Conc STR Repair (Vertical & Overhead) (Item 429-7007): TxDOT Unit Price History
1,826 bids · 267 bid lines · Nov 6, 2024 to Nov 19, 2026 · unit of measure SF
TxDOT 429-7007 · CONC STR REPAIR (VERTICAL & OVERHEAD) · Unit: SF
- Low bid
- $109.69/SF
- Quantity-weighted median of winning unit prices
- Weighted median
- $150.00/SF
- Quantity-weighted median of every bid
- Engineer’s estimate
- $150.00/SF
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -11.11%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 19, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 429-7007 (Conc STR Repair (Vertical & Overhead)) is measured in SF. Between Nov 6, 2024 and Nov 19, 2026, contractors entered 1,826 bids for it on 267 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 992 bids was $150.00 per SF, and the winning low bidders priced it at a weighted median of $109.69 per SF.
TxDOT's engineer's estimate for the same lines had a weighted median of $150.00 per SF, so winning bids came in 26.9% below the estimate.
By calendar year, the median bid moved from $220.00 in 2025 (853 bids) to $200.00 in 2026 (915 bids), down 9.1%. The middle half of 2026 bids fell between $150.00 and $265.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 11.11%.
Quantity matters for this item. Lines of 2 to 138 SF had a weighted median of $225.00, while lines above 720 SF had $154.00, a 32% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 259 lines where both a winning and a second-place bid were published, the median winning unit price was $185.00 against $200.00 from the second-lowest bidder, a median gap of 6.3% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 25 TxDOT districts with at least ten bids, Lubbock had the lowest weighted median ($122.00) and El Paso the highest ($278.00). The busiest district for this item was Houston.
The most recent letting with this item was on Nov 19, 2026 in Ector County, where Relmco, Inc. was the low bidder at $185.00 per SF for 1,500 SF against an estimate of $200.00.
8 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 432-7013 Riprap (MOW Strip)(4 IN) (weighted median $645.00 per CY); 432-7001 Riprap (Conc)(4 IN) (weighted median $515.00 per CY); 432-7043 Riprap (Stone Protection)(18 IN) (weighted median $189.00 per CY); 432-7002 Riprap (Conc)(5 IN) (weighted median $587.00 per CY).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 58 | 10 | $250.13 | $215.00 | $232.50 | $175.00 | $321.75 |
| 2025 | 853 | 133 | $203.75 | $185.00 | $220.00 | $160.00 | $300.00 |
| 2026 | 915 | 126 | $167.29 | $150.00 | $200.00 | $150.00 | $265.00 |
Quantity bands
| Band | Quantity (SF) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 2–138 | 619 | $287.31 | $225.00 | $177.50–$400.00 |
| Medium | 139–680 | 599 | $236.71 | $210.00 | $170.00–$281.10 |
| Large | 720–8,708 | 608 | $174.84 | $154.00 | $130.00–$220.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $185.00
- Median second-low unit price
- $200.00
- Median engineer’s estimate
- $210.00
- Median gap, second vs. low
- +6.3%
259 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 6510-75-001 · let Nov 19, 2026 · Ector County, Odessa District
Line quantity 1,500 SF · Engineer’s estimate $200.00/SF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Relmco, Inc.LOW BID | $185.00/SF | $277,500.00 | — | -7.5% | $669,750 | $33,975 (5.07%) left on table |
| 2 | Scr Civil Construction, LLC | $166.00/SF | $249,000.00 | -$28,500 | -17% | $703,725 | +$33,975 |
| 3 | Premier Contractors LLC | $210.00/SF | $315,000.00 | +$37,500 | +5% | $721,231 | +$51,481 |
| 4 | Scott Tucker Construction Company, LLC | $165.00/SF | $247,500.00 | -$30,000 | -17.5% | $912,950 | +$243,200 |
