Xit Paving and Construction Inc.: TxDOT Bid Results and Margins

Name as published by TxDOT: XIT PAVING AND CONSTRUCTION INC. · Data as published by TxDOT, lettings Mar 4, 2025 to Nov 17, 2026, retrieved Nov 24, 2026.

Proposals bid
17
Low bids (rank 1)
3
Win rate
17.65%
Low-bid value
$5.2M
Money left on table
$445K
Avg. bid vs. estimate
+0.3%

From Mar 4, 2025 to Nov 17, 2026, Xit Paving and Construction Inc. submitted 17 bids on TxDOT proposals and was the apparent low bidder on 3 of them (17.65%), with low bids totalling $5,236,634. In 3 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $444,539 (8.49% of those bids); the median gap was 8.18%. On average its bids came in 0.3% above TxDOT's engineer's estimate. Its most frequent district was Dallas (7 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2025800.0%$0
20269333.3%$5,236,634

Head-to-head rivals

BidderProposals togetherRanked ahead
Ed Bell Construction Company86 of 8
O. Trevino Construction, LLC86 of 8
Garret Shields Infrastructure63 of 6
Grey Sky Construction LLC64 of 6
Ragle Construction, Inc.54 of 5
Ti-Zack Concrete, LLC54 of 5
Cross Plus Construction, LLC40 of 4
Highway 19 Construction LLC41 of 4

Districts and work types

DistrictBids
Dallas7
Bryan2
Fort Worth2
Paris2
Tyler2
Work type of low bidsLow bids
Intersection & Operational Imprv1
Pedestrian, Sidewalks & Curb Ramps1
Safety Improvement Projects1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-04-040009-11-268DallasIcos Management, LLC$1,837,551$1,928,560+5%
2026-11-126509-36-001CollinStructural Integrity Group LLC$615,350$727,000+18.1%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-176511-02-001BrazosRoutine Maintenance Project5 of 7$936,000+23.3%+6.2%
2026-11-126509-36-001CollinRoutine Maintenance Project - Sealed2 of 6$727,000+18.1%-21.4%
2026-11-040353-01-031WiseIntersection & Operational Imprv1 of 7$482,224—-22.3%
2026-10-156507-51-001GraysonRoutine Maintenance Project - Sealed5 of 7$711,000+28.4%+12.7%
2026-10-070092-03-064EllisSafety Improvement Projects1 of 8$3,761,164—-17%
2026-09-096503-05-001CollinRoutine Maintenance Project - Sealed5 of 7$906,850+33.8%-0.1%
2026-09-020173-04-063KaufmanSafety Improvement Projects4 of 7$1,197,303+24.6%+26.1%
2026-08-050047-03-106GraysonPedestrian, Sidewalks & Curb Ramps1 of 10$993,246—-16.2%
2026-03-040195-05-013CookePedestrian, Sidewalks & Curb Ramps3 of 12$2,296,746+4.7%-19%
2025-07-010923-00-088BrownPedestrian, Sidewalks & Curb Ramps5 of 9$1,563,045+14.6%+5.5%
2025-07-011928-01-005AndersonSafety Improvement Projects8 of 10$2,381,996+45.3%-0.1%
2025-06-116477-45-001CollinRoutine Maintenance Project - Sealed4 of 6$199,910+17.4%-2.8%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.