Ser Construction Partners, LLC: TxDOT Bid Results and Margins
Name as published by TxDOT: SER CONSTRUCTION PARTNERS, LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Sep 3, 2026, retrieved Nov 24, 2026.
Proposals bid
16
Low bids (rank 1)
6
Win rate
37.5%
Low-bid value
$301.1M
Money left on table
$13.2M
Avg. bid vs. estimate
-7.33%
From Nov 6, 2024 to Sep 3, 2026, Ser Construction Partners, LLC submitted 16 bids on TxDOT proposals and was the apparent low bidder on 6 of them (37.5%), with low bids totalling $301,133,836. In 6 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $13,219,174 (4.39% of those bids); the median gap was 3.8%. On average its bids came in 7.33% below TxDOT's engineer's estimate. Its most frequent district was Houston (13 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.