Prefab PM TY C (W)(Word) (Item 668-7103): TxDOT Unit Price History
1,962 bids · 427 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure EA
TxDOT 668-7103 · PREFAB PM TY C (W)(WORD) · Unit: EA
- Low bid
- $233.37/EA
- Quantity-weighted median of winning unit prices
- Weighted median
- $250.00/EA
- Quantity-weighted median of every bid
- Engineer’s estimate
- $250.00/EA
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -3.33%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 668-7103 (Prefab PM TY C (W)(Word)) is measured in EA. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,962 bids for it on 427 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,057 bids was $250.00 per EA, and the winning low bidders priced it at a weighted median of $233.37 per EA.
TxDOT's engineer's estimate for the same lines had a weighted median of $250.00 per EA, so winning bids came in 6.7% below the estimate.
By calendar year, the median bid moved from $300.00 in 2025 (898 bids) to $291.50 in 2026 (969 bids), a change small enough to sit within normal bid-to-bid variation. The middle half of 2026 bids fell between $250.00 and $345.08.
Comparing the last 12 months with the 12 months before, the median unit price fell 3.33%.
Quantity matters for this item. Lines of 1 to 6 EA had a weighted median of $330.00, while lines above 26 EA had $250.00, a 24% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 415 lines where both a winning and a second-place bid were published, the median winning unit price was $295.00 against $290.00 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 21 TxDOT districts with at least ten bids, Corpus Christi had the lowest weighted median ($190.00) and Paris the highest ($637.50). The busiest district for this item was Houston.
The most recent letting with this item was on Nov 4, 2026 in Colorado County, where Ronald R. Wagner & Co., LP was the low bidder at $220.00 per EA for 63 EA against an estimate of $250.00.
11 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 668-7091 Prefab PM TY C (W)(Arrow) (weighted median $200.00 per EA); 668-7089 Prefab PM TY C (W)(24")(SLD) (weighted median $13.00 per LF); 666-7024 Refl PAV MRK TY I (W)8"(SLD)(100MIL) (weighted median $0.850 per LF); 666-7423 Refl PAV MRK TY I (Y)6"(SLD)(100MIL) (weighted median $0.450 per LF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 95 | 23 | $283.03 | $254.34 | $330.00 | $250.00 | $398.45 |
| 2025 | 898 | 199 | $278.36 | $260.00 | $300.00 | $251.29 | $375.00 |
| 2026 | 969 | 205 | $257.97 | $250.00 | $291.50 | $250.00 | $345.08 |
Quantity bands
| Band | Quantity (EA) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 1–6 | 672 | $350.57 | $330.00 | $280.00–$400.00 |
| Medium | 7–25 | 640 | $318.78 | $300.00 | $260.00–$356.25 |
| Large | 26–610 | 650 | $259.79 | $250.00 | $226.41–$300.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $295.00
- Median second-low unit price
- $290.00
- Median engineer’s estimate
- $290.00
- Median gap, second vs. low
- +0%
415 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 0027-03-077 · let Nov 4, 2026 · Colorado County, Yoakum District
Line quantity 63 EA · Engineer’s estimate $250.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Ronald R. Wagner & Co., LPLOW BID | $220.00/EA | $13,860.00 | — | -12% | $17,597,090 | $20,400 (0.12%) left on table |
| 2 | Clark Construction of Texas, Inc. | $225.00/EA | $14,175.00 | +$315.00 | -10% | $17,617,490 | +$20,400 |
| 3 | Ck Newberry, LLC | $250.00/EA | $15,750.00 | +$1,890 | 0% | $19,218,375 | +$1,621,285 |
| 4 | Hayden Paving, Inc. | $260.00/EA | $16,380.00 | +$2,520 | +4% | $19,937,821 | +$2,340,731 |
- LOW BID · WINNER
- Unit price
- $220.00/EA
- Extension
- $13,860.00
- Proposal total
- $17,597,090
- Money left on the table
- $20,400 (0.12%)
