Tack Coat (Item 344-7077): TxDOT Unit Price History
1,434 bids · 275 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure GAL
TxDOT 344-7077 · TACK COAT · Unit: GAL
- Low bid
- $4.10/GAL
- Quantity-weighted median of winning unit prices
- Weighted median
- $4.50/GAL
- Quantity-weighted median of every bid
- Engineer’s estimate
- $4.00/GAL
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- +11.11%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 344-7077 (Tack Coat) is measured in GAL. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,434 bids for it on 275 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 772 bids was $4.50 per GAL, and the winning low bidders priced it at a weighted median of $4.10 per GAL.
TxDOT's engineer's estimate for the same lines had a weighted median of $4.00 per GAL, so winning bids came in 2.5% above the estimate.
By calendar year, the median bid moved from $4.50 in 2025 (681 bids) to $5.00 in 2026 (728 bids), up 11.1%. The middle half of 2026 bids fell between $3.84 and $7.00.
Comparing the last 12 months with the 12 months before, the median unit price rose 11.11%.
Quantity matters for this item. Lines of 6.16 to 1,540 GAL had a weighted median of $6.00, while lines above 9,091 GAL had $4.25, a 29% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 231 lines where both a winning and a second-place bid were published, the median winning unit price was $4.50 against $4.60 from the second-lowest bidder, a median gap of 0.62% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 14 TxDOT districts with at least ten bids, San Angelo had the lowest weighted median ($2.80) and Amarillo the highest ($6.00). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 4, 2026 in Wise County, where Xit Paving and Construction Inc. was the low bidder at $6.00 per GAL for 262 GAL against an estimate of $10.00.
101 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 344-7001 SP Mixes SP-B PG64-22 (weighted median $127.00 per TON); 341-7082 Tack Coat (weighted median $4.00 per GAL); 341-7001 D-GR HMA TY-B PG64-22 (weighted median $85.40 per TON); 341-7050 D-GR HMA TY-D SAC-B PG70-22 (weighted median $125.00 per TON).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 25 | 5 | $4.22 | $4.00 | $5.00 | $4.00 | $6.69 |
| 2025 | 681 | 137 | $4.31 | $4.00 | $4.50 | $3.10 | $6.50 |
| 2026 | 728 | 134 | $4.45 | $4.50 | $5.00 | $3.84 | $7.00 |
Quantity bands
| Band | Quantity (GAL) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 6.16–1,540 | 479 | $7.37 | $6.00 | $4.25–$10.00 |
| Medium | 1,557–9,080 | 477 | $4.49 | $4.20 | $3.50–$6.00 |
| Large | 9,091–170,048.11 | 478 | $4.29 | $4.25 | $3.19–$5.38 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $4.50
- Median second-low unit price
- $4.60
- Median engineer’s estimate
- $4.10
- Median gap, second vs. low
- +0.62%
231 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0353-01-031 · let Nov 4, 2026 · Wise County, Fort Worth District
Line quantity 262 GAL · Engineer’s estimate $10.00/GAL
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Xit Paving and Construction Inc.LOW BID | $6.00/GAL | $1,572.00 | — | -40% | $482,224 | $101,735 (21.1%) left on table |
| 2 | Ed Bell Construction Company | $9.00/GAL | $2,358.00 | +$786.00 | -10% | $583,959 | +$101,735 |
| 3 | O. Trevino Construction, LLC | $9.50/GAL | $2,489.00 | +$917.00 | -5% | $594,655 | +$112,431 |
| 5 | Silver Creek Construction, Inc. | $1.00/GAL | $262.00 | -$1,310 | -90% | $649,060 | +$166,836 |
| 6 | Jagoe-Public Company | $3.00/GAL | $786.00 | -$786.00 | -70% | $701,946 | +$219,722 |
| 7 | Overland Corporation | $4.00/GAL | $1,048.00 | -$524.00 | -60% | $771,411 | +$289,187 |
1. Xit Paving and Construction Inc.
LOW BID · WINNER- Unit price
- $6.00/GAL
- Extension
- $1,572.00
- Proposal total
- $482,224
- Money left on the table
- $101,735 (21.1%)
