Name as published by TxDOT: TAYLOR BRIDGE LLC · Data as published by TxDOT, lettings Apr 9, 2025 to Nov 3, 2026, retrieved Nov 24, 2026.
Proposals bid
45
Low bids (rank 1)
24
Win rate
53.33%
Low-bid value
$20.2M
Money left on table
$2.4M
Avg. bid vs. estimate
+0.86%
From Apr 9, 2025 to Nov 3, 2026, Taylor Bridge LLC submitted 45 bids on TxDOT proposals and was the apparent low bidder on 24 of them (53.33%), with low bids totalling $20,173,920. In 22 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $2,415,458 (12.78% of those bids); the median gap was 14.95%. On average its bids came in 0.86% above TxDOT's engineer's estimate. Its most frequent district was San Antonio (12 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.