James Construction Group, LLC: TxDOT Bid Results and Margins
Name as published by TxDOT: JAMES CONSTRUCTION GROUP, LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 4, 2026, retrieved Nov 24, 2026.
Proposals bid
61
Low bids (rank 1)
6
Win rate
9.84%
Low-bid value
$420.4M
Money left on table
$41.1M
Avg. bid vs. estimate
+0.32%
From Nov 6, 2024 to Nov 4, 2026, James Construction Group, LLC submitted 61 bids on TxDOT proposals and was the apparent low bidder on 6 of them (9.84%), with low bids totalling $420,428,041. In 6 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $41,109,184 (9.78% of those bids); the median gap was 4.3%. On average its bids came in 0.32% above TxDOT's engineer's estimate. Its most frequent district was Waco (10 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.