- vs. engineer’s estimate
- -12%
- Unit price
- $225.00/EA
- Extension
- $14,175.00
- Proposal total
- $17,617,490
- vs. low bid
- +$20,400
- vs. engineer’s estimate
- -10%
- Unit price
- $250.00/EA
- Extension
- $15,750.00
- Proposal total
- $19,218,375
- vs. low bid
- +$1,621,285
- vs. engineer’s estimate
- 0%
4. Hayden Paving, Inc.
- Unit price
- $260.00/EA
- Extension
- $16,380.00
- Proposal total
- $19,937,821
- vs. low bid
- +$2,340,731
- vs. engineer’s estimate
- +4%
Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District
Line quantity 55 EA · Engineer’s estimate $260.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Mario Sinacola & Sons Excavating, Inc.LOW BID | $270.00/EA | $14,850.00 | — | +3.8% | $35,766,135 | $890,797 (2.49%) left on table |
| 2 | Ed Bell Construction Company | $300.30/EA | $16,516.50 | +$1,667 | +15.5% | $36,656,931 | +$890,797 |
| 3 | Tiseo Paving Company, LLC | $302.00/EA | $16,610.00 | +$1,760 | +16.2% | $38,169,956 | +$2,403,821 |
| 4 | Harper Brothers Construction LLC | $215.00/EA | $11,825.00 | -$3,025 | -17.3% | $40,441,503 | +$4,675,368 |
1. Mario Sinacola & Sons Excavating, Inc.
LOW BID · WINNER- Unit price
- $270.00/EA
- Extension
- $14,850.00
- Proposal total
- $35,766,135
- Money left on the table
- $890,797 (2.49%)
- vs. engineer’s estimate
- +3.8%
- Unit price
- $300.30/EA
- Extension
- $16,516.50
- Proposal total
- $36,656,931
- vs. low bid
- +$890,797
- vs. engineer’s estimate
- +15.5%
3. Tiseo Paving Company, LLC
- Unit price
- $302.00/EA
- Extension
- $16,610.00
- Proposal total
- $38,169,956
- vs. low bid
- +$2,403,821
- vs. engineer’s estimate
- +16.2%
4. Harper Brothers Construction LLC
- Unit price
- $215.00/EA
- Extension
- $11,825.00
- Proposal total
- $40,441,503
- vs. low bid
- +$4,675,368
- vs. engineer’s estimate
- -17.3%
Proposal 0157-04-058 · let Nov 4, 2026 · Haskell County, Abilene District
Line quantity 6 EA · Engineer’s estimate $380.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Lone Star Paving CompanyLOW BID | $250.00/EA | $1,500.00 | — | -34.2% | $6,732,215 | $1,063,968 (15.8%) left on table |
| 2 | Rk Hall, LLC | $265.00/EA | $1,590.00 | +$90.00 | -30.3% | $7,796,183 | +$1,063,968 |
| 3 | Zack Burkett Co. | $300.65/EA | $1,803.90 | +$303.90 | -20.9% | $7,966,171 | +$1,233,956 |
| 4 | Foutsco Paving Company, LLC | $250.00/EA | $1,500.00 | $0.000 | -34.2% | $8,000,580 | +$1,268,365 |
| 5 | Nobles Road Construction, Inc. | $260.00/EA | $1,560.00 | +$60.00 | -31.6% | $8,307,427 | +$1,575,212 |
| 6 | Ck Newberry, LLC | $350.00/EA | $2,100.00 | +$600.00 | -7.9% | $8,389,000 | +$1,656,785 |
| 7 | Reece Albert, Inc. | $335.67/EA | $2,014.02 | +$514.02 | -11.7% | $8,534,153 | +$1,801,938 |
| 8 | Texas Materials Group, Inc. | $250.00/EA | $1,500.00 | $0.000 | -34.2% | $8,617,318 | +$1,885,103 |
| 9 | A. L. Helmcamp, Inc. | $340.00/EA | $2,040.00 | +$540.00 | -10.5% | $9,257,856 | +$2,525,641 |
- LOW BID · WINNER
- Unit price
- $250.00/EA
- Extension
- $1,500.00
- Proposal total
- $6,732,215
- Money left on the table
- $1,063,968 (15.8%)