- vs. engineer’s estimate
- -40%
- Unit price
- $9.00/GAL
- Extension
- $2,358.00
- Proposal total
- $583,959
- vs. low bid
- +$101,735
- vs. engineer’s estimate
- -10%
- Unit price
- $9.50/GAL
- Extension
- $2,489.00
- Proposal total
- $594,655
- vs. low bid
- +$112,431
- vs. engineer’s estimate
- -5%
5. Silver Creek Construction, Inc.
- Unit price
- $1.00/GAL
- Extension
- $262.00
- Proposal total
- $649,060
- vs. low bid
- +$166,836
- vs. engineer’s estimate
- -90%
- Unit price
- $3.00/GAL
- Extension
- $786.00
- Proposal total
- $701,946
- vs. low bid
- +$219,722
- vs. engineer’s estimate
- -70%
7. Overland Corporation
- Unit price
- $4.00/GAL
- Extension
- $1,048.00
- Proposal total
- $771,411
- vs. low bid
- +$289,187
- vs. engineer’s estimate
- -60%
Proposal 6502-80-001 · let Nov 4, 2026 · Ellis County, Dallas District
Line quantity 524 GAL · Engineer’s estimate $5.00/GAL
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Austin Bridge & Road Services, LPLOW BID | $7.44/GAL | $3,898.56 | — | +48.8% | $1,246,988 | $112,707 (9.04%) left on table |
| 3 | Big Creek Construction, Ltd. | $5.00/GAL | $2,620.00 | -$1,279 | 0% | $1,359,695 | +$112,707 |
| 4 | Texas Materials Group, Inc. | $4.00/GAL | $2,096.00 | -$1,803 | -20% | $1,378,476 | +$131,488 |
| 5 | Peachtree Construction, Ltd. | $2.00/GAL | $1,048.00 | -$2,851 | -60% | $1,400,327 | +$153,340 |
| 6 | Icos Management, LLC | $7.85/GAL | $4,113.40 | +$214.84 | +57% | $1,434,717 | +$187,729 |
| 7 | Overland Corporation | $4.00/GAL | $2,096.00 | -$1,803 | -20% | $1,719,992 | +$473,004 |
1. Austin Bridge & Road Services, LP
LOW BID · WINNER- Unit price
- $7.44/GAL
- Extension
- $3,898.56
- Proposal total
- $1,246,988
- Money left on the table
- $112,707 (9.04%)
- vs. engineer’s estimate
- +48.8%
- Unit price
- $5.00/GAL
- Extension
- $2,620.00
- Proposal total
- $1,359,695
- vs. low bid
- +$112,707
- vs. engineer’s estimate
- 0%
- Unit price
- $4.00/GAL
- Extension
- $2,096.00
- Proposal total
- $1,378,476
- vs. low bid
- +$131,488
- vs. engineer’s estimate
- -20%
- Unit price
- $2.00/GAL
- Extension
- $1,048.00
- Proposal total
- $1,400,327
- vs. low bid
- +$153,340
- vs. engineer’s estimate
- -60%
- Unit price
- $7.85/GAL
- Extension
- $4,113.40
- Proposal total
- $1,434,717
- vs. low bid
- +$187,729
- vs. engineer’s estimate
- +57%
7. Overland Corporation
- Unit price
- $4.00/GAL
- Extension
- $2,096.00
- Proposal total
- $1,719,992
- vs. low bid
- +$473,004
- vs. engineer’s estimate
- -20%
Proposal 0168-09-191 · let Nov 3, 2026 · Randall County, Amarillo District
Line quantity 784 GAL · Engineer’s estimate $12.00/GAL
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Coppell Construction Co., Inc.LOW BID | $15.00/GAL | $11,760.00 | — | +25% | $5,800,486 | $102,633 (1.77%) left on table |
| 2 | Altus Construction LLC | $27.56/GAL | $21,607.04 | +$9,847 | +129.7% | $5,903,119 | +$102,633 |
| 3 | Gibson & Associates, Inc. | $11.00/GAL | $8,624.00 | -$3,136 | -8.3% | $5,999,365 | +$198,878 |
| 4 | The Truesdell Corporation | $12.00/GAL | $9,408.00 | -$2,352 | 0% | $6,099,099 | +$298,613 |
| 5 | Ti-Zack Concrete, LLC | $13.80/GAL | $10,819.20 | -$940.80 | +15% | $6,578,367 | +$777,881 |
| 6 | Ragle Construction, Inc. | $10.00/GAL | $7,840.00 | -$3,920 | -16.7% | $6,853,234 | +$1,052,747 |
| 7 | Gilvin-Terrill, Ltd. | $15.00/GAL | $11,760.00 | $0.000 | +25% | $7,098,974 | +$1,298,488 |
| 8 | Thk Construction LLC | $15.00/GAL | $11,760.00 | $0.000 | +25% | $7,169,258 | +$1,368,772 |
