Proposals bid
37
Low bids (rank 1)
7
Win rate
18.92%
Low-bid value
$105.6M
Money left on table
$8.2M
Avg. bid vs. estimate
+9.38%
From Jan 7, 2025 to Nov 4, 2026, Foremost Paving, Inc. submitted 37 bids on TxDOT proposals and was the apparent low bidder on 7 of them (18.92%), with low bids totalling $105,596,826. In 7 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $8,169,766 (7.74% of those bids); the median gap was 6.3%. On average its bids came in 9.38% above TxDOT's engineer's estimate. Its most frequent district was Pharr (33 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.