887.78 | -$4,532 | +5.8% | $867,320 | +$145,476 |
| 11 | Taylor Bridge LLC | $200.00/CY | $43,600.00 | +$2,180 | +25% | $911,373 | +$189,529 |
| 12 | Scott Tucker Construction Company, LLC | $132.00/CY | $28,776.00 | -$12,644 | -17.5% | $911,850 | +$190,006 |
| 13 | Rucoba & Maya Construction, LLC | $150.00/CY | $32,700.00 | -$8,720 | -6.3% | $954,437 | +$232,593 |
| 14 | Rb Contracting, LLC | $290.00/CY | $63,220.00 | +$21,800 | +81.3% | $1,079,985 | +$358,141 |
| 15 | Fuqua Construction Co., Inc. | $255.98/CY | $55,803.42 | +$14,383 | +60% | $1,415,641 | +$693,797 |
- LOW BID · WINNER
- Unit price
- $190.00/CY
- Extension
- $41,420.00
- Proposal total
- $721,844
- Money left on the table
- $6,333 (0.88%)
- vs. engineer’s estimate
- +18.8%
- Unit price
- $160.00/CY
- Extension
- $34,880.00
- Proposal total
- $728,177
- vs. low bid
- +$6,333
- vs. engineer’s estimate
- 0%
- Unit price
- $191.00/CY
- Extension
- $41,638.00
- Proposal total
- $735,430
- vs. low bid
- +$13,586
- vs. engineer’s estimate
- +19.4%
- Unit price
- $188.00/CY
- Extension
- $40,984.00
- Proposal total
- $749,950
- vs. low bid
- +$28,106
- vs. engineer’s estimate
- +17.5%
- Unit price
- $215.00/CY
- Extension
- $46,870.00
- Proposal total
- $758,500
- vs. low bid
- +$36,656
- vs. engineer’s estimate
- +34.4%
6. Garret Shields Infrastructure
- Unit price
- $180.00/CY
- Extension
- $39,240.00
- Proposal total
- $793,429
- vs. low bid
- +$71,585
- vs. engineer’s estimate
- +12.5%
- Unit price
- $220.00/CY
- Extension
- $47,960.00
- Proposal total
- $832,669
- vs. low bid
- +$110,825
- vs. engineer’s estimate
- +37.5%
- Unit price
- $230.00/CY
- Extension
- $50,140.00
- Proposal total
- $843,422
- vs. low bid
- +$121,578
- vs. engineer’s estimate
- +43.8%
- Unit price
- $175.00/CY
- Extension
- $38,150.00
- Proposal total
- $847,156
- vs. low bid
- +$125,312
- vs. engineer’s estimate
- +9.4%
10. Stx Civil
- Unit price
- $169.21/CY
- Extension
- $36,887.78
- Proposal total
- $867,320
- vs. low bid
- +$145,476
- vs. engineer’s estimate
- +5.8%
- Unit price
- $200.00/CY
- Extension
- $43,600.00
- Proposal total
- $911,373
- vs. low bid
- +$189,529
- vs. engineer’s estimate
- +25%
- Unit price
- $132.00/CY
- Extension
- $28,776.00
- Proposal total
- $911,850
- vs. low bid
- +$190,006
- vs. engineer’s estimate
- -17.5%
13. Rucoba & Maya Construction, LLC
- Unit price
- $150.00/CY
- Extension
- $32,700.00
- Proposal total
- $954,437
- vs. low bid
- +$232,593
- vs. engineer’s estimate
- -6.3%
- Unit price
- $290.00/CY
- Extension
- $63,220.00
- Proposal total
- $1,079,985
- vs. low bid
- +$358,141
- vs. engineer’s estimate
- +81.3%
15. Fuqua Construction Co., Inc.
- Unit price
- $255.98/CY
- Extension
- $55,803.42
- Proposal total
- $1,415,641
- vs. low bid
- +$693,797
- vs. engineer’s estimate