1. Coppell Construction Co., Inc.
LOW BID · WINNER- Unit price
- $15.00/GAL
- Extension
- $11,760.00
- Proposal total
- $5,800,486
- Money left on the table
- $102,633 (1.77%)
- vs. engineer’s estimate
- +25%
- Unit price
- $27.56/GAL
- Extension
- $21,607.04
- Proposal total
- $5,903,119
- vs. low bid
- +$102,633
- vs. engineer’s estimate
- +129.7%
- Unit price
- $11.00/GAL
- Extension
- $8,624.00
- Proposal total
- $5,999,365
- vs. low bid
- +$198,878
- vs. engineer’s estimate
- -8.3%
- Unit price
- $12.00/GAL
- Extension
- $9,408.00
- Proposal total
- $6,099,099
- vs. low bid
- +$298,613
- vs. engineer’s estimate
- 0%
- Unit price
- $13.80/GAL
- Extension
- $10,819.20
- Proposal total
- $6,578,367
- vs. low bid
- +$777,881
- vs. engineer’s estimate
- +15%
- Unit price
- $10.00/GAL
- Extension
- $7,840.00
- Proposal total
- $6,853,234
- vs. low bid
- +$1,052,747
- vs. engineer’s estimate
- -16.7%
- Unit price
- $15.00/GAL
- Extension
- $11,760.00
- Proposal total
- $7,098,974
- vs. low bid
- +$1,298,488
- vs. engineer’s estimate
- +25%
- Unit price
- $15.00/GAL
- Extension
- $11,760.00
- Proposal total
- $7,169,258
- vs. low bid
- +$1,368,772
- vs. engineer’s estimate
- +25%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0353-01-031 | Wise | Fort Worth | 262 | 6 | Xit Paving and Construction Inc. | $6.00 | $10.00 |
| 2026-11-04 | 0947-03-034 | Jasper | Beaumont | 3,123 | 2 | Texas Materials Group, Inc. | $5.25 | $5.50 |
| 2026-11-04 | 6502-80-001 | Ellis | Dallas | 524 | 6 | Austin Bridge & Road Services, LP | $7.44 | $5.00 |
| 2026-11-03 | 0168-09-191 | Randall | Amarillo | 784 | 8 | Coppell Construction Co., Inc. | $15.00 | $12.00 |
| 2026-11-03 | 0917-30-068 | Burleson | Bryan | 104 | 14 | C & W Southern LLC | $30.00 | $8.00 |
| 2026-10-14 | 6493-19-001 | Dallas | Dallas | 2,364 | 6 | Texas Materials Group, Inc. | $1.00 | $3.50 |
| 2026-10-07 | 0092-05-058 | Ellis | Dallas | 4,837 | 1 | Clark Construction of Texas, Inc. | $1.00 | $2.75 |
| 2026-10-07 | 6504-96-001 | Erath | Fort Worth | 6,505 | 3 | Northeastern Pavers, LLC | $4.00 | $2.78 |
| 2026-10-06 | 0009-11-248 | Dallas | Dallas | 97 | 7 | Ragle Construction, Inc. | $12.00 | $5.00 |
| 2026-10-06 | 0095-03-100 | Kaufman | Dallas | 12,324 | 10 | Highway 19 Construction LLC | $5.00 | $4.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 76 | $4.50 | $4.64 | $3.20 | 0% |
| Amarillo | 64 | $5.90 | $6.00 | $6.00 | -21.72% |
| Atlanta | 82 | $4.69 | $5.00 | $4.00 | -29.97% |
| Beaumont | 44 | $5.00 | $4.13 | $4.00 | — |
| Bryan | 148 | $3.50 | $4.00 | $4.10 | +5% |
| Childress | 8 | $4.80 | $4.85 | $6.00 | — |
| Dallas | 424 | $2.75 | $4.00 | $4.00 | +15% |
| El Paso | 5 | $7.00 | $7.00 | $6.00 | — |
| Fort Worth | 218 | $2.50 | $3.50 | $1.62 | +14.75% |
| Houston | 67 | $3.00 | $4.73 | $3.71 | +21.88% |
| Laredo | 5 | $5.00 | $5.00 | $2.87 | — |
| Lubbock | 11 | $4.50 | $5.50 | $4.50 | — |
| Odessa | 62 | $4.11 | $4.50 | $5.00 | +5.88% |
| Paris | 26 | $4.90 | $4.60 | $3.90 | -29.23% |
| San Angelo | 19 | $2.80 | $2.80 | $3.50 | — |
| San Antonio | 3 | $3.25 | $3.25 | $1.25 | — |
| Tyler | 120 | $4.20 | $4.50 | $5.00 | +11.11% |
| Waco | 43 | $1.50 | $2.95 | $4.00 | +14.29% |
| Wichita Falls | 9 | $1.00 | $4.00 | $3.50 | — |
Related items
- 344-7001 · SP Mixes SP-B PG64-22 ($127.00/TON)
- 341-7082 · Tack Coat ($4.00/GAL)
- 341-7001 · D-GR HMA TY-B PG64-22 ($85.40/TON)
- 341-7050 · D-GR HMA TY-D SAC-B PG70-22 ($125.00/TON)
- 400-7010 · CEM Stabil Bkfl ($133.66/CY)
- 401-7001 · Flowable Backfill ($231.39/CY)
- 402-7001 · Trench Excavation Protection ($4.65/LF)
- 403-7001 · Temporary SPL Shoring ($31.39/SF)
Is your price for item 344-7077 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.