Clark Construction of Texas, Inc.: TxDOT Bid Results and Margins
Name as published by TxDOT: CLARK CONSTRUCTION OF TEXAS, INC. · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 4, 2026, retrieved Nov 24, 2026.
Proposals bid
116
Low bids (rank 1)
33
Win rate
28.45%
Low-bid value
$261M
Money left on table
$16.4M
Avg. bid vs. estimate
+0.33%
From Nov 6, 2024 to Nov 4, 2026, Clark Construction of Texas, Inc. submitted 116 bids on TxDOT proposals and was the apparent low bidder on 33 of them (28.45%), with low bids totalling $260,973,909. In 31 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $16,433,905 (7.17% of those bids); the median gap was 3.55%. On average its bids came in 0.33% above TxDOT's engineer's estimate. Its most frequent district was San Antonio (37 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.