Fnf Construction, Inc.: TxDOT Bid Results and Margins
Name as published by TxDOT: FNF CONSTRUCTION, INC. · Data as published by TxDOT, lettings Nov 6, 2024 to Aug 6, 2026, retrieved Nov 24, 2026.
Proposals bid
25
Low bids (rank 1)
8
Win rate
32%
Low-bid value
$370.5M
Money left on table
$43.3M
Avg. bid vs. estimate
+0.7%
From Nov 6, 2024 to Aug 6, 2026, Fnf Construction, Inc. submitted 25 bids on TxDOT proposals and was the apparent low bidder on 8 of them (32%), with low bids totalling $370,486,133. In 8 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $43,250,485 (11.67% of those bids); the median gap was 5.99%. On average its bids came in 0.7% above TxDOT's engineer's estimate. Its most frequent district was Odessa (16 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.