D-GR HMA TY-D SAC-B PG70-22 (Item 341-7050): TxDOT Unit Price History
396 bids · 65 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure TON
TxDOT 341-7050 · D-GR HMA TY-D SAC-B PG70-22 · Unit: TON
- Low bid
- $105.60/TON
- Quantity-weighted median of winning unit prices
- Weighted median
- $125.00/TON
- Quantity-weighted median of every bid
- Engineer’s estimate
- $110.00/TON
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- +7.52%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 341-7050 (D-GR HMA TY-D SAC-B PG70-22) is measured in TON. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 396 bids for it on 65 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 243 bids was $125.00 per TON, and the winning low bidders priced it at a weighted median of $105.60 per TON.
TxDOT's engineer's estimate for the same lines had a weighted median of $110.00 per TON, so winning bids came in 4.0% below the estimate.
By calendar year, the median bid moved from $150.38 in 2025 (175 bids) to $157.00 in 2026 (214 bids), up 4.4%. The middle half of 2026 bids fell between $129.28 and $200.00.
Comparing the last 12 months with the 12 months before, the median unit price rose 7.52%.
Quantity matters for this item. Lines of 21 to 598 TON had a weighted median of $200.00, while lines above 4,292 TON had $120.00, a 40% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 64 lines where both a winning and a second-place bid were published, the median winning unit price was $130.00 against $130.65 from the second-lowest bidder, a median gap of -2.76% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 4 TxDOT districts with at least ten bids, Corpus Christi had the lowest weighted median ($114.00) and Houston the highest ($163.00). The busiest district for this item was Yoakum.
The most recent letting with this item was on Nov 4, 2026 in Haskell County, where Lone Star Paving Company was the low bidder at $127.00 per TON for 9,727 TON against an estimate of $119.62.
1 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 341-7082 Tack Coat (weighted median $4.00 per GAL); 341-7001 D-GR HMA TY-B PG64-22 (weighted median $85.40 per TON); 344-7077 Tack Coat (weighted median $4.50 per GAL); 344-7001 SP Mixes SP-B PG64-22 (weighted median $127.00 per TON).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 7 | 1 | $169.28 | $167.00 | $167.00 | $144.93 | $192.50 |
| 2025 | 175 | 30 | $128.84 | $124.65 | $150.38 | $125.20 | $187.62 |
| 2026 | 214 | 34 | $128.97 | $125.00 | $157.00 | $129.28 | $200.00 |
Quantity bands
| Band | Quantity (TON) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 21–598 | 136 | $220.36 | $200.00 | $180.00–$287.00 |
| Medium | 648–4,093 | 128 | $147.38 | $144.00 | $129.07–$170.00 |
| Large | 4,292–45,822 | 132 | $124.55 | $120.00 | $114.30–$145.25 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $130.00
- Median second-low unit price
- $130.65
- Median engineer’s estimate
- $122.00
- Median gap, second vs. low
- +-2.76%
64 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0157-04-058 · let Nov 4, 2026 · Haskell County, Abilene District
Line quantity 9,727 TON · Engineer’s estimate $119.62/TON
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Lone Star Paving CompanyLOW BID | $127.00/TON | $1,235,329.00 | — | +6.2% | $6,732,215 | $1,063,968 (15.8%) left on table |
| 2 | Rk Hall, LLC | $131.50/TON | $1,279,100.50 | +$43,772 | +9.9% | $7,796,183 | +$1,063,968 |
| 3 | Zack Burkett Co. | $140.00/TON | $1,361,780.00 | +$126,451 | +17% | $7,966,171 | +$1,233,956 |
| 4 | Foutsco Paving Company, LLC | $140.00/TON | $1,361,780.00 | +$126,451 | +17% | $8,000,580 | +$1,268,365 |
| 5 | Nobles Road Construction, Inc. | $149.00/TON | $1,449,323.00 | +$213,994 | +24.6% | $8,307,427 | +$1,575,212 |
| 6 | Ck Newberry, LLC | $138.00/TON | $1,342,326.00 | +$106,997 | +15.4% | $8,389,000 | +$1,656,785 |
| 7 | Reece Albert, Inc. | $161.04/TON | $1,566,436.08 | +$331,107 | +34.6% | $8,534,153 | +$1,801,938 |
| 8 | Texas Materials Group, Inc. | $155.00/TON | $1,507,685.00 | +$272,356 | +29.6% | $8,617,318 | +$1,885,103 |
| 9 | A. L. Helmcamp, Inc. | $156.00/TON | $1,517,412.00 | +$282,083 | +30.4% | $9,257,856 | +$2,525,641 |
- LOW BID · WINNER
- Unit price
- $127.00/TON
- Extension
- $1,235,329.00
- Proposal total
- $6,732,215
- Money left on the table
- $1,063,968 (15.8%)
