Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Pavement Sler 6" (Item 666-7347): TxDOT Unit Price History

2,252 bids · 399 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure LF

TxDOT 666-7347 · PAVEMENT SLER 6" · Unit: LF

Low bid
$0.150/LF
Quantity-weighted median of winning unit prices
Weighted median
$0.190/LF
Quantity-weighted median of every bid
Engineer’s estimate
$0.230/LF
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-25.53%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$1.00$2.00$3.00$4.00101001K10K100K1M10MQuantity (LF), log scaleUnit price ($/LF)
Winning (low) bid Other bid Fitted price curve (ln price = 1.54 − 0.263·ln qty, R² 0.37)320 plotted bids, 4 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 666-7347 (Pavement Sler 6") is measured in LF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 2,252 bids for it on 399 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 1,220 bids was $0.190 per LF, and the winning low bidders priced it at a weighted median of $0.150 per LF.

TxDOT's engineer's estimate for the same lines had a weighted median of $0.230 per LF, so winning bids came in 34.8% below the estimate.

By calendar year, the median bid moved from $0.500 in 2025 (1,052 bids) to $0.330 in 2026 (1,147 bids), down 34.0%. The middle half of 2026 bids fell between $0.200 and $1.00.

Comparing the last 12 months with the 12 months before, the median unit price fell 25.53%.

Quantity matters for this item. Lines of 20 to 2,296 LF had a weighted median of $1.00, while lines above 18,002 LF had $0.190, a 81% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 394 lines where both a winning and a second-place bid were published, the median winning unit price was $0.350 against $0.360 from the second-lowest bidder, a median gap of 0% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 23 TxDOT districts with at least ten bids, Laredo had the lowest weighted median ($0.150) and Abilene the highest ($3.00). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 4, 2026 in Collin County, where Mario Sinacola & Sons Excavating, Inc. was the low bidder at $0.160 per LF for 89,504 LF against an estimate of $0.170.

2 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 666-7024 Refl PAV MRK TY I (W)8"(SLD)(100MIL) (weighted median $0.850 per LF); 666-7423 Refl PAV MRK TY I (Y)6"(SLD)(100MIL) (weighted median $0.450 per LF); 666-7036 Refl PAV MRK TY I (W)24"(SLD)(100MIL) (weighted median $7.00 per LF); 666-7411 Refl PAV MRK TY I (W)6"(SLD)(100MIL) (weighted median $0.450 per LF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
20245312$0.410$0.300$0.500$0.300$1.25
20251,052190$0.270$0.200$0.500$0.250$1.00
20261,147198$0.220$0.190$0.330$0.200$1.00

Quantity bands

BandQuantity (LF)BidsWeighted avgWeighted median25th–75th pct
Small20–2,296757$1.42$1.00$0.450–$2.10
Medium2,305–17,951753$0.690$0.440$0.250–$1.00
Large18,002–2,767,660742$0.210$0.190$0.180–$0.350

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$0.350
Median second-low unit price
$0.360
Median engineer’s estimate
$0.500
Median gap, second vs. low
+0%

394 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District

Line quantity 89,504 LF · Engineer’s estimate $0.170/LF

  • Unit price
    $0.16/LF
    Extension
    $14,320.64
    Proposal total
    $35,766,135
    Money left on the table
    $890,797 (2.49%)
    vs. engineer’s estimate
    -5.9%
  • Unit price
    $0.24/LF
    Extension
    $21,480.96
    Proposal total
    $36,656,931
    vs. low bid
    +$890,797
    vs. engineer’s estimate
    +41.2%
  • 3. Tiseo Paving Company, LLC

    Unit price
    $0.25/LF
    Extension
    $22,376.00
    Proposal total
    $38,169,956
    vs. low bid
    +$2,403,821
    vs. engineer’s estimate
    +47.1%
  • 4. Harper Brothers Construction LLC

    Unit price
    $0.19/LF
    Extension
    $17,005.76
    Proposal total
    $40,441,503
    vs. low bid
    +$4,675,368
    vs. engineer’s estimate
    +11.8%

Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District

Line quantity 165,238 LF · Engineer’s estimate $0.300/LF

  • 1. Indus Road & Bridge, Inc.

    LOW BID · WINNER
    Unit price
    $0.20/LF
    Extension
    $33,047.60
    Proposal total
    $138,145,038
    Money left on the table
    $5,131,824 (3.71%)
    vs. engineer’s estimate
    -33.3%
  • 2. Rpm Xconstruction, LLC

    Unit price
    $0.20/LF
    Extension
    $33,047.60
    Proposal total
    $143,276,861
    vs. low bid
    +$5,131,824
    vs. engineer’s estimate
    -33.3%
  • Unit price
    $0.22/LF
    Extension
    $36,352.36
    Proposal total
    $152,579,077
    vs. low bid
    +$14,434,039
    vs. engineer’s estimate
    -26.7%
  • Unit price
    $0.16/LF
    Extension
    $26,438.08
    Proposal total
    $153,499,152
    vs. low bid
    +$15,354,114
    vs. engineer’s estimate
    -46.7%
  • 5. Sema Construction, Inc.