- vs. engineer’s estimate
- -34.2%
2. Rk Hall, LLC
- Unit price
- $265.00/EA
- Extension
- $1,590.00
- Proposal total
- $7,796,183
- vs. low bid
- +$1,063,968
- vs. engineer’s estimate
- -30.3%
- Unit price
- $300.65/EA
- Extension
- $1,803.90
- Proposal total
- $7,966,171
- vs. low bid
- +$1,233,956
- vs. engineer’s estimate
- -20.9%
- Unit price
- $250.00/EA
- Extension
- $1,500.00
- Proposal total
- $8,000,580
- vs. low bid
- +$1,268,365
- vs. engineer’s estimate
- -34.2%
5. Nobles Road Construction, Inc.
- Unit price
- $260.00/EA
- Extension
- $1,560.00
- Proposal total
- $8,307,427
- vs. low bid
- +$1,575,212
- vs. engineer’s estimate
- -31.6%
- Unit price
- $350.00/EA
- Extension
- $2,100.00
- Proposal total
- $8,389,000
- vs. low bid
- +$1,656,785
- vs. engineer’s estimate
- -7.9%
- Unit price
- $335.67/EA
- Extension
- $2,014.02
- Proposal total
- $8,534,153
- vs. low bid
- +$1,801,938
- vs. engineer’s estimate
- -11.7%
- Unit price
- $250.00/EA
- Extension
- $1,500.00
- Proposal total
- $8,617,318
- vs. low bid
- +$1,885,103
- vs. engineer’s estimate
- -34.2%
- Unit price
- $340.00/EA
- Extension
- $2,040.00
- Proposal total
- $9,257,856
- vs. low bid
- +$2,525,641
- vs. engineer’s estimate
- -10.5%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-04 | 0027-03-077 | Colorado | Yoakum | 63 | 4 | Ronald R. Wagner & Co., LP | $220.00 | $250.00 |
| 2026-11-04 | 0047-04-032 | Collin | Dallas | 55 | 4 | Mario Sinacola & Sons Excavating, Inc. | $270.00 | $260.00 |
| 2026-11-04 | 0066-03-045 | Sherman | Amarillo | 109 | 2 | Breedon Investments USA Inc. | $225.00 | $250.00 |
| 2026-11-04 | 0157-04-058 | Haskell | Abilene | 6 | 9 | Lone Star Paving Company | $250.00 | $380.00 |
| 2026-11-04 | 1052-02-098 | Nueces | Corpus Christi | 2 | 5 | J E Construction Services, LLC | $240.00 | $250.00 |
| 2026-11-04 | 6510-36-001 | Hill | Waco | 22 | 3 | Big Creek Construction, Ltd. | $350.00 | $300.00 |
| 2026-11-04 | 6510-39-001 | Bell | Waco | 10 | 3 | Texas Materials Group, Inc. | $300.00 | $450.00 |
| 2026-11-03 | 0044-06-079 | Montague | Wichita Falls | 130 | 6 | Breedon Investments USA Inc. | $200.00 | $250.00 |
| 2026-11-03 | 0059-05-048 | Shelby | Lufkin | 37 | 5 | Clark Construction of Texas, Inc. | $210.00 | $55.00 |
| 2026-11-03 | 0220-01-038 | Hidalgo | Pharr | 87 | 2 | Foremost Paving, Inc. | $227.25 | $218.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 84 | $358.00 | $325.00 | $380.00 | -10.62% |
| Amarillo | 42 | $225.00 | $225.00 | $250.00 | -7.43% |
| Atlanta | 86 | $210.00 | $245.00 | $250.00 | -18.11% |
| Beaumont | 114 | $250.00 | $250.00 | $295.20 | -6.67% |
| Brownwood | 45 | $260.00 | $251.00 | $265.83 | -23.59% |
| Bryan | 95 | $210.00 | $250.00 | $252.00 | -9.77% |
| Childress | 9 | $215.00 | $306.00 | $300.00 | — |
| Corpus Christi | 122 | $185.00 | $190.00 | $200.00 | +8.6% |
| Dallas | 104 | $255.00 | $300.30 | $300.00 | -10.41% |
| El Paso | 2 | $275.00 | $337.50 | $400.00 | — |
| Fort Worth | 39 | $225.00 | $225.00 | $246.85 | -10.86% |
| Houston | 269 | $265.00 | $265.00 | $285.00 | -17.99% |
| Lubbock | 30 | $250.00 | $299.00 | $250.00 | -16.8% |
| Lufkin | 65 | $281.00 | $262.65 | $250.00 | -4.97% |
| Odessa | 116 | $260.00 | $260.00 | $250.00 | -14.77% |
| Paris | 11 | $500.00 | $637.50 | $275.00 | — |
| Pharr | 168 | $227.25 | $233.37 | $220.94 | +9.17% |
| San Angelo | 23 | $220.00 | $242.00 | $300.00 | -27.86% |
| San Antonio | 73 | $300.00 | $225.00 | $200.00 | -3.72% |
| Tyler | 150 | $220.00 | $240.00 | $250.00 | -0.15% |
| Waco | 153 | $200.00 | $245.00 | $270.70 | +10.56% |
| Wichita Falls | 63 | $200.00 | $232.40 | $250.00 | +2.59% |
| Yoakum | 99 | $275.00 | $260.00 | $265.00 | +4.08% |
Related items
- 668-7091 · Prefab PM TY C (W)(Arrow) ($200.00/EA)
- 668-7089 · Prefab PM TY C (W)(24")(SLD) ($13.00/LF)
- 666-7024 · Refl PAV MRK TY I (W)8"(SLD)(100MIL) ($0.850/LF)
- 666-7423 · Refl PAV MRK TY I (Y)6"(SLD)(100MIL) ($0.450/LF)
- 666-7036 · Refl PAV MRK TY I (W)24"(SLD)(100MIL) ($7.00/LF)
- 666-7411 · Refl PAV MRK TY I (W)6"(SLD)(100MIL) ($0.450/LF)
- 666-7408 · Refl PAV MRK TY I (W)6"(BRK)(100MIL) ($0.520/LF)
- 666-7347 · Pavement Sler 6" ($0.190/LF)
Is your price for item 668-7103 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.