- +60%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0212-03-058 | Brazos | Bryan | 6,840 | 12 | Fluor Enterprises, Inc. | $134.00 | $150.00 |
| 2026-11-04 | 1017-03-040 | Hunt | Paris | 95 | 9 | Highway 19 Construction LLC | $180.00 | $160.00 |
| 2026-11-03 | 0917-30-068 | Burleson | Bryan | 218 | 15 | C & W Southern LLC | $190.00 | $160.00 |
| 2026-10-15 | 6508-04-001 | Hopkins | Paris | 85 | 11 | 12twelve Road and Bridge LLC | $240.00 | $300.00 |
| 2026-10-13 | 6505-28-001 | Anderson | Tyler | 4 | 7 | Icos Management, LLC | $600.00 | $250.00 |
| 2026-10-07 | 0510-06-024 | Fannin | Paris | 352 | 6 | A. K. Gillis & Sons, LLC | $265.57 | $180.00 |
| 2026-10-07 | 6503-72-001 | Lampasas | Brownwood | 810 | 9 | Taylor Bridge LLC | $200.00 | $240.00 |
| 2026-10-06 | 0095-03-100 | Kaufman | Dallas | 8,651 | 10 | Highway 19 Construction LLC | $150.00 | $150.00 |
| 2026-10-06 | 0410-02-047 | Grayson | Paris | 230 | 7 | Highway 19 Construction LLC | $150.00 | $160.00 |
| 2026-10-06 | 6499-74-001 | Comanche | Brownwood | 40 | 11 | Taylor Bridge LLC | $325.00 | $240.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 68 | $240.00 | $222.00 | $200.00 | -14.85% |
| Amarillo | 4 | — | $541.00 | — | — |
| Atlanta | 50 | $170.00 | $231.00 | $220.50 | — |
| Austin | 104 | $185.00 | $233.00 | $185.00 | 0% |
| Beaumont | 11 | $190.00 | $200.00 | $195.00 | — |
| Brownwood | 54 | $200.00 | $225.00 | $240.00 | +8.33% |
| Bryan | 143 | $134.00 | $164.00 | $150.00 | 0% |
| Childress | 10 | $220.00 | $240.18 | $243.00 | — |
| Corpus Christi | 81 | $135.00 | $210.00 | $200.00 | -3.85% |
| Dallas | 134 | $142.00 | $170.00 | $150.00 | -18.31% |
| Fort Worth | 46 | $146.00 | $200.00 | $230.00 | -0.15% |
| Houston | 54 | $150.00 | $210.00 | $185.00 | -3.66% |
| Laredo | 7 | $325.00 | $400.00 | $200.00 | — |
| Lubbock | 4 | $600.00 | $470.73 | $200.00 | — |
| Lufkin | 32 | $120.81 | $190.00 | $175.00 | — |
| Paris | 225 | $170.00 | $180.00 | $185.00 | 0% |
| Pharr | 37 | $177.00 | $241.80 | $195.00 | +9.29% |
| San Angelo | 16 | $381.50 | $269.36 | $275.00 | — |
| San Antonio | 52 | $317.80 | $179.00 | $280.00 | -17.8% |
| Tyler | 88 | $192.00 | $225.00 | $220.00 | +6.67% |
| Waco | 166 | $150.00 | $170.00 | $200.00 | -15% |
| Wichita Falls | 40 | $160.00 | $190.00 | $200.00 | -13.04% |
| Yoakum | 316 | $200.00 | $200.00 | $200.00 | -2.91% |
Related items
- 432-7013 · Riprap (MOW Strip)(4 IN) ($645.00/CY)
- 432-7001 · Riprap (Conc)(4 IN) ($515.00/CY)
- 432-7002 · Riprap (Conc)(5 IN) ($587.00/CY)
- 432-7041 · Riprap (Stone Protection)(12 IN) ($185.00/CY)
- 429-7007 · Conc STR Repair (Vertical & Overhead) ($150.00/SF)
- 438-7007 · Cleaning AND Sealing Exist Joints (CL7) ($40.00/LF)
- 420-7012 · CL C Conc (Abut) ($1,250.00/CY)
- 416-7006 · Drill Shaft (36 IN) ($270.00/LF)
Is your price for item 432-7043 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.