1. Relmco, Inc.
LOW BID · WINNER- Unit price
- $185.00/SF
- Extension
- $277,500.00
- Proposal total
- $669,750
- Money left on the table
- $33,975 (5.07%)
- vs. engineer’s estimate
- -7.5%
- Unit price
- $166.00/SF
- Extension
- $249,000.00
- Proposal total
- $703,725
- vs. low bid
- +$33,975
- vs. engineer’s estimate
- -17%
- Unit price
- $210.00/SF
- Extension
- $315,000.00
- Proposal total
- $721,231
- vs. low bid
- +$51,481
- vs. engineer’s estimate
- +5%
- Unit price
- $165.00/SF
- Extension
- $247,500.00
- Proposal total
- $912,950
- vs. low bid
- +$243,200
- vs. engineer’s estimate
- -17.5%
Proposal 6504-61-001 · let Nov 12, 2026 · Potter County, Amarillo District
Line quantity 317 SF · Engineer’s estimate $225.00/SF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Ti-Zack Concrete, LLCLOW BID | $170.38/SF | $54,008.88 | — | -24.3% | $734,629 | $59,414 (8.09%) left on table |
| 2 | Cross Plus Construction, LLC | $300.00/SF | $95,100.00 | +$41,091 | +33.3% | $794,043 | +$59,414 |
| 3 | Structural Integrity Group LLC | $324.00/SF | $102,708.00 | +$48,699 | +44% | $852,064 | +$117,434 |
| 4 | Pathfield Investments LLC | $280.00/SF | $88,760.00 | +$34,751 | +24.4% | $863,606 | +$128,977 |
| 5 | Scr Civil Construction, LLC | $215.00/SF | $68,155.00 | +$14,146 | -4.4% | $916,535 | +$181,906 |
| 6 | Icos Management, LLC | $126.00/SF | $39,942.00 | -$14,067 | -44% | $974,652 | +$240,023 |
| 7 | Road Doctors LLC | $120.00/SF | $38,040.00 | -$15,969 | -46.7% | $981,238 | +$246,609 |
- LOW BID · WINNER
- Unit price
- $170.38/SF
- Extension
- $54,008.88
- Proposal total
- $734,629
- Money left on the table
- $59,414 (8.09%)
- vs. engineer’s estimate
- -24.3%
- Unit price
- $300.00/SF
- Extension
- $95,100.00
- Proposal total
- $794,043
- vs. low bid
- +$59,414
- vs. engineer’s estimate
- +33.3%
- Unit price
- $324.00/SF
- Extension
- $102,708.00
- Proposal total
- $852,064
- vs. low bid
- +$117,434
- vs. engineer’s estimate
- +44%
- Unit price
- $280.00/SF
- Extension
- $88,760.00
- Proposal total
- $863,606
- vs. low bid
- +$128,977
- vs. engineer’s estimate
- +24.4%
- Unit price
- $215.00/SF
- Extension
- $68,155.00
- Proposal total
- $916,535
- vs. low bid
- +$181,906
- vs. engineer’s estimate
- -4.4%
- Unit price
- $126.00/SF
- Extension
- $39,942.00
- Proposal total
- $974,652
- vs. low bid
- +$240,023
- vs. engineer’s estimate
- -44%
- Unit price
- $120.00/SF
- Extension
- $38,040.00
- Proposal total
- $981,238
- vs. low bid
- +$246,609
- vs. engineer’s estimate
- -46.7%
Proposal 6504-77-001 · let Nov 12, 2026 · Dallas County, Dallas District
Line quantity 82 SF · Engineer’s estimate $220.00/SF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Garret Shields InfrastructureLOW BID | $200.00/SF | $16,400.00 | — | -9.1% | $237,780 | $46,978 (19.76%) left on table |
| 2 | Rear Contractors LLC | $400.00/SF | $32,800.00 | +$16,400 | +81.8% | $284,758 | +$46,978 |
| 3 | 12twelve Road and Bridge LLC | $275.00/SF | $22,550.00 | +$6,150 | +25% | $322,151 | +$84,371 |
| 4 | Gibson & Associates, Inc. | $190.00/SF | $15,580.00 | -$820.00 | -13.6% | $323,260 | +$85,480 |
| 5 | Icos Management, LLC | $157.50/SF | $12,915.00 | -$3,485 | -28.4% | $342,160 | +$104,380 |
| 6 | Road Doctors LLC | $150.00/SF | $12,300.00 | -$4,100 | -31.8% | $361,650 | +$123,870 |
1. Garret Shields Infrastructure
LOW BID · WINNER- Unit price
- $200.00/SF
- Extension
- $16,400.00
- Proposal total
- $237,780
- Money left on the table
- $46,978 (19.76%)
- vs. engineer’s estimate
- -9.1%
- Unit price
- $400.00/SF
- Extension
- $32,800.00
- Proposal total
- $284,758
- vs. low bid
- +$46,978