    Unit price
    $0.16/LF
    Extension
    $26,438.08
    Proposal total
    $154,136,028
    vs. low bid
    +$15,990,990
    vs. engineer’s estimate
    -46.7%
  • 6. Zachry Construction Corporation

    Unit price
    $0.17/LF
    Extension
    $28,090.46
    Proposal total
    $154,873,429
    vs. low bid
    +$16,728,392
    vs. engineer’s estimate
    -43.3%

Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District

Line quantity 6,368 LF · Engineer’s estimate $0.300/LF

  • 1. Fluor Enterprises, Inc.

    LOW BID · WINNER
    Unit price
    $0.50/LF
    Extension
    $3,184.00
    Proposal total
    $30,209,876
    Money left on the table
    $2,977,718 (9.86%)
    vs. engineer’s estimate
    +66.7%
  • Unit price
    $0.30/LF
    Extension
    $1,910.40
    Proposal total
    $33,187,594
    vs. low bid
    +$2,977,718
    vs. engineer’s estimate
    0%
  • Unit price
    $0.20/LF
    Extension
    $1,273.60
    Proposal total
    $33,911,798
    vs. low bid
    +$3,701,922
    vs. engineer’s estimate
    -33.3%
  • Unit price
    $0.50/LF
    Extension
    $3,184.00
    Proposal total
    $34,862,676
    vs. low bid
    +$4,652,800
    vs. engineer’s estimate
    +66.7%
  • Unit price
    $0.25/LF
    Extension
    $1,592.00
    Proposal total
    $39,237,828
    vs. low bid
    +$9,027,952
    vs. engineer’s estimate
    -16.7%
  • Unit price
    $0.25/LF
    Extension
    $1,592.00
    Proposal total
    $39,562,405
    vs. low bid
    +$9,352,529
    vs. engineer’s estimate
    -16.7%
  • Unit price
    $0.26/LF
    Extension
    $1,655.68
    Proposal total
    $39,630,699
    vs. low bid
    +$9,420,823
    vs. engineer’s estimate
    -13.3%
  • Unit price
    $0.53/LF
    Extension
    $3,375.04
    Proposal total
    $39,994,995
    vs. low bid
    +$9,785,119
    vs. engineer’s estimate
    +76.7%
  • 9. Zachry Construction Corporation

    Unit price
    $0.21/LF
    Extension
    $1,337.28
    Proposal total
    $42,444,061
    vs. low bid
    +$12,234,185
    vs. engineer’s estimate
    -30%
  • 10. Brizo Construction, LLC

    Unit price
    $0.55/LF
    Extension
    $3,502.40
    Proposal total
    $43,708,350
    vs. low bid
    +$13,498,474
    vs. engineer’s estimate
    +83.3%
  • Unit price
    $0.20/LF
    Extension
    $1,273.60
    Proposal total
    $44,387,970
    vs. low bid
    +$14,178,094
    vs. engineer’s estimate
    -33.3%
  • Unit price
    $0.53/LF
    Extension
    $3,375.04
    Proposal total
    $48,396,973
    vs. low bid
    +$18,187,097
    vs. engineer’s estimate
    +76.7%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040047-04-032CollinDallas89,5044Mario Sinacola & Sons Excavating, Inc.$0.160$0.170
2026-11-040195-02-092DentonDallas165,2386Indus Road & Bridge, Inc.$0.200$0.300
2026-11-040212-03-058BrazosBryan6,36812Fluor Enterprises, Inc.$0.500$0.300
2026-11-040923-06-068BrownBrownwood3426Jay Mills Contracting, Incorporated$0.220$0.850
2026-11-030015-13-432TravisAustin117,6206Austin Bridge & Road Services, LP$0.170$0.700
2026-11-030022-03-032TerrellOdessa2,7067The Truesdell Corporation$4.00$1.20
2026-11-030038-01-107WebbLaredo1,5964Hjc Farms, Inc.$0.680$0.200
2026-11-030044-06-079MontagueWichita Falls239,2456Breedon Investments USA Inc.$0.120$0.350
2026-11-033330-01-011McLennanWaco2,3469The Levy Company, LLC$0.630$0.500
2026-10-146502-76-001EllisDallas65,0002Stripe-A-Zone, LLC$0.200$0.200

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene23$2.30$3.00$1.26—
Amarillo57$1.38$2.00$1.00+81.82%
Atlanta14$0.540$0.550$0.500—
Austin77$0.170$0.500$0.700-52.43%
Beaumont63$0.080$0.180$0.1100%
Brownwood33$1.00$0.270$0.520—
Bryan76$0.500$0.300$0.300+76.06%
Childress38$0.950$1.00$0.650-51.7%
Corpus Christi34$0.350$0.450$2.00—
Dallas481$0.200$0.200$0.240-16.67%
El Paso6$0.500$0.500$1.00—
Fort Worth239$0.150$0.180$0.150-23.08%
Houston136$0.200$0.200$0.150+8.7%
Laredo101$0.150$0.150$0.250+2.56%
Lubbock5$0.700$0.700$1.25—
Lufkin14$0.290$1.09$0.750—
Odessa45$0.350$0.250$0.500-60%
Paris77$1.10$1.00$0.300+83.49%
Pharr75$0.400$0.420$0.700-8.67%
San Angelo34$0.350$0.320$1.30-58.22%
San Antonio351$0.190$0.210$0.230-28.57%
Tyler111$0.100$0.200$0.200-43.1%
Waco83$0.080$0.160$0.200-18.03%
Wichita Falls34$0.120$0.150$0.350-60%
Yoakum45$0.400$0.400$1.00-48.78%

Related items

Is your price for item 666-7347 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.