Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Rb Contracting, LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: RB CONTRACTING, LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 10, 2026, retrieved Nov 24, 2026.

Proposals bid
22
Low bids (rank 1)
3
Win rate
13.64%
Low-bid value
$4.5M
Money left on table
$416K
Avg. bid vs. estimate
+6.03%

From Nov 6, 2024 to Nov 10, 2026, Rb Contracting, LLC submitted 22 bids on TxDOT proposals and was the apparent low bidder on 3 of them (13.64%), with low bids totalling $4,545,814. In 3 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $416,335 (9.16% of those bids); the median gap was 9.39%. On average its bids came in 6.03% above TxDOT's engineer's estimate. Its most frequent district was Paris (15 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2024100.0%$0
20255120.0%$2,294,027
202616212.5%$2,251,787

Head-to-head rivals

BidderProposals togetherRanked ahead
Thk Construction LLC163 of 16
Garret Shields Infrastructure144 of 14
Highway 19 Construction LLC124 of 12
Hodges and Son Construction Company, Inc.114 of 11
East Texas Bridge, Inc.94 of 9
Skyline Bridge LLC73 of 7
C & W Southern LLC61 of 6
Icos Management, LLC63 of 6

Districts and work types

DistrictBids
Paris15
Tyler2
Atlanta1
Bryan1
Childress1
Work type of low bidsLow bids
Bridge Replacement2
Routine Maintenance Project - Sealed1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-08-206499-90-001LamarHighway 19 Construction LLC$262,821$269,814+2.7%
2026-11-106496-11-001EctorScr Civil Construction, LLC$274,692$288,560+5.1%
2026-06-020688-03-031LamarThk Construction LLC$648,365$1,020,536+57.4%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-106496-11-001EctorRoutine Maintenance Project2 of 3$288,560+5%-5.4%
2026-11-030917-30-068BurlesonBridge Replacement14 of 15$1,079,985+49.6%+51.6%
2026-10-136505-28-001AndersonRoutine Maintenance Project - Sealed4 of 7$583,495+15.5%+10.7%
2026-09-030722-03-016Red RiverBridge Replacement6 of 8$1,699,789+15.3%-0.4%
2026-09-030901-19-198GraysonBridge Replacement1 of 8$2,130,337—-14.9%
2026-09-020427-01-042Red RiverBridge Replacement3 of 7$1,831,145+2.1%+2.7%
2026-08-206499-90-001LamarRoutine Maintenance Project - Sealed2 of 2$269,814+2.7%-7.8%
2026-08-060901-21-022FranklinBridge Replacement3 of 5$1,629,405+9.2%+6.1%
2026-08-050901-29-100LamarBridge Replacement3 of 8$977,059+22%+19.7%
2026-06-020688-03-031LamarSafety Improvement Projects2 of 5$1,020,536+57.4%+26.6%
2026-05-060901-19-212GraysonBridge Replacement9 of 10$1,350,348+68.2%+46.1%
2026-04-166498-80-001FranklinRoutine Maintenance Project - Sealed1 of 8$121,450—-52.1%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.