- vs. engineer’s estimate
- +6.2%
2. Rk Hall, LLC
- Unit price
- $131.50/TON
- Extension
- $1,279,100.50
- Proposal total
- $7,796,183
- vs. low bid
- +$1,063,968
- vs. engineer’s estimate
- +9.9%
- Unit price
- $140.00/TON
- Extension
- $1,361,780.00
- Proposal total
- $7,966,171
- vs. low bid
- +$1,233,956
- vs. engineer’s estimate
- +17%
- Unit price
- $140.00/TON
- Extension
- $1,361,780.00
- Proposal total
- $8,000,580
- vs. low bid
- +$1,268,365
- vs. engineer’s estimate
- +17%
5. Nobles Road Construction, Inc.
- Unit price
- $149.00/TON
- Extension
- $1,449,323.00
- Proposal total
- $8,307,427
- vs. low bid
- +$1,575,212
- vs. engineer’s estimate
- +24.6%
- Unit price
- $138.00/TON
- Extension
- $1,342,326.00
- Proposal total
- $8,389,000
- vs. low bid
- +$1,656,785
- vs. engineer’s estimate
- +15.4%
- Unit price
- $161.04/TON
- Extension
- $1,566,436.08
- Proposal total
- $8,534,153
- vs. low bid
- +$1,801,938
- vs. engineer’s estimate
- +34.6%
- Unit price
- $155.00/TON
- Extension
- $1,507,685.00
- Proposal total
- $8,617,318
- vs. low bid
- +$1,885,103
- vs. engineer’s estimate
- +29.6%
- Unit price
- $156.00/TON
- Extension
- $1,517,412.00
- Proposal total
- $9,257,856
- vs. low bid
- +$2,525,641
- vs. engineer’s estimate
- +30.4%
Proposal 1052-02-098 · let Nov 4, 2026 · Nueces County, Corpus Christi District
Line quantity 3,622 TON · Engineer’s estimate $115.00/TON
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | J E Construction Services, LLCLOW BID | $132.00/TON | $478,104.00 | — | +14.8% | $3,833,265 | $3,958 (0.1%) left on table |
| 2 | Anderson Columbia Co., Inc. | $122.00/TON | $441,884.00 | -$36,220 | +6.1% | $3,837,222 | +$3,958 |
| 3 | Ck Newberry, LLC | $126.00/TON | $456,372.00 | -$21,732 | +9.6% | $4,616,801 | +$783,537 |
| 4 | Stx Civil | $126.50/TON | $458,183.00 | -$19,921 | +10% | $4,817,402 | +$984,137 |
| 5 | Texas Materials Group, Inc. | $140.00/TON | $507,080.00 | +$28,976 | +21.7% | $4,943,316 | +$1,110,051 |
1. J E Construction Services, LLC
LOW BID · WINNER- Unit price
- $132.00/TON
- Extension
- $478,104.00
- Proposal total
- $3,833,265
- Money left on the table
- $3,958 (0.1%)
- vs. engineer’s estimate
- +14.8%
- Unit price
- $122.00/TON
- Extension
- $441,884.00
- Proposal total
- $3,837,222
- vs. low bid
- +$3,958
- vs. engineer’s estimate
- +6.1%
- Unit price
- $126.00/TON
- Extension
- $456,372.00
- Proposal total
- $4,616,801
- vs. low bid
- +$783,537
- vs. engineer’s estimate
- +9.6%
4. Stx Civil
- Unit price
- $126.50/TON
- Extension
- $458,183.00
- Proposal total
- $4,817,402
- vs. low bid
- +$984,137
- vs. engineer’s estimate
- +10%
- Unit price
- $140.00/TON
- Extension
- $507,080.00
- Proposal total
- $4,943,316
- vs. low bid
- +$1,110,051
- vs. engineer’s estimate
- +21.7%
Proposal 0616-01-020 · let Nov 3, 2026 · San Patricio County, Corpus Christi District
Line quantity 2,894 TON · Engineer’s estimate $110.00/TON
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Lcr Total Transport LLCLOW BID | $130.00/TON | $376,220.00 | — | +18.2% | $470,959 | $25,933 (5.51%) left on table |
| 2 | Ck Newberry, LLC | $117.00/TON | $338,598.00 | -$37,622 | +6.4% | $496,892 | +$25,933 |
| 3 | Brooke Paving and Construction LLC | $128.50/TON | $371,879.00 | -$4,341 | +16.8% | $505,700 | +$34,742 |
| 4 | Anderson Columbia Co., Inc. | $145.00/TON | $419,630.00 | +$43,410 | +31.8% | $572,874 | +$101,916 |