- vs. engineer’s estimate
- +81.8%
- Unit price
- $275.00/SF
- Extension
- $22,550.00
- Proposal total
- $322,151
- vs. low bid
- +$84,371
- vs. engineer’s estimate
- +25%
- Unit price
- $190.00/SF
- Extension
- $15,580.00
- Proposal total
- $323,260
- vs. low bid
- +$85,480
- vs. engineer’s estimate
- -13.6%
- Unit price
- $157.50/SF
- Extension
- $12,915.00
- Proposal total
- $342,160
- vs. low bid
- +$104,380
- vs. engineer’s estimate
- -28.4%
- Unit price
- $150.00/SF
- Extension
- $12,300.00
- Proposal total
- $361,650
- vs. low bid
- +$123,870
- vs. engineer’s estimate
- -31.8%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-19 | 6510-75-001 | Ector | Odessa | 1,500 | 4 | Relmco, Inc. | $185.00 | $200.00 |
| 2026-11-12 | 6504-61-001 | Potter | Amarillo | 317 | 7 | Ti-Zack Concrete, LLC | $170.38 | $225.00 |
| 2026-11-12 | 6504-77-001 | Dallas | Dallas | 82 | 6 | Garret Shields Infrastructure | $200.00 | $220.00 |
| 2026-11-12 | 6506-91-001 | Navarro | Dallas | 1,700 | 6 | Fireman Excavating, Inc. | $115.00 | $140.00 |
| 2026-11-04 | 6508-43-001 | Donley | Childress | 5,431 | 16 | Blacksmith Ventures LLC | $99.00 | $140.00 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 43.7 | 5 | Austin Bridge & Road Services, LP | $364.31 | $550.00 |
| 2026-11-03 | 0022-03-032 | Terrell | Odessa | 139 | 7 | The Truesdell Corporation | $180.00 | $231.20 |
| 2026-11-03 | 0168-09-191 | Randall | Amarillo | 2,433 | 8 | Coppell Construction Co., Inc. | $125.00 | $177.00 |
| 2026-11-03 | 6497-19-001 | Travis | Austin | 945 | 13 | Road Doctors LLC | $80.00 | $150.00 |
| 2026-11-03 | 6508-47-001 | Childress | Childress | 3,216 | 15 | Icos Management, LLC | $94.50 | $140.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 68 | $150.00 | $152.00 | $150.00 | -1.31% |
| Amarillo | 80 | $125.00 | $150.00 | $177.00 | -35.36% |
| Atlanta | 20 | $150.00 | $200.00 | $103.00 | — |
| Austin | 185 | $200.00 | $210.00 | $205.00 | -16.36% |
| Beaumont | 29 | $170.00 | $170.00 | $130.00 | -34.96% |
| Brownwood | 47 | $177.50 | $193.60 | $248.00 | -29.72% |
| Bryan | 46 | $176.00 | $221.00 | $350.00 | +63.5% |
| Childress | 75 | $99.00 | $125.00 | $140.00 | — |
| Corpus Christi | 63 | $62.00 | $175.00 | $125.00 | -24.62% |
| Dallas | 174 | $109.69 | $165.00 | $100.00 | -26.53% |
| El Paso | 52 | $248.00 | $278.00 | $260.00 | -11.11% |
| Fort Worth | 45 | $91.00 | $170.50 | $200.00 | -52.13% |
| Houston | 196 | $85.00 | $170.00 | $130.00 | -4.76% |
| Laredo | 20 | $300.00 | $252.25 | $180.00 | — |
| Lubbock | 40 | $46.40 | $122.00 | $50.00 | -39.66% |
| Lufkin | 78 | $250.00 | $220.00 | $175.00 | 0% |
| Odessa | 98 | $80.00 | $144.00 | $150.00 | -39.39% |
| Paris | 98 | $240.00 | $232.00 | $225.00 | +13.64% |
| Pharr | 23 | $180.00 | $180.00 | $110.00 | +2.5% |
| San Angelo | 59 | $85.00 | $150.00 | $90.00 | -8.65% |
| San Antonio | 97 | $350.00 | $180.00 | $293.00 | +25% |
| Tyler | 47 | $137.00 | $160.00 | $200.00 | -36.15% |
| Waco | 81 | $179.00 | $200.00 | $177.50 | +12.68% |
| Wichita Falls | 44 | $94.50 | $152.50 | $185.00 | -19.68% |
| Yoakum | 61 | $176.50 | $210.00 | $220.00 | -5.71% |
Related items
- 432-7013 · Riprap (MOW Strip)(4 IN) ($645.00/CY)
- 432-7001 · Riprap (Conc)(4 IN) ($515.00/CY)
- 432-7043 · Riprap (Stone Protection)(18 IN) ($189.00/CY)
- 432-7002 · Riprap (Conc)(5 IN) ($587.00/CY)
- 432-7041 · Riprap (Stone Protection)(12 IN) ($185.00/CY)
- 420-7012 · CL C Conc (Abut) ($1,250.00/CY)
- 438-7007 · Cleaning AND Sealing Exist Joints (CL7) ($40.00/LF)
- 416-7006 · Drill Shaft (36 IN) ($270.00/LF)
Is your price for item 429-7007 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.