Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

12twelve Road and Bridge LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: 12TWELVE ROAD AND BRIDGE LLC · Data as published by TxDOT, lettings Nov 13, 2024 to Nov 12, 2026, retrieved Nov 24, 2026.

Proposals bid
46
Low bids (rank 1)
15
Win rate
32.61%
Low-bid value
$6.1M
Money left on table
$650K
Avg. bid vs. estimate
-16.08%

From Nov 13, 2024 to Nov 12, 2026, 12twelve Road and Bridge LLC submitted 46 bids on TxDOT proposals and was the apparent low bidder on 15 of them (32.61%), with low bids totalling $6,057,421. In 15 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $650,076 (10.73% of those bids); the median gap was 10.62%. On average its bids came in 16.08% below TxDOT's engineer's estimate. Its most frequent district was Dallas (14 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20243266.7%$1,108,155
202516531.3%$2,971,890
202627829.6%$1,977,376

Head-to-head rivals

BidderProposals togetherRanked ahead
Garret Shields Infrastructure2816 of 28
Scr Civil Construction, LLC2720 of 27
Icos Management, LLC2116 of 21
Road Doctors LLC2114 of 21
Premier Contractors LLC1710 of 17
Structural Integrity Group LLC1716 of 17
Blacksmith Ventures LLC136 of 13
Macias Specialty Contracting LLC137 of 13

Districts and work types

DistrictBids
Dallas14
Paris5
Amarillo4
Corpus Christi4
Fort Worth4
Work type of low bidsLow bids
Bridge Preventative Maintenance - Sealed8
Routine Maintenance Project - Sealed4
Bridge Maintenance1
Bridge Preventative Maintenance1
Routine Maintenance Project1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-03-116489-36-001CollinBk Field Operations LLC$43,579$45,345+4.1%
2025-08-136487-92-001DallasFireman Excavating, Inc.$927,357$981,146+5.8%
2026-05-136496-05-001DentonRoad Doctors LLC$238,282$265,659+11.5%
2026-01-146486-43-001CollinGarret Shields Infrastructure$53,876$60,793+12.8%
2026-01-146486-43-001CollinGarret Shields Infrastructure$53,876$64,051+18.9%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-126504-77-001DallasBridge Preventative Maintenance3 of 6$322,151+35.5%-14%
2026-11-126508-80-001PotterBridge Preventative Maintenance - Sealed4 of 14$488,466+59.2%-20.4%
2026-10-156508-04-001HopkinsRoutine Maintenance Project - Sealed1 of 11$252,821—-33.7%
2026-09-106501-04-001KimbleBridge Preventative Maintenance1 of 10$449,985—-15.7%
2026-09-096494-80-001NavarroBridge Preventative Maintenance - Sealed5 of 5$93,950+115.4%+61.5%
2026-08-206503-73-001GraysonRoutine Maintenance Project - Sealed1 of 12$110,912—-36.1%
2026-08-116501-29-001GreggBridge Preventative Maintenance - Sealed1 of 13$133,105—-48.3%
2026-08-116501-71-001SmithBridge Preventative Maintenance - Sealed6 of 11$214,032+28%+4.8%
2026-08-060092-06-112NavarroBridge Maintenance3 of 9$508,612+5.8%-20.7%
2026-07-296498-55-001PotterBridge Preventative Maintenance - Sealed3 of 7$521,098+20%-30.1%
2026-07-226499-94-001AngelinaBridge Preventative Maintenance - Sealed1 of 8$225,584—-40.8%
2026-07-146438-94-001BrazoriaBridge Preventative Maintenance - Sealed9 of 9$699,540+85%+24.8%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.