Riprap (Conc)(5 IN) (Item 432-7002): TxDOT Unit Price History
1,702 bids · 278 bid lines · Nov 6, 2024 to Nov 12, 2026 · unit of measure CY
TxDOT 432-7002 · RIPRAP (CONC)(5 IN) · Unit: CY
- Low bid
- $590.00/CY
- Quantity-weighted median of winning unit prices
- Weighted median
- $587.00/CY
- Quantity-weighted median of every bid
- Engineer’s estimate
- $575.00/CY
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -3.9%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 12, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 432-7002 (Riprap (Conc)(5 IN)) is measured in CY. Between Nov 6, 2024 and Nov 12, 2026, contractors entered 1,702 bids for it on 278 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 939 bids was $587.00 per CY, and the winning low bidders priced it at a weighted median of $590.00 per CY.
TxDOT's engineer's estimate for the same lines had a weighted median of $575.00 per CY, so winning bids came in 2.6% above the estimate.
By calendar year, the median bid moved from $725.00 in 2025 (812 bids) to $694.10 in 2026 (862 bids), down 4.3%. The middle half of 2026 bids fell between $575.00 and $850.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 3.9%.
Quantity matters for this item. Lines of 0.8 to 20 CY had a weighted median of $800.00, while lines above 91 CY had $571.13, a 29% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 269 lines where both a winning and a second-place bid were published, the median winning unit price was $650.00 against $675.00 from the second-lowest bidder, a median gap of 0.67% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 25 TxDOT districts with at least ten bids, San Antonio had the lowest weighted median ($440.00) and El Paso the highest ($1,000.00). The busiest district for this item was San Antonio.
The most recent letting with this item was on Nov 12, 2026 in Potter County, where Ti-Zack Concrete, LLC was the low bidder at $793.13 per CY for 88 CY against an estimate of $900.00.
18 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 432-7013 Riprap (MOW Strip)(4 IN) (weighted median $645.00 per CY); 432-7001 Riprap (Conc)(4 IN) (weighted median $515.00 per CY); 432-7043 Riprap (Stone Protection)(18 IN) (weighted median $189.00 per CY); 432-7041 Riprap (Stone Protection)(12 IN) (weighted median $185.00 per CY).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 28 | 4 | $615.19 | $525.00 | $750.00 | $637.50 | $933.75 |
| 2025 | 812 | 140 | $613.54 | $600.00 | $725.00 | $600.00 | $900.00 |
| 2026 | 862 | 134 | $586.94 | $560.00 | $694.10 | $575.00 | $850.00 |
Quantity bands
| Band | Quantity (CY) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 0.8–20 | 584 | $889.20 | $800.00 | $679.00–$1,000.00 |
| Medium | 21–90 | 554 | $719.40 | $680.73 | $590.92–$824.89 |
| Large | 91–3,443 | 564 | $586.39 | $571.13 | $525.00–$725.02 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $650.00
- Median second-low unit price
- $675.00
- Median engineer’s estimate
- $650.00
- Median gap, second vs. low
- +0.67%
269 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 6504-61-001 · let Nov 12, 2026 · Potter County, Amarillo District
Line quantity 88 CY · Engineer’s estimate $900.00/CY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Ti-Zack Concrete, LLCLOW BID | $793.13/CY | $69,795.00 | — | -11.9% | $734,629 | $59,414 (8.09%) left on table |
| 2 | Cross Plus Construction, LLC | $750.00/CY | $66,000.00 | -$3,795 | -16.7% | $794,043 | +$59,414 |
| 3 | Structural Integrity Group LLC | $920.00/CY | $80,960.00 | +$11,165 | +2.2% | $852,064 | +$117,434 |
| 4 | Pathfield Investments LLC | $950.00/CY | $83,600.00 | +$13,805 | +5.6% | $863,606 | +$128,977 |
