Prefab PM TY C (W)(Arrow) (Item 668-7091): TxDOT Unit Price History

2,072 bids · 447 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure EA

TxDOT 668-7091 · PREFAB PM TY C (W)(ARROW) · Unit: EA

Low bid
$190.00/EA
Quantity-weighted median of winning unit prices
Weighted median
$200.00/EA
Quantity-weighted median of every bid
Engineer’s estimate
$205.00/EA
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-4%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$200.00$300.00$400.001101001KQuantity (EA), log scaleUnit price ($/EA)
Winning (low) bid Other bid Fitted price curve (ln price = 5.73 − 0.083·ln qty, R² 0.18)320 plotted bids, 5 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 668-7091 (Prefab PM TY C (W)(Arrow)) is measured in EA. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 2,072 bids for it on 447 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,108 bids was $200.00 per EA, and the winning low bidders priced it at a weighted median of $190.00 per EA.

TxDOT's engineer's estimate for the same lines had a weighted median of $205.00 per EA, so winning bids came in 7.3% below the estimate.

By calendar year, the median bid moved from $250.00 in 2025 (960 bids) to $241.00 in 2026 (1,015 bids), down 3.6%. The middle half of 2026 bids fell between $205.00 and $280.00.

Comparing the last 12 months with the 12 months before, the median unit price fell 4%.

Quantity matters for this item. Lines of 1 to 8 EA had a weighted median of $267.42, while lines above 35 EA had $200.00, a 25% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 433 lines where both a winning and a second-place bid were published, the median winning unit price was $242.00 against $240.00 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 20 TxDOT districts with at least ten bids, Corpus Christi had the lowest weighted median ($165.00) and Dallas the highest ($252.00). The busiest district for this item was Houston.

The most recent letting with this item was on Nov 4, 2026 in Colorado County, where Ronald R. Wagner & Co., LP was the low bidder at $200.00 per EA for 94 EA against an estimate of $220.00.

11 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 668-7103 Prefab PM TY C (W)(Word) (weighted median $250.00 per EA); 668-7089 Prefab PM TY C (W)(24")(SLD) (weighted median $13.00 per LF); 666-7024 Refl PAV MRK TY I (W)8"(SLD)(100MIL) (weighted median $0.850 per LF); 666-7423 Refl PAV MRK TY I (Y)6"(SLD)(100MIL) (weighted median $0.450 per LF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
20249723$237.38$235.00$250.00$225.00$300.00
2025960213$222.25$211.25$250.00$215.00$300.00
20261,015211$208.36$200.00$241.00$205.00$280.00

Quantity bands

BandQuantity (EA)BidsWeighted avgWeighted median25th–75th pct
Small1–8729$285.73$267.42$240.00–$320.00
Medium9–34664$256.54$250.00$216.68–$290.25
Large35–961679$208.29$200.00$190.00–$250.00

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$242.00
Median second-low unit price
$240.00
Median engineer’s estimate
$247.32
Median gap, second vs. low
+0%

433 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0027-03-077 · let Nov 4, 2026 · Colorado County, Yoakum District

Line quantity 94 EA · Engineer’s estimate $220.00/EA

  • 1. Ronald R. Wagner & Co., LP

    LOW BID · WINNER
    Unit price
    $200.00/EA
    Extension
    $18,800.00
    Proposal total
    $17,597,090
    Money left on the table
    $20,400 (0.12%)
    vs. engineer’s estimate
    -9.1%
  • Unit price
    $190.00/EA
    Extension
    $17,860.00
    Proposal total
    $17,617,490
    vs. low bid
    +$20,400
    vs. engineer’s estimate
    -13.6%
  • Unit price
    $225.00/EA
    Extension
    $21,150.00
    Proposal total
    $19,218,375
    vs. low bid
    +$1,621,285
    vs. engineer’s estimate
    +2.3%
  • 4. Hayden Paving, Inc.

