Ronald R. Wagner & Co., LP: TxDOT Bid Results and Margins
Name as published by TxDOT: RONALD R. WAGNER & CO., LP · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 4, 2026, retrieved Nov 24, 2026.
Proposals bid
57
Low bids (rank 1)
25
Win rate
43.86%
Low-bid value
$231.9M
Money left on table
$12.3M
Avg. bid vs. estimate
-0.34%
From Nov 6, 2024 to Nov 4, 2026, Ronald R. Wagner & Co., LP submitted 57 bids on TxDOT proposals and was the apparent low bidder on 25 of them (43.86%), with low bids totalling $231,925,778. In 25 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $12,252,379 (5.28% of those bids); the median gap was 4.72%. On average its bids came in 0.34% below TxDOT's engineer's estimate. Its most frequent district was Brownwood (6 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.