| 5 | Scr Civil Construction, LLC | $858.00/CY | $75,504.00 | +$5,709 | -4.7% | $916,535 | +$181,906 |
| 6 | Icos Management, LLC | $630.00/CY | $55,440.00 | -$14,355 | -30% | $974,652 | +$240,023 |
| 7 | Road Doctors LLC | $300.00/CY | $26,400.00 | -$43,395 | -66.7% | $981,238 | +$246,609 |
- LOW BID · WINNER
- Unit price
- $793.13/CY
- Extension
- $69,795.00
- Proposal total
- $734,629
- Money left on the table
- $59,414 (8.09%)
- vs. engineer’s estimate
- -11.9%
- Unit price
- $750.00/CY
- Extension
- $66,000.00
- Proposal total
- $794,043
- vs. low bid
- +$59,414
- vs. engineer’s estimate
- -16.7%
- Unit price
- $920.00/CY
- Extension
- $80,960.00
- Proposal total
- $852,064
- vs. low bid
- +$117,434
- vs. engineer’s estimate
- +2.2%
- Unit price
- $950.00/CY
- Extension
- $83,600.00
- Proposal total
- $863,606
- vs. low bid
- +$128,977
- vs. engineer’s estimate
- +5.6%
- Unit price
- $858.00/CY
- Extension
- $75,504.00
- Proposal total
- $916,535
- vs. low bid
- +$181,906
- vs. engineer’s estimate
- -4.7%
- Unit price
- $630.00/CY
- Extension
- $55,440.00
- Proposal total
- $974,652
- vs. low bid
- +$240,023
- vs. engineer’s estimate
- -30%
- Unit price
- $300.00/CY
- Extension
- $26,400.00
- Proposal total
- $981,238
- vs. low bid
- +$246,609
- vs. engineer’s estimate
- -66.7%
Proposal 6497-55-001 · let Nov 12, 2026 · Denton County, Dallas District
Line quantity 11 CY · Engineer’s estimate $550.00/CY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Road Doctors LLCLOW BID | $500.00/CY | $5,500.00 | — | -9.1% | $493,320 | $25,748 (5.22%) left on table |
| 2 | Icos Management, LLC | $735.00/CY | $8,085.00 | +$2,585 | +33.6% | $519,068 | +$25,748 |
| 3 | Texas Road Construction, LLC | $400.00/CY | $4,400.00 | -$1,100 | -27.3% | $567,220 | +$73,900 |
| 4 | Rear Contractors LLC | $1,200.00/CY | $13,200.00 | +$7,700 | +118.2% | $598,798 | +$105,478 |
| 5 | Premier Contractors LLC | $1,200.00/CY | $13,200.00 | +$7,700 | +118.2% | $654,688 | +$161,368 |
| 6 | Jr West Texas Concrete LLC | $947.00/CY | $10,417.00 | +$4,917 | +72.2% | $746,209 | +$252,889 |
- LOW BID · WINNER
- Unit price
- $500.00/CY
- Extension
- $5,500.00
- Proposal total
- $493,320
- Money left on the table
- $25,748 (5.22%)
- vs. engineer’s estimate
- -9.1%
- Unit price
- $735.00/CY
- Extension
- $8,085.00
- Proposal total
- $519,068
- vs. low bid
- +$25,748
- vs. engineer’s estimate
- +33.6%
- Unit price
- $400.00/CY
- Extension
- $4,400.00
- Proposal total
- $567,220
- vs. low bid
- +$73,900
- vs. engineer’s estimate
- -27.3%
- Unit price
- $1,200.00/CY
- Extension
- $13,200.00
- Proposal total
- $598,798
- vs. low bid
- +$105,478
- vs. engineer’s estimate
- +118.2%
- Unit price
- $1,200.00/CY
- Extension
- $13,200.00
- Proposal total
- $654,688
- vs. low bid
- +$161,368
- vs. engineer’s estimate
- +118.2%
6. Jr West Texas Concrete LLC
- Unit price
- $947.00/CY
- Extension
- $10,417.00
- Proposal total
- $746,209
- vs. low bid
- +$252,889
- vs. engineer’s estimate
- +72.2%
Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District
Line quantity 477 CY · Engineer’s estimate $560.00/CY
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Mario Sinacola & Sons Excavating, Inc.LOW BID | $775.00/CY | $369,675.00 | — | +38.4% | $35,766,135 | $890,797 (2.49%) left on table |
| 2 | Ed Bell Construction Company | $600.00/CY | $286,200.00 | -$83,475 | +7.1% | $36,656,931 | +$890,797 |
| 3 | Tiseo Paving Company, LLC | $674.25/CY | $321,617.25 | -$48,058 | +20.4% | $38,169,956 | +$2,403,821 |
| 4 | Harper Brothers Construction LLC | $500.00/CY | $238,500.00 | -$131,175 | -10.7% | $40,441,503 | +$4,675,368 |