    Unit price
    $234.00/EA
    Extension
    $21,996.00
    Proposal total
    $19,937,821
    vs. low bid
    +$2,340,731
    vs. engineer’s estimate
    +6.4%

Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District

Line quantity 55 EA · Engineer’s estimate $215.00/EA

  • Unit price
    $190.00/EA
    Extension
    $10,450.00
    Proposal total
    $35,766,135
    Money left on the table
    $890,797 (2.49%)
    vs. engineer’s estimate
    -11.6%
  • Unit price
    $262.50/EA
    Extension
    $14,437.50
    Proposal total
    $36,656,931
    vs. low bid
    +$890,797
    vs. engineer’s estimate
    +22.1%
  • 3. Tiseo Paving Company, LLC

    Unit price
    $264.00/EA
    Extension
    $14,520.00
    Proposal total
    $38,169,956
    vs. low bid
    +$2,403,821
    vs. engineer’s estimate
    +22.8%
  • 4. Harper Brothers Construction LLC

    Unit price
    $195.00/EA
    Extension
    $10,725.00
    Proposal total
    $40,441,503
    vs. low bid
    +$4,675,368
    vs. engineer’s estimate
    -9.3%

Proposal 0052-04-054 · let Nov 4, 2026 · Lamb County, Lubbock District

Line quantity 524 EA · Engineer’s estimate $260.00/EA

  • 1. Lipham Asphalt and Paving Company, LLC

    LOW BID · WINNER
    Unit price
    $300.00/EA
    Extension
    $157,200.00
    Proposal total
    $22,298,624
    Money left on the table
    $66,924 (0.3%)
    vs. engineer’s estimate
    +15.4%
  • Unit price
    $200.00/EA
    Extension
    $104,800.00
    Proposal total
    $22,365,549
    vs. low bid
    +$66,924
    vs. engineer’s estimate
    -23.1%
  • Unit price
    $200.00/EA
    Extension
    $104,800.00
    Proposal total
    $26,694,741
    vs. low bid
    +$4,396,116
    vs. engineer’s estimate
    -23.1%
  • Unit price
    $200.00/EA
    Extension
    $104,800.00
    Proposal total
    $27,453,405
    vs. low bid
    +$5,154,780
    vs. engineer’s estimate
    -23.1%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040027-03-077ColoradoYoakum944Ronald R. Wagner & Co., LP$200.00$220.00
2026-11-040047-04-032CollinDallas554Mario Sinacola & Sons Excavating, Inc.$190.00$215.00
2026-11-040052-04-054LambLubbock5244Lipham Asphalt and Paving Company, LLC$300.00$260.00
2026-11-040066-03-045ShermanAmarillo1382Breedon Investments USA Inc.$200.00$195.00
2026-11-040157-04-058HaskellAbilene69Lone Star Paving Company$250.00$300.00
2026-11-041052-02-098NuecesCorpus Christi25J E Construction Services, LLC$149.00$150.00
2026-11-046510-36-001HillWaco203Big Creek Construction, Ltd.$300.00$250.00
2026-11-046510-39-001BellWaco103Texas Materials Group, Inc.$300.00$300.00
2026-11-030044-06-079MontagueWichita Falls1266Breedon Investments USA Inc.$190.00$200.00
2026-11-030059-05-048ShelbyLufkin475Clark Construction of Texas, Inc.$175.00$150.00

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene94$255.00$229.72$270.00-10.32%
Amarillo45$200.00$200.00$195.00-21.05%
Atlanta87$221.45$225.75$215.00-7%
Beaumont120$175.00$210.00$222.30-8.39%
Brownwood45$180.00$200.00$206.75-15.25%
Bryan95$200.00$235.00$216.00-18.43%
Childress9$190.00$212.00$200.00—
Corpus Christi130$135.00$165.00$135.00+14.61%
Dallas116$190.00$252.00$248.00-3.39%
El Paso2$210.00$255.00$330.00—
Fort Worth50$171.00$171.00$197.00+10.71%
Houston270$190.00$225.00$200.00-3.81%
Lubbock86$300.00$200.00$260.00+20%
Lufkin65$237.00$225.00$225.00-6%
Odessa127$150.00$200.00$200.00-11.24%
Paris3$225.00$260.00$250.00—
Pharr170$125.00$180.00$160.00+7.2%
San Angelo23$220.00$220.00$242.00-9.19%
San Antonio56$200.00$200.00$200.00+0.19%
Tyler163$190.00$210.00$190.00-5.6%
Waco153$165.00$185.00$250.00+20.17%
Wichita Falls64$190.00$200.00$200.00-10.4%
Yoakum99$160.00$200.00$220.00-11.09%

Related items

Is your price for item 668-7091 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.