Reim Construction, Inc.: TxDOT Bid Results and Margins
Name as published by TxDOT: REIM CONSTRUCTION, INC. · Data as published by TxDOT, lettings Jan 7, 2025 to Sep 3, 2026, retrieved Nov 24, 2026.
Proposals bid
12
Low bids (rank 1)
3
Win rate
25%
Low-bid value
$26.8M
Money left on table
$1.3M
Avg. bid vs. estimate
-6.07%
From Jan 7, 2025 to Sep 3, 2026, Reim Construction, Inc. submitted 12 bids on TxDOT proposals and was the apparent low bidder on 3 of them (25%), with low bids totalling $26,793,648. In 3 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $1,332,348 (4.97% of those bids); the median gap was 2.54%. On average its bids came in 6.07% below TxDOT's engineer's estimate. Its most frequent district was Pharr (11 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.