1. Mario Sinacola & Sons Excavating, Inc.
LOW BID · WINNER- Unit price
- $775.00/CY
- Extension
- $369,675.00
- Proposal total
- $35,766,135
- Money left on the table
- $890,797 (2.49%)
- vs. engineer’s estimate
- +38.4%
- Unit price
- $600.00/CY
- Extension
- $286,200.00
- Proposal total
- $36,656,931
- vs. low bid
- +$890,797
- vs. engineer’s estimate
- +7.1%
3. Tiseo Paving Company, LLC
- Unit price
- $674.25/CY
- Extension
- $321,617.25
- Proposal total
- $38,169,956
- vs. low bid
- +$2,403,821
- vs. engineer’s estimate
- +20.4%
4. Harper Brothers Construction LLC
- Unit price
- $500.00/CY
- Extension
- $238,500.00
- Proposal total
- $40,441,503
- vs. low bid
- +$4,675,368
- vs. engineer’s estimate
- -10.7%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-12 | 6504-61-001 | Potter | Amarillo | 88 | 7 | Ti-Zack Concrete, LLC | $793.13 | $900.00 |
| 2026-11-12 | 6497-55-001 | Denton | Dallas | 11 | 6 | Road Doctors LLC | $500.00 | $550.00 |
| 2026-11-04 | 0047-04-032 | Collin | Dallas | 477 | 4 | Mario Sinacola & Sons Excavating, Inc. | $775.00 | $560.00 |
| 2026-11-04 | 0262-01-034 | Milam | Bryan | 9 | 7 | Big Creek Construction, Ltd. | $900.00 | $550.00 |
| 2026-11-04 | 1017-03-040 | Hunt | Paris | 4 | 9 | Highway 19 Construction LLC | $1,000.00 | $550.00 |
| 2026-11-04 | 1052-02-098 | Nueces | Corpus Christi | 5 | 5 | J E Construction Services, LLC | $724.00 | $600.00 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 564 | 6 | Austin Bridge & Road Services, LP | $477.74 | $250.00 |
| 2026-10-14 | 6485-46-001 | Denton | Dallas | 21 | 6 | Garret Shields Infrastructure | $700.00 | $605.00 |
| 2026-10-07 | 0092-03-064 | Ellis | Dallas | 961 | 8 | Xit Paving and Construction Inc. | $525.00 | $550.00 |
| 2026-10-07 | 0200-01-093 | Angelina | Lufkin | 2 | 7 | Longview Bridge and Road, Ltd. | $1,875.00 | $650.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 46 | $670.00 | $700.00 | $250.00 | 0% |
| Amarillo | 69 | $600.00 | $550.00 | $800.00 | -6.25% |
| Atlanta | 14 | $585.00 | $625.00 | $650.00 | — |
| Austin | 145 | $540.00 | $587.00 | $435.00 | -1.02% |
| Beaumont | 35 | $700.00 | $696.00 | $625.00 | -7.89% |
| Brownwood | 44 | $650.00 | $698.75 | $650.00 | +20.15% |
| Bryan | 34 | $900.00 | $780.00 | $550.00 | — |
| Childress | 12 | $715.00 | $690.00 | $800.00 | — |
| Corpus Christi | 59 | $630.00 | $590.00 | $600.00 | +2.21% |
| Dallas | 161 | $550.00 | $600.00 | $550.00 | -10.88% |
| El Paso | 19 | $1,100.00 | $1,000.00 | $747.00 | — |
| Fort Worth | 74 | $550.00 | $550.00 | $575.00 | -12% |
| Houston | 110 | $598.60 | $551.06 | $550.00 | -7.69% |
| Laredo | 33 | $734.06 | $725.00 | $700.00 | — |
| Lubbock | 72 | $650.00 | $650.00 | $750.00 | -4.66% |
| Lufkin | 43 | $550.00 | $695.25 | $500.00 | -17.65% |
| Odessa | 45 | $793.41 | $715.00 | $750.00 | +29% |
| Paris | 63 | $650.00 | $600.00 | $900.00 | -26.25% |
| Pharr | 49 | $436.00 | $450.00 | $500.00 | +1.82% |
| San Angelo | 25 | $650.00 | $715.00 | $650.00 | — |
| San Antonio | 200 | $440.00 | $440.00 | $575.00 | -1.28% |
| Tyler | 73 | $500.00 | $556.00 | $1,015.00 | -24.72% |
| Waco | 35 | $550.00 | $550.00 | $610.00 | — |
| Wichita Falls | 47 | $550.00 | $720.00 | $600.00 | +3.86% |
| Yoakum | 195 | $600.00 | $650.00 | $600.00 | -4.66% |
Related items
- 432-7013 · Riprap (MOW Strip)(4 IN) ($645.00/CY)
- 432-7001 · Riprap (Conc)(4 IN) ($515.00/CY)
- 432-7043 · Riprap (Stone Protection)(18 IN) ($189.00/CY)
- 432-7041 · Riprap (Stone Protection)(12 IN) ($185.00/CY)
- 429-7007 · Conc STR Repair (Vertical & Overhead) ($150.00/SF)
- 438-7007 · Cleaning AND Sealing Exist Joints (CL7) ($40.00/LF)
- 420-7012 · CL C Conc (Abut) ($1,250.00/CY)
- 416-7006 · Drill Shaft (36 IN) ($270.00/LF)
Is your price for item 432-7002 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.