| 5 | Tex-Mix Paving, LLC | $167.00/TON | $483,298.00 | +$107,078 | +51.8% | $612,843 | +$141,885 |
| 6 | J E Construction Services, LLC | $153.00/TON | $442,782.00 | +$66,562 | +39.1% | $673,769 | +$202,811 |
| 7 | Texas Materials Group, Inc. | $203.20/TON | $588,060.80 | +$211,841 | +84.7% | $967,550 | +$496,592 |
1. Lcr Total Transport LLC
LOW BID · WINNER- Unit price
- $130.00/TON
- Extension
- $376,220.00
- Proposal total
- $470,959
- Money left on the table
- $25,933 (5.51%)
- vs. engineer’s estimate
- +18.2%
- Unit price
- $117.00/TON
- Extension
- $338,598.00
- Proposal total
- $496,892
- vs. low bid
- +$25,933
- vs. engineer’s estimate
- +6.4%
3. Brooke Paving and Construction LLC
- Unit price
- $128.50/TON
- Extension
- $371,879.00
- Proposal total
- $505,700
- vs. low bid
- +$34,742
- vs. engineer’s estimate
- +16.8%
- Unit price
- $145.00/TON
- Extension
- $419,630.00
- Proposal total
- $572,874
- vs. low bid
- +$101,916
- vs. engineer’s estimate
- +31.8%
5. Tex-Mix Paving, LLC
- Unit price
- $167.00/TON
- Extension
- $483,298.00
- Proposal total
- $612,843
- vs. low bid
- +$141,885
- vs. engineer’s estimate
- +51.8%
6. J E Construction Services, LLC
- Unit price
- $153.00/TON
- Extension
- $442,782.00
- Proposal total
- $673,769
- vs. low bid
- +$202,811
- vs. engineer’s estimate
- +39.1%
- Unit price
- $203.20/TON
- Extension
- $588,060.80
- Proposal total
- $967,550
- vs. low bid
- +$496,592
- vs. engineer’s estimate
- +84.7%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0157-04-058 | Haskell | Abilene | 9,727 | 9 | Lone Star Paving Company | $127.00 | $119.62 |
| 2026-11-04 | 1052-02-098 | Nueces | Corpus Christi | 3,622 | 5 | J E Construction Services, LLC | $132.00 | $115.00 |
| 2026-11-03 | 0616-01-020 | San Patricio | Corpus Christi | 2,894 | 7 | Lcr Total Transport LLC | $130.00 | $110.00 |
| 2026-10-06 | 1122-01-034 | Karnes | Corpus Christi | 25,617 | 7 | Ck Newberry, LLC | $98.00 | $90.00 |
| 2026-08-06 | 0420-01-051 | Jackson | Yoakum | 4,444 | 3 | Stx Civil | $118.44 | $125.00 |
| 2026-08-06 | 0842-03-037 | Victoria | Yoakum | 44,677 | 3 | Ck Newberry, LLC | $90.00 | $130.00 |
| 2026-08-05 | 0089-07-166 | Wharton | Yoakum | 25,700 | 3 | Williams Brothers Construction Co., Inc. | $139.00 | $130.00 |
| 2026-08-05 | 1756-01-024 | Jackson | Yoakum | 5,302 | 3 | Clark Construction of Texas, Inc. | $109.53 | $95.00 |
| 2026-07-21 | 6502-52-001 | Nueces | Corpus Christi | 3,017 | 4 | Texas Materials Group, Inc. | $125.00 | $122.00 |
| 2026-07-02 | 0266-04-053 | Colorado | Yoakum | 133 | 9 | 3lw Civil LLC | $331.25 | $112.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 19 | $125.00 | $149.00 | $107.56 | — |
| Beaumont | 7 | $167.00 | $167.00 | $175.00 | — |
| Corpus Christi | 139 | $98.00 | $114.00 | $105.00 | +2.21% |
| Houston | 33 | $146.50 | $163.00 | $135.00 | — |
| Yoakum | 198 | $102.43 | $139.00 | $130.00 | +3.18% |
Related items
- 341-7082 · Tack Coat ($4.00/GAL)
- 341-7001 · D-GR HMA TY-B PG64-22 ($85.40/TON)
- 344-7077 · Tack Coat ($4.50/GAL)
- 344-7001 · SP Mixes SP-B PG64-22 ($127.00/TON)
- 400-7010 · CEM Stabil Bkfl ($133.66/CY)
- 401-7001 · Flowable Backfill ($231.39/CY)
- 402-7001 · Trench Excavation Protection ($4.65/LF)
- 403-7001 · Temporary SPL Shoring ($31.39/SF)
Is your price for item 